Dissertation > Excellent graduate degree dissertation topics show

Research on200Km/h and above Railway Trains Speed Matching Technology and Scheme

Author: JiangZuoLiang
Tutor: TianChangHai
School: China Academy of Railway Sciences
Course: Transportation Planning and Management
Keywords: speed matching carrying capacity of the block section coefficient oftrain removal
CLC: U292.4
Type: Master's thesis
Year: 2013
Downloads: 10
Quote: 0
Read: Download Dissertation

Abstract


As more and more200km/h and above railway lines have been completed in recent years, how to scientifically conduct the railways under construction and in the pipeline with the help of the railways mentioned is an important issue that we are facing. Since2011,200km/h and above train speed matching problem has become the center of attention during the Main railway technology policy revising. And200km/h and above railway lines’transport organization mode and skylight way are different from existing railway’s, such as travel speed, so the calculation method of existing railway is not suitable for200m/h and above railway. Based on the background, this thesis focuses on the200km/h and above train speed matching problem and takes some real examples to analyze and arrive at a series of conclusions.The thesis starts from the perspective of train operation management, the thesis analyzes the existing problem between speed trains sharing the same line, to discuss on speed matching problem. This paper gives the method of railway carrying capacity from theoretical research and case study of200km/h and above railway. Choose the maximum speed of non-stop train as a basic train, count deduction coefficient of stops train and non-stop train and carrying capacity of speed match of different train.Answer the problem of200km/h and above rail which can take into account the ordinary passenger train and cargo train, and finally how to balance the freight.The ideas and conclusions of this thesis have some significance in constructing and operating the200km/h and above railway lines.

Related Dissertations

  1. Research on Performance Matching of Electric Auxiliary Driving for Wheeled Milling Machine,U415.52
  2. Optimization of Strip Steel Slitter Line System and Research on Rension Modeling,TG335.11
  3. Research on Airborne Guidance Weapon Transfer Alignment,TJ762.2
  4. Research on Fused Deposition Modeling Technology of Wood Plastic Composites,TB332
  5. Research on the Optimal Design and Matching Performance under Variable Speed of a Contra-rotating Axial Flow Fan,TH432.1
  6. Research on Performance Matching of Two-speed Hydraulic Chassis for Wheeled Milling Machine,U415.5
  7. Research on the Speed Matching of Passenger/Freight Trains on Existing Liens with Max. Speed of 200km/h,U292.52
  8. A Study of the Calibration for Matching Errors in High Speed, High Resolution CMOS D/A Converters,TN792
  9. FOG strapdown vertical datum,U666
  10. East Longhai Line 200km / h speed passenger train speed matching scheme after study,U292.43
  11. The Urban Rail Transit Train Regulation Research Based on Predictive Control,U292.8
  12. Simulation System Modeling and Analysis for Technical Operation of Railway Marshalling Station,U292.16
  13. Capacity Assessment Method and Enhancement Measures of Electronic-Multiple-Unit Sections on Classical Railway Lines,U292.52
  14. The Research on the New Transportation Organization Plan of Wuhan Terminal After the Operation of North Wuhan Marshalling Yard,U292
  15. The Optimization of Train’s Dispatching and Decesion-making Based on Passenger Station,U292.4
  16. Study on Compilation for Stage Plan of Railway Marshalling Yard Based on Genetic Algorithm,U292.16
  17. Research on Iterative Optimization Method for Train Service Plan of High-speed Railway,U292
  18. Study on the Operation Scheme and Optimization of Railway Luggage and Parcel Express Special Train,U292
  19. Research on Rescue Resources Dispatching of Railway Emergent Event,U292.4
  20. High-speed rail , \,U292
  21. Lorry station dwell time index analysis method and system design,U292.4

CLC: > Transportation > Rail transport > Rail transport management projects > Organization of train > Trains run organization and scheduling of work
© 2012 www.DissertationTopic.Net  Mobile