About 33 item dissertation in line with U445.466,Cantilever erection,cantilever perfusion query results,the following is 1 to 50(Search took 0.027 seconds)

  1. The Research of Different Early Maintenance Methods of Long-Span Prestressed Concrete Continuous Rigid-Frame Bridge’s Box Girder in the Cantilever Construction Segments,ZhuWeiWei/Chongqing Jiaotong University,0/19
  2. Analysis of Cradle Scaffolding Spatial Stress in Cantilever Construction,JiaZhongTao/Northeast Forestry University,0/3
  3. The Control of Linear in Long-span Continuous Beam Bridge by Cantilever Casting,HuoJian/Northeast Forestry University,0/1
  4. Space Stress Analysis of Long Span Continuous Beam Bridge in Cantilever Construction,YuKeZuo/Northeast Forestry University,0/0
  5. Study and Practice on the Control Technology of Cantilever Construction of (55+90+55)M of Continuous Girder Bridge Over South-to-North Water Diversion Project,LiJiangKun/RAILWAY,0/0
  6. Space Stress Analysis of the Pier Top Block by Cantilever Construction,ZhangYan/Northeast Forestry University,0/0
  7. Effect of Segmental Joints in Cantilever Casting Concrete Bridges on Deflection,ZhangWei/Harbin Institute of Technology,0/2
  8. Control and Prediction of Stress of Long-span Extradosed Cable-stayed Bridge’s Box Girder by Cantilever Placing,GaoFeng/Northeast Forestry University,0/79
  9. The Study of the Influence on Structural Behavior and Linear Control during the Construction Period of Cantilever Casting Continuous Beam Caused by Temperature Effect,ZhangHongYu/Beijing Jiaotong University,1/74
  10. Research on Construction Control Technology of Cantilever Hanging Basket in Fifth Qiantang River Bridge,ZhangXiaoPeng/Jilin University,1/62
  11. Zengjiang River Bridge Cantilever Pouring Construction Organization Design,XiaoZhenYong/South China University of Technology,1/87
  12. Research on Construction Control and Model Test of Cantilevering Casting Construction of Long-Span RC Arch Bridge,LiXiaoBin/Southwest Jiaotong University,7/436
  13. Study on Calculation Method of Optimal Stayed-Buckle Cable Force for Reinforced Concrete Arch Bridge with Cantilever Cast Method,ZhouYeJun/Southwest Jiaotong University,1/110
  14. Research on the Double-Decked Contilever Construction Control of North Approach Bridge of the Caiyuanba Yangtze River Bridge,YuanZuo/Chongqing Jiaotong University,0/57
  15. Research on Cantilevered Construction Technology for Long Spaned PC Rigid Frame Bridges,ZhangZhengQiang/Southwest Jiaotong University,3/224
  16. Cantilever Construction Control Study on Continuous Bridge in Dalian Bay,DongCheng/Dalian University of Technology,8/310
  17. Research on Error Control in Hung Basket Construction of Cantilever Job Placed Concrete,ZhangQingMing/Hebei University of Technology,0/101
  18. Span Prestressed Concrete Continuous Beam Cantilever Construction Control,SongLiJia/Southwest Jiaotong University,8/451
  19. Research and Practice on Construction Control of Long-span PC Continuous Beam Bridge by Cantilever Casting,HanHongChun/Southwest Jiaotong University,16/393
  20. Stability Analysis of Continuous Rigid Frame Bridges with Double-leg Thin-walled High Piers during Cantilever Erection,WangFei/Hunan University,9/128
  21. Research on Complex Guyed Traveler Construction Technique,ShangYong/Chang'an University,1/104
  22. Stress Analysis on Stages of Cantilever Canstruction of Large-Span Continuous Beam Bridges,XueJinShan/Hefei University of Technology,0/125
  23. Finite Element Analysis of Continuous Girder Bridge in Cantilever Construction,WangYi/Hefei University of Technology,1/129
  24. Research on Construction Control Technology of High-speed Railway Skew Continuous Beam Bridge,HuRuCheng/Guangxi University of Technology,0/59
  25. Guyed Traveler Composite Design and Application Technology,ZhangZhengPeng/Chang'an University,0/41
  26. Application of Construction Technique of Cradles in Pre-stressed Concrete Continuous Rigid Bridge,SunShuXue/Chongqing Jiaotong University,1/34
  27. Research on the Cantilevered Construction and Control of Xiao-An-Xi River Bridge,DongGuoZuo/Chongqing Jiaotong University,2/31
  28. Chang Qing Sha Bored Piles and Construction Control of Cantilever Concreting for PC Continuous Box Gird Bridge,ZhangHuaJun/Southwest Jiaotong University,0/23
  29. Studying on Cantilever Casting Prestressed Concrete Continuous Box Girder in South-to-North Water Diversion Project,ZhangXiuMei/Shandong University,0/21
  30. Study and Practice on Monitoring Technology of Cantilever Construction for the Songhuajiang Continuous Box Girder Bridge,ZhaoXiaoLong/Shijiazhuang Railway Institute,0/53
  31. Cantilever Casting Construction Technology of Yanghe Bridge,LiShuHao/Tianjin University,0/43
  32. Study on Construction Monitoring of Prestressed Concrete Low-pylon Cable-stayed Bridge,ChiYanBin/Chongqing University,0/108
  33. Research and Practice on Construction Control of Prestressed Concrete Contionous Girder Bridge by Cantilever Casting,LiKai/Beijing Municipal Engineering Research Institute,1/82