Dissertation > Excellent graduate degree dissertation topics show

Post Evaluation of Electric Power Construction Project

Author: FengMaoSen
Tutor: SunHui;LiuHongYao
School: Tianjin University
Course: Project Management
Keywords: Power construction projects After evaluation Project degree of success Comprehensive Evaluation
CLC: F426.61
Type: Master's thesis
Year: 2010
Downloads: 158
Quote: 0
Read: Download Dissertation

Abstract


Post-project evaluation as verification Projects Investment Decision , lessons learned , promote the project decision-making more scientific and standardized , as well as an effective means to improve project management responsibility and management level , increasingly project decision-making and management bodies attention and acceptance , gradually been widely used in our country . Some foreign government and organizations , especially the Asian Development Bank , World Bank and other organizations as early own post-project evaluation fixed as workflow an important content. Based on the characteristics of the electric power industry , the specific combination of power transmission project , evaluation of the comprehensive evaluation system to address the project , specific project process evaluation, impact evaluation, effectiveness evaluation, equipment and technology evaluation, and sustainability thick evaluation should include , in power projects on the basis of this analysis , the evaluation index system . Specific practical projects after evaluation , 220 kilovolt power transmission project in Hohhot aerospace as an example , using the implementation of the project management evaluation method of pre- project evaluation of the project , construction and implementation of the evaluation , the investment control evaluation , basic management and evaluation indicators evaluation ; a production run evaluation method , after the conclusion based on the feasibility studies of the project , combined with the necessity of the construction of the power transmission and transformation project , using logic diagram for process evaluation ; economic benefit evaluation method after the completion of the project investment of financial and social benefits of after evaluation , the calculation of the project is put into production after the actual financial evaluation , reflect aspects of the project or enterprise profitability , solvency , operational capabilities and development capabilities ; impact through the project evaluation , evaluation and evaluation of air pollutants prevention measures measures of water pollutants , solid waste disposal measures , noise measures and electromagnetic radiation treatment measures , oil pollution treatment measures the results of the implementation of the control measures . Finally, the project degree of success of Inner Mongolia, Hohhot aerospace 220KV power transmission project to carry out comprehensive analyzes , summarizes come to the project after evaluation findings

Related Dissertations

  1. Construction and improvement of basic education reform process evaluation platform,G521
  2. Quantitative evaluation model based on information entropy of the classroom observation,G632.4
  3. Implementation Study of evaluation method of the high school IT courses,G633.67
  4. Research on Hyperspectral Image Compression Method Based on Information of Interest,TP391.41
  5. Research on Evaluation of Simulation Systems Based on Fidelity,TP391.9
  6. Multi-currency Notes Technology Research and Implementation,TP391.41
  7. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  8. The Research on the Performance Results Application of Zhaoqing Power Supply Bureau,F272.92
  9. Research on Index System and Evaluation of University Office Greening,G647
  10. A Study on University Science and Technology Innovation Environment Evaluation,G644
  11. Study on the Results of Heilongjiang University’s Social Science Research Evaluation System,G644
  12. The Study on Risk Evaluation of BOT Projects in China University,G647
  13. Municipal tourism land use planning environmental impact assessment,X820.3
  14. Analysis of Nutritional Compositions and Quality of Shishen (Eremurus Chinensis Fedtsch.),S647
  15. The Teaching Evaluation of Chinese in Junior School,G633.3
  16. Yellow phosphorus storage tank area of Safety Evaluation,TQ126.317
  17. Studyon Thermal-Wet Comfort of Women’s Table Tennis T-Shirt,TS941.15
  18. Professor Kong Guangyi academic thought Qing Xuan main Treating children cold cough,clinical research and clinical experience,R249.2
  19. Application of Improved Principal Component Analysis Algorithm in Course Construction,G642.4
  20. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  21. Evaluation Index System Structure of University Students’ Choreographing Capability of Physical Education Aerobics Majors,G831.3

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile