Dissertation > Excellent graduate degree dissertation topics show

Research on Integrated Optimization for Lot-sizing Plan and Payment Schedule of Prefabricated Parts

Author: WangCong
Tutor: LiuZhenYuan
School: Huazhong University of Science and Technology
Course: Systems Engineering
Keywords: Prefabricated Parts Production Lot-sizing Plan Payment Schedule IntegratedOptimization Construction Supply Chain
CLC: N945.12
Type: Master's thesis
Year: 2013
Downloads: 6
Quote: 0
Read: Download Dissertation

Abstract


In recent years, the companies which produce prefabricated parts enjoy swift growth,but the majority of them are stuck in inefficient management. It is a complicated systemsengineering to manage the companies for their daily operations. Whether managers canmake production schedule plan and payment schedule plan efficiently, according to thecompanies’ internal and external conditions, makes great effects on their competitivenessand survival ability development.The study has conducted in the environment of contractor-prefabricated partproducer-raw material supplier construction supply chain. In this kind of constructionsupply chain, each member is responsible to pay its upper members for their service.Payment schedule plan makes great effect on the capital held by prefabricated partproducer, then influences the production plan and procurement plan. In this thesis, theintegrated optimization model for lot-sizing plan and payment schedule of prefabricatedparts has been established, after the properties of logistics, cash flow and information flowhave been analyzed deeply. The model is related with many research fields, such aslot-sizing plan, payment schedule optimization, construction supply chain, and so on. Itcan support managers to make integrated scheduling plan including payment schedule,production plan and raw material procurement plan. The relationship between the netpresent value of profit and the parameters in production and payment activities has beenanalyzed, both in single-level-payment pattern and two-level-payment pattern. Then basedon the achievement above, production optimization rules and payment schedule plannegotiating guidance have been summarized.By the analysis of production case, It has proved that the integrated optimizationmodel can make efficient production operation and increase the net present value ofproduction profit.

Related Dissertations

  1. Research on Text-based Protocol Principle-based Dispute Resolution Model in the Construction Supply Chain,C912.3
  2. Studies on Construction Supply Chain Performance Evaluate Indicator System and Its Application Based on BSC-SCOR,F426.92;F224
  3. Construction Supply Chain Partner Selection,F274
  4. Concrete Construction Supply Chain Quality Tracking System,TU755
  5. The Research on Construction Supply Chain Modeling Language,TP312.1
  6. Supply Chain Optimization Research of Multi-Project-An Owners’ Perspective,F274
  7. Research on General Contracter and Subcontractor Cooperative Management in Construction;research on General Contracter and Subcontractor Cooperative Management in Construction,F224
  8. Integrated Optimization of the Dual-code Network Plan,F062.4
  9. Research of CSCM Theory on the Multi-regional and Multi-project Engineering,F284
  10. Study on Selection of Construction Material Suppliers and Joint Optimization of Multi-stage Inventory,F274
  11. Lean Theory-Based Construction Supply Chain Management System,F274
  12. Research on Inventory-Distribution Integrated Optimization for VMI Systems,F253.4
  13. Research on Construction Supply Chain Executive Information System,TP311.13
  14. Research on the Incentive Mechanism of Construction Supply Chain Based on Joint Procurement,TU712
  15. BIM technology of Construction Supply Chain Management Research Based on information flow,TU712
  16. A Research of Green Construction Management Model Based on Supply Chain,TU71
  17. The Research on the Management of Construction Supply Chain Based on the General Contractor Mode,F224
  18. Study on Integrated Optimization and Safety Monitoring Information System of Railway Dangerous Goods Stations,U294.83
  19. Material Flow Optimization of Supplychain of High-Speed Railway Construction Based on Modularity,U215.1
  20. Research on Cosntruction Supply Chain Coordination and Optimization Based on Computational Experiment,TB497

CLC: > SCIENCE AND > Journal of Systems Science > Systems Engineering > Systems Analysis > System model,system modeling
© 2012 www.DissertationTopic.Net  Mobile