Construction Monitoring Research of Concrete-Filled Steel Tubular Arch Bridges

Author: LiuChangSong
Tutor: ZhouHouBin
School: Southwest Jiaotong University
Course: Bridge and Tunnel Engineering
Keywords: Arch Bridge Concrete-filled steel tubular Internal force calculation Construction monitoring
CLC: U448.22
Type: Master's thesis
Year: 2007
Downloads: 185
Quote: 2
Read: Download Dissertation

Abstract


Concrete-filled steel tubular (CFST) arch bridge as a new-type bridge is widely applied in China recently. And it is a relatively ideal structural form for long-span arch bridge. It has been growing up rapidly in our country in recent years, and it can luckily make agreement with the factual situation of bridge engineering. The erection of the main arch-ring of CFST arch bridge is a complex process, in order to certify the arch line and static structure behavior in the finished state that meet the requirement of design, it is very necessary that the construction monitoring be adopted in the whole construction.With the real situation of the Mianjiang river bridge that is under construction in Ruijin City, Jiangxi Province. Firstly, the summary of the erection methods of CFST arch bridge, and brief analysis advantages and disadvantages of several erection methods and its application range. Secondly, the structure and construction of CFST arch bridge be made more detailed introduction, and it be analyzed of the structural calculation.Furthermore, with the erection of the arch-ring of CFST arch bridge as the main research route, both deformation and stress (strains) are monitored where the section deflections of steel tubular arch ribs and the deviation of the arch axis line are key issues. At the same time, the development of stress (strains) is monitored. Through the internal forces calculation of structure model during the erection of CFST arch bridge, the calculated results and the measured results obtained in site are compared, and it can be referenced in the next research of this type of structures

Related Dissertations

  1. The Construction Monitoring and Deformation Control and Analysis of the Box Culvert Jacking of the YouQuan Road Through the Hukun Railway,U449.5
  2. Optimal Design of Suspender Replacement in Concrete Filled Steel Tubulur Arch Bridge,U448.22
  3. Lancang steel pipe reinforced with concrete arch bridge seismic performance analysis,U442.55
  4. Concrete Tied Arch nonlinear mixed- discrete variables optimization design,U448.225
  5. Leaning Type the arch bridges reasonable into bridge cable force and construction phase Cable Forces,U441
  6. Vehicles and branch steel box arch bridge static and dynamic computational analysis and experimental space,U441
  7. Large-span steel box basket handle arch bridge dynamic characteristics of the high-speed rail and earthquake response analysis,U442.55
  8. High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
  9. Ningbo-Taizhou- Wenzhou Railway Yandangshan King the superimposed arch bridge construction key technology research,U445.4
  10. Dynamic characteristics of large - span steel box tied arch bridge and train running performance analysis,U441.3
  11. Research on the Damping Performance of Tandem Vibratory Rollers,U448.22
  12. Analysis of the Influence of Lateral Brace on the Seismic Response of Concrete-Filled Steel Tube Arch Bridge,U441.3
  13. The Construction Control for PC Continuous Beam Bridge,U445.4
  14. Static and Dynamical Characteristic Analysis and Experimental Investigation on Large Span Half-through CFST Arch Bridges,U441.3
  15. Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
  16. Several Key Technology Concrete-filled Steel Tube Arch Bridge,U448.22
  17. Research on the Structural Performance of Half-through Arch Beams Combined System Bridge,U448.22
  18. Deteriorations Analysis and Strenthning Study for Concrete-Filled Steel Tubular Arch Bridge,U445.7
  19. Static Behavior Analysis of Concrete-filled Steel Trussed Arch Bridge with Rectangular Hollow Section,U441
  20. Concrete-filled Steel Tubular Basket-handling Arch Bridge Vertical Swivel Construction Control Simulation Analysis,U445.465
  21. A Technique Research on Maintaining the Foundationpit of the Large Passenger Railway Station,U231.3

CLC: > Transportation > Road transport > Bridges and Culverts > All kinds of bridges > Bridge: Structure > Arch bridge
© 2012 www.DissertationTopic.Net  Mobile