Dissertation > Excellent graduate degree dissertation topics show

Shenyang Branch of China Merchants Bank financial products costing structure and application process

Author: NieZhuo
Tutor: ZengHua
School: Northeastern University
Course: Business Administration
Keywords: ICCF Shenyang Branch of China Merchants Bank Financial Product Costing Process Construction and application
CLC: F830.42
Type: Master's thesis
Year: 2008
Downloads: 42
Quote: 0
Read: Download Dissertation

Abstract


At present, China's banking sector cost accounting system is imperfect, resulting in inaccurate financial product costing and cost positioning and marketing decision-making mistakes, which restricts its ability to compete with the business of improving the rapid and healthy development. Among them, the products accounting processes unreasonable cost accounting system is the focus. ICC costing is giving our bank to bring new ideas and cost accounting cost allocation methods. This paper intends to solve the Merchants Bank Shenyang Branch of the problem of irrational product costing process, the existing accounting processes and Merchants Bank has been the rapid development of the Shenyang Branch of derailment, no longer applies to the current cost accounting system, resulting in increased cost of the bank, the cost of distorting the information less profitable, product loss rate. Accounting processes through advanced concept to solve the Shenyang Branch of China Merchants Bank in product costing various problems. Based on the existing Shenyang Branch of China Merchants Bank product costing process analysis of problems, pointed out the Shenyang Branch of China Merchants Bank structured product costing processes necessity and urgency. Costing and integration through costing strong comparative advantage of selected integrated costing ie ICC, and the use of an integrated method to construct a process costing Shenyang Branch of China Merchants Bank product costing process, given based on the ICCF Shenyang Branch of China Merchants Bank product costing process framework and content. Through the two products costing methods calculate the effect of data comparison and analysis, testing and certification based on the ICCF Merchants Bank Shenyang Branch of product costing process effectiveness and practicality. And gives the ICCF-based China Merchants Bank Shenyang Branch of the product costing process applications. The first chapter is an introduction to explain the background of the topic of this paper, research methods, research contents and significance. The second chapter summarizes the ICCF product costing process based on relevant theory and alternate knowledge. The third chapter analyzes the Merchants Bank Shenyang Branch of the product costing process existing problems, Chapter IV of Chapter III to undertake a process of transformation of necessity, through activity-based costing method workflow processes and integration costs (ICCF) comparative analysis, two kinds of selection and costing process has been constructed, the fifth chapter of real data on the use of ICCF conducted studies to prove its superiority. Chapter VI analyzes the ICCF Shenyang Branch of China Merchants Bank in product costing application environments.

Related Dissertations

  1. An Application Research on Activity-based Costing in Construction Company,F285
  2. Shenyang Branch , China Merchants Bank Personal Banking Strategies,F832.2
  3. Construction and application of a new foreign language training center,H319
  4. Material Characteristics and Its Construction of Porous Asphalt Pavement,U414
  5. On the Improvement of the professional education of medical law,D922.16-4
  6. Yunnan Province, city construction and management information system,TP311.52
  7. Radiation barite concrete mix design and its properties,TU528
  8. Research on Construction and Application of Evaluation Indicators System of Chinese Local Government Public Trust,D625
  9. Medical Research Laboratory Performance Evaluation System Construction and Application,R197.324
  10. \,G434
  11. On Change of Circumstances applicable in the Construction Contract,D923.6
  12. Research on Relief System of Civil Ruling,D925.1
  13. Jilin Electric Power Company's senior managers and application of the Quality Model,F426.61
  14. The Study of Application and Development of Information Resource Centers in Rural Area of Gansu,G40-057
  15. Analysis on the Effect of PLZ45-155mm SP Gun-howitzer System and Research on the Digital Operations,TJ412.3
  16. Study on Construction and Application of Automatic System in ShangHai Water Gate and Pumping Station,TV675
  17. Information construction in rural primary and secondary schools in Beijing and Application Analysis,G434
  18. System of changed circumstances applicable Investigation in Construction Contract,D923.6
  19. The Construction Application of Study History Strategy,G633.51
  20. Moral Military Strategies of Model Construction,G641
  21. Construction and Use Research on Incentive Mechanism in SM Consulting Company of Gansu,C932.82

CLC: > Economic > Fiscal, monetary > Finance, banking > Finance, banking theory > Banking > Bank Accounting
© 2012 www.DissertationTopic.Net  Mobile