Dissertation > Excellent graduate degree dissertation topics show

The Research of Production Planning for Iron and Steel Enterprise

Author: ZhangYanWen
Tutor: WuDi
School: Shanghai Jiaotong University
Course: Business Administration
Keywords: production planning iron and steel enterprise bottleneck on-time-delivery
CLC: F273
Type: Master's thesis
Year: 2011
Downloads: 44
Quote: 0
Read: Download Dissertation

Abstract


The main topic of the production of iron and steel enterpriseplanning and optimization problems, research is mainly directed against aspecific path of the iron and steel enterprises to specific examples ofanalysis, the method has some general significance.The research significance, background, relying on the Germancompany Thyssen Krupp has the world’s most advanced steel productiontechnology, construction technology leadership initially obvious, but theadvantage is gradually lost, it is difficult to give enterprises more rapidsustainable development and high expected profits.Krupp have been gradually reduce its own leading edge technology,the planning process for the production of the various contradictions,such as the frequent replacement of varieties of steel, accurate forecastsof demand information, demand fluctuations in the control and so there isno reasonable solution, production planning program has not closely co-ordinated. Manufacturing operations resulting there creating low-orderdelivery rate every year, far below the expected target, the crux of theproblem has become the operations and management problems to besolved.In this paper, the crux of the Krupp company,"low on timedelivery", the realities of production and design of the actual productioncapacity compared to find the operational aspects of the production line isproducing some of the bottlenecks and problems confronting theproduction plan.In this paper, the production capacity of product-oriented processaccounting method, analyze which aspects of a production process in theshort board, affect the overall production capacity. Were fitted to the steelbusiness and in accordance with the actual orders Krupp productionsystem program control. For bottlenecks, a more rational plan and adjustthe master production plan, both to meet market demand, but also canimprove production efficiency, reduce costs and improve profits.

Related Dissertations

  1. The Study on Entrepreneur of Nanjing Rural Youth,D432.6
  2. Television variety show of cities,G222
  3. TV development bottleneck cities and Competition Strategy,G222
  4. Production Planning Simulation of Pipe Processing Shop in Shipyard,U673.2
  5. The Transformation of Private-run Book Industry to Publishing,G239.2-F
  6. Analysis on Problems and Solutions of "Bottleneck Phase" of Middle School Campus Group Dancing in Changchun City,G633.96
  7. Research on Multi-time Period Production and Procurement Plan of Supply Chain under Uncertainty,F273
  8. The Applied Research Concerning the Credit Financing of Small and Medium Enterprises to Soleve the Bottleneck,F832.4
  9. The Operation Scheduling System for Blooming Mill in Continuous-casting and Finishing-rolling Stages,F273
  10. One Production Planning Method and It’s Using Research at W Factory,F224
  11. Research on Production Scheduling Problems for Make-to-order Apparel Enterprise,F273;F224
  12. The Research on the Choke Point of the Shaanxi Kiwifruit Industry and Its Development,F326.13
  13. A Study of Production Planning and Inventory Optimization in a Company,F273;F224
  14. Research on Anshan Iron and Steel Enterprise Environmental Management Strategy,F426.31
  15. Recruitment Management System,TP311.52
  16. Forecasting Based Order Management System for Shanghai Yungtay Elevator Equipment Co., Ltd.,F426.4
  17. Zoomlion concrete company ERP system design and development,TP311.52
  18. Research on the Vehicles Management and Control System for Sales Logistics of a Giant Iron and Steel Enterprise,F252;F426.31
  19. Research on Customer Management System for Sales Logistics of Iron and Steel Enterprise,TP311.52
  20. The Thought after the Pursue to Journalism for People’s Livelihood,G222
  21. Research on Multi-time Period Production and Procurement Plan of Supply Chain under Uncertainty,F224

CLC: > Economic > Economic planning and management > Enterprise economy > Production management
© 2012 www.DissertationTopic.Net  Mobile