Dissertation > Excellent graduate degree dissertation topics show
Comprehensive Evaluation of BRT System Construction and Operation Level Based on Uncertain Mathematical Methods
Author: JinCaiFu
Tutor: DongHongZhao;JinLing
School: Zhejiang University of Technology
Course: Mechanical and Electronic Engineering
Keywords: BRT Comprehensive evaluation Matter-element extension method Grey clustering
CLC: U491.17
Type: Master's thesis
Year: 2011
Downloads: 115
Quote: 0
Read: Download Dissertation
Abstract
|
Along with the rapid economic growth in China, and the improvement of urbanization and motorization level, the traffic problem is becoming increasingly conspicuous. Bus rapid transit (BRT) is a kind of large-capacity, flexible, fast, comfortable, and advanced green public transportation means. Its investment cycle is short, and it is cheap. This is used to ease the urban traffic problems, and to improve the public transport service level. It is used to improve the urban economic efficiency, and to protect urban environment. It appears to be an opportunity of solving the traffic problem in big cities. The development of BRT in China now has five or six years’history. It becomes an indispensable part of city public traffic for its unique advantage. Evaluation at present construction and operation level of BRT, can find out BRT operation and the problems existing in the layout, guide the rapid transit network layout, adjust the operation mode, and improve the service quality. The express bus line becomes as soon as possible a route fast channel.This will be helpful to ease traffic pressure, and to promote the urban sustainable development.This paper systematically studies the urban BRT evaluation situation at home and abroad, and analyzes the existing problems in the evaluation of BRT. Considering the fact that urban BRT construction and operation level comprehensive evaluation is complex, difficult to achieve the objective, comprehensive, and to scientifically evaluate problem, analytic hierarchy process method is proposed combining with the characteristics of BRT. A comprehensive evaluation index system of recursive class time structure is set up, from the BRT facility level, service level, efficiency level and sustainable development level four aspects. Based on the BRT construction and operation level comprehensive evaluation index quantification, the rating of the index division standard is put forward. On this basis, the paper presents the matter-element extension analysis and gray clustering which belong to uncertain mathematics methods, to construct level comprehensive evaluation model. Through this model, makes the construction and operation level of multi-layer goal evaluation boil down to single objective decision. Many qualitative analysis turn into quantitative analysis, clearly reflecting the urban BRT construction and operation level, making complicated traffic evaluation problem be simplified. Evaluation process becomes more objective and more operational.This paper is based on the development of hangzhou BRT for background. Uncertain mathematics method is used to evaluate the urban BRT construction and operation condition and influence on urban developmen, and to determine the construction and operation comprehensive evaluation level. The comparison of evaluation results proves the scientific and reasonable of the uncertain mathematic methods herein on the urban BRT construction and operation comprehensive evaluation. At last, it comes to the conclusion, and points out that the hangzhou city BRT system exists shortages, and puts forward some improvement suggestions, and provides the reference to hangzhou BRT subsequent construction, improvement and development of scientific decision.
|
Related Dissertations
- The Study on Risk Evaluation of BOT Projects in China University,G647
- The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
- Comprehensive Quality Assessment of College Students,G645.5
- Studies on Urban Characteristic Culture and Construction of Urban Landscape,S731.2
- Comprehensive Evaluation of Safety Production and Optimization of Safety for Yangcheng Coal Mine,X936
- On the Program for Evaluating and Cultivating the Core Competitiveness of GY University Press,G239.22
- Social insurance agencies risk prevention research,F842.6
- Research on Construction Project Schedule Planning Based on Uncertain Factors,TU722
- Evaluation and Optimization of Comprehensive Disaster-Prevention System in Lianshan, Huludao,TU984.116
- Study on Circular Economy Assessment in Plan Environmental Impact Assessment of Coal-mining Area,F426.21
- The enterprise competitors evaluation system based on fuzzy comprehensive analysis,F272
- Safety Assessment of Coal Gangue Hazard and Analysis of the Greening Reclamation,TD849.5
- The Study of Stability and Deformation for Cao Mao Mountain Tunnel,U451.2
- Research and Application Based on Location and Path Optimization of Emergency Logistics Systems,F252
- Study of Agroclimatic Resources Comprehensive Evaluate Method in Province of Liao Ning,S162.3
- Risk assessment methods in the oil overseas oil and gas exploration projects,F224
- The Research on the Stastical Modal in Cotton HVI Proficiency Testing of the Quality Controlling System,TS117
- Urban rail transportation hub guided by System,U239.5
- Highway Maintenance Performance Evaluation Institutions,U418.2
- Analysis on the Classification of Tunnel Surrounding Rocks of the Wuxi Highway in the Section from Luanchan to Xixia,U452.12
- Based on intensive land use development model of Xi'an urban space,F301
CLC: > Transportation > Road transport > Technical management of traffic engineering and road transport > Traffic engineering and traffic management > Traffic Survey and Planning > Public transport
© 2012 www.DissertationTopic.Net Mobile
|