Dissertation > Excellent graduate degree dissertation topics show

Mobile Communication Big Station After-Project Evaluation Index System and Method of Designing

Author: ShiJie
Tutor: YuanChunZuo
School: Beijing University of Posts and Telecommunications
Course: Project Management
Keywords: Station project evaluation method after-project evaluation evaluation system
CLC: F626;F272
Type: Master's thesis
Year: 2010
Downloads: 54
Quote: 0
Read: Download Dissertation

Abstract


After-project evaluation is to analyze and evaluate to complete project in the view of system and objective, so that to determine the achievement of target, purpose, effect, benefit to the project. It is not only to judge the good or not of project development and operation, but also provide reference and experience to other projects. The traditional projects include following types: financial investment, engineering project, and public project, there are each own evaluation method and index matching above projects, but for communication station project, current there is not suitable evaluation system.It is the multi-aspects systemically analysis and summarize, comprehensive scientific evaluation to project establishment, project development, product market performance and etc. of such projects complete development, and already been in market for a while or product’s quit in market that the after-project evaluation to Mobile communication station. In order to find a suitable evaluation method to communication station industry, this article closely combines Datang Mobile Station Project’s detailed characteristics, based on existing after-project evaluation theory, discuss deeply the index system and analysis method fit in with mobile station industry, and utilize above system in both quantitative and qualitative analysis and evaluation to TDR2000 station project. Through scientific reasonable evaluation process, utilizing process evaluation method, benefit evaluation method, presence and absence comparison method, it is to evaluate TDR2000 by after-project’s view of project target, process control, quality status, financial benefit, science benefit, continuous development and others.

Related Dissertations

  1. Construction and improvement of basic education reform process evaluation platform,G521
  2. A Study on University Science and Technology Innovation Environment Evaluation,G644
  3. Study on the Results of Heilongjiang University’s Social Science Research Evaluation System,G644
  4. The Research on Evaluation Method of Highway Ecosystem Healthy,X826
  5. The Comparative Study of Competitive Advantage in the Self-Owned Clothing Brands of Beijing,F426.86
  6. The Research on Selection and Evaluation of Emergency Logistics Corridor,X43
  7. Performance Evaluation System Optimization Design of the Extend the Yan Chang Oil Industry and Co., LTD,F272.92
  8. On the Program for Evaluating and Cultivating the Core Competitiveness of GY University Press,G239.22
  9. Research of Creative Skill Evaluation System in Vocational Colleges,G647.38
  10. Building the Performance Appraisal System for the Economic Cooperation and Service Bureau of XiGu District Lanzhou City,F127
  11. Research on Marketing Team Achievements Inspection System of FangDa New Material (Jiangxi) Limited Company,F426
  12. Based on performance evaluation study of the production line of the factory physics,F273
  13. Research on the Investment Project Evaluation and Management of Dongguan Telecom,F626
  14. The Empirical Research for Evaluation Index System of "Happiness Guangdong" Under the Perspective of Government Performance,F127;F224
  15. Application Research of Regional Human Resource Comprehensive Competitive,F224
  16. Research on the Regional Innovation Capability in Liaoning Province,F127
  17. Research on Optimal Selection of Expressway Program Based on AHP and Fuzzy Comprehensive Evaluation Method,F542;U412.366
  18. Study of the Selecting of Indicators in Regional Water Environmental Planning,X321
  19. Study on Pickling Dynamics and Quality Evaluation Model of Preserved Eggs,TS253.46
  20. Graded Management and Evaluation of Equipment Overhaul Production Safety,F273;F426.31
  21. Sichuan XX oil depot relocation project economic evaluation,F282

CLC: > Economic > Economic planning and management > Enterprise economy > Enterprise planning and management decision - making
© 2012 www.DissertationTopic.Net  Mobile