Dissertation > Excellent graduate degree dissertation topics show

The Study on the Whole-Process Cost Management Mode over Expressway Project

Author: LiXueXia
Tutor: LiYuanFu;XuJunMo
School: Southwest Jiaotong University
Course: Architecture and Civil Engineering
Keywords: cost control the whole-process highway engineering method Whole life cycle Theories
CLC: U415.1
Type: Master's thesis
Year: 2007
Downloads: 383
Quote: 9
Read: Download Dissertation

Abstract


In recent years, the highway construction because of the huge social effect and the economic benefits that it might brought, gradually became the key point of the infrastructure investment, and the country fund in the highway project is also increasing progressively year by year. But actually the phenomenon often produces in the highway construction process that is "the final accounts exceeds the budget, the budget exceeds the budgetary estimate, and the budgetary estimate exceeds the project estimate", so it causes the design budgetary estimate not to control the total investment of the project. Therefore in the highway project construction process, the project owner lacked the effective monitoring measure and the control method to the investment, at present it becomes the main question in the highway investment management of our country.This article from the highway project owner’s angle, citing the whole-process control theory of the model architectural engineering, researches the cost control method of each main stage in the highway whole-process construction detailiy. The main content and avhievements as follows:1.At the base of analyzing the highway investment component, the process of the highway project investment control is divided into five important stages, that is: the project decision stage, the design stage, the bidding stage, the construction stage, the completion acceptance stage, then they are carried on study separately, and the corresponding cost control goal is proposed on each main stage.2. The value engineering method、Whole life cycle Theories and Indetermination analysis method is utilized in the optimization of the highway design plan. On the foundation of analyzing the principle and utilization steps to this method, this method’s control function to the design stage investment is explained by the example.3. According to the project cost control methods which has been summarized, and aimming at the concrete characteristics of the highway project, some effective investment control measures are proposed the separate stage.

Related Dissertations

  1. The Research on Comprehensive Budget Management of Highway Operation Management Units,F540.58
  2. The Research on Evaluation Method of Highway Ecosystem Healthy,X826
  3. Study on the Internal Control Issues of Highway Construction Investments,F540.34
  4. Vocational Training Base Construction Project Cost Control,G712.4
  5. JF company \,F426.72
  6. Whole Process Dynamic Management Research about Strategic Asset of Enterprise,F224
  7. Design and Implementation of J2EE highway electronic toll collection system,TP311.52
  8. Whole Process Management of Basic Construction Projects、 Study of the Ways of Auditing Efficiencies,F239.4
  9. Operators ICT projects full process management system construction and practice,F626
  10. Study on Fault-tolerant Guaranteed Cost Control for Nonlinear Systems,TP13
  11. Based on fuzzy reasoning annular multi -stage inverted pendulum modeling and control,TP13
  12. A class of uncertain linear discrete delay singularly perturbed systems Guaranteed Cost Robust Control and Research,TP13
  13. Study and Analysis on the Control of Cost in Highway Construction Project,F284
  14. Coordination between Quality Control and Speed Control over Highway Big Repair Project,F284
  15. HN CCB the Provident Fund extract repayment project cost management research,F832.4
  16. The Study on the Marine Engineering Production Cost Control Method Based on Project Management Technology,F406.72
  17. H Company Vehicle Logistics Cost Control of Projects,F426.471
  18. The Management and Control of Computer Virus Response Project Oriented,TP309.5
  19. Exploiting Techniques of Operating Management System for Highway Driving Safety under Adverse Weather Condition,TP311.52
  20. CAD of Three-dimension Highway Routes Selection,TP391.41
  21. Study on the Occurrence Mechanism of Rock Burst in Zhongnan Mountain Road Tunnel,U451

CLC: > Transportation > Road transport > Road works > Road construction > Construction Management and Supervision
© 2012 www.DissertationTopic.Net  Mobile