Study on Theory and Method of Large-Scale Engineering Project Administration

Author: WangXiao
Tutor: SongJiRong
School: Southwest Jiaotong University
Course: Structural Engineering
Keywords: large-scale engineering project management whole optimum management dynamic optimum synthesize effect laying calculation analysis
CLC: F284
Type: Master's thesis
Year: 2005
Downloads: 1889
Quote: 38
Read: Download Dissertation

Abstract


Engineering project is performed under the various natural condition and complicated social circumstance. It is a combination process of production and consumption with the feature of long last-time, vast investment, complicated internal tructure and broad external relationship, large -scale engineering project not only have those features, but also have its own special ones. It always involves different country, different nations, different political and economical background. The difficulty of normal engineering project management is not compare to large-scale one’s.As is known, self-contradict always exits in a project’s life cycle. Speak in all, both investor and governor hope the project can gain expected performance, whatever any condition take place during its building process; at the same time, they alse hope they can catch and revise any accidental condition which possible influence the last management result during this process, so that make a project goes forward to their hope direction.So, the key of a large-scale engineering project management is how to improve management system’s flexibility adapts to changes ability and Anti- risk ability on the base of keeping its total management target contant.At first, this text put forward a day-cost dynamic optimum analysis method and synthesize effect laying calculation analysis model with operational research theory.Then, the text introduct further the apply of the mentioned analysis models in large-scale engineering project management with the microlite-rock project of Chongqing zhaohua science and technology(group) share company ltd. At last,the text discuss simply our country’s large-scale project contarct and management condition and effort direction while comparing systematically three contractor of China. The United States and Japanese in large-sclae engineering project contract field.

Related Dissertations

  1. Dynamic Analysis and Optimum Design of Girder Erection Machine Structure,U445.36
  2. Analysis and Optimum Design of the Nitric Acid 4 in 1 Unit Foundation,TH122
  3. Hypersonic vehicle aerodynamic optimization methods,V211.4
  4. Dynamic Optimum Design of Gantry Container Crane Structure System,TH213.5
  5. Study on Dynamic Characteristics for AMB Suspension Rotor,TH133.3
  6. Xinjiang Oilfield Ground Construction Cost Indicators and Management Information System Study and Application,F284
  7. Risk analysis and monitoring information system integration projects in Application,F284
  8. The Bidding Process Risk Management of Urban Pubilc Facilities Projects,F284
  9. Construction Engeneering Sub-Contract Legal System Research,D922.297;F284
  10. Lishui Cogeneration Project Schedule Management of Research,F284
  11. The Relationship of Notification of Award and Construction Contract,F284
  12. Project Management Enterprises to Carry Out Project Management Research,F284
  13. Construction Quality Management Research in Office Building Construction Projects,F284
  14. Study on Dredging Engineer Contract Project Risk Management,F284
  15. Research and Application of Project Risk Dynamic Management Based on Three Dimensions Structure,F284
  16. Study on EPC Mode in Chinese Urban Sewage Treatment Engineering,F284
  17. Improving the Organizational Project Management of Construction Supervision Enterprise,F284
  18. Research on the Scheduling Management of the EPC Project Base on the Earned Value,F284
  19. Researchon Risk Managementof Project Bidding,F284
  20. Asphalt Pavement Construction Quality Control of Application Process,F284
  21. Conflict Management in the Application of Project Cost Management,F284
  22. Research and Application on Risk Assessment of Bid and Tender in Construction Project Based on ISO17799,F284

CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net  Mobile