|
Post-project evaluation as verification Projects Investment Decision , lessons learned , promote the project decision-making more scientific and standardized , as well as an effective means to improve project management responsibility and management level , increasingly project decision-making and management bodies attention and acceptance , gradually been widely used in our country . Some foreign government and organizations , especially the Asian Development Bank , World Bank and other organizations as early own post-project evaluation fixed as workflow an important content. Based on the characteristics of the electric power industry , the specific combination of power transmission project , evaluation of the comprehensive evaluation system to address the project , specific project process evaluation, impact evaluation, effectiveness evaluation, equipment and technology evaluation, and sustainability thick evaluation should include , in power projects on the basis of this analysis , the evaluation index system . Specific practical projects after evaluation , 220 kilovolt power transmission project in Hohhot aerospace as an example , using the implementation of the project management evaluation method of pre- project evaluation of the project , construction and implementation of the evaluation , the investment control evaluation , basic management and evaluation indicators evaluation ; a production run evaluation method , after the conclusion based on the feasibility studies of the project , combined with the necessity of the construction of the power transmission and transformation project , using logic diagram for process evaluation ; economic benefit evaluation method after the completion of the project investment of financial and social benefits of after evaluation , the calculation of the project is put into production after the actual financial evaluation , reflect aspects of the project or enterprise profitability , solvency , operational capabilities and development capabilities ; impact through the project evaluation , evaluation and evaluation of air pollutants prevention measures measures of water pollutants , solid waste disposal measures , noise measures and electromagnetic radiation treatment measures , oil pollution treatment measures the results of the implementation of the control measures . Finally, the project degree of success of Inner Mongolia, Hohhot aerospace 220KV power transmission project to carry out comprehensive analyzes , summarizes come to the project after evaluation findings
|