Dissertation > Excellent graduate degree dissertation topics show
Case Study on Interface Management for Construction Project of Transportation Pivot
Author: WangXuSheng
Tutor: WangXueQing;YangShuHai
School: Tianjin University
Course: Project Management
Keywords: Transport hub Tianjin Railway Station Interface Management Fuzzy Evaluation
CLC: F224
Type: Master's thesis
Year: 2010
Downloads: 63
Quote: 0
Read: Download Dissertation
Abstract
|
The construction of large-scale integrated transport project , has important practical significance to alleviate the contradiction between the big city traffic demand and traffic supply , and interface management is the key to the construction of large-scale integrated transport project . From the interface management of large-scale integrated transportation projects such as start , based on the basic theory of interface management , combined with the Tianjin station traffic engineering characteristics of the project , build the Tianjin Railway Station transportation hub interface management three - tier system . This paper first describes the research background and significance of large-scale integrated traffic engineering , Commentary on the basis of the research status , the main content of this study to build a thesis framework . The program management basic theory, interface management theory and interface management and related theoretical relationship . From the Tianjin Railway Station history, project profiles , project construction constraints analysis and project set features the Tianjin Railway Station project was introduced. According to the Tianjin Railway Station transportation hub interface to identify and interface management system construction principles , building three - tier management system of the Tianjin Railway Station , the project set level interface management , project level interface management and technical aspects of interface management . Based on the principle of of Tianjin station project interface management features and evaluation index system of set , build the Tianjin Railway Station interface management system evaluation index system , based on the weight to determine the index weight , carry out a single factor fuzzy evaluation and comprehensive factors of fuzzy judgment , and the results were analyzed. Finally, the full text of the summary points out the deficiencies of the thesis , and propose a new research direction for future large-scale integrated transport project .
|
Related Dissertations
- Research on Evaluation of Coal Enterprise Energy-Saving Mechanism,F206
- Study of Static and Dynamic Collaborative Optimization on Container Ship Structure,U674.131
- Research on the Organization of Large-scale Integrated Project Management,F284
- Shijiazhuang outdoor sports apparel market and Strategy,F274;F224
- M factory equipment transformation class project evaluation,F224
- Agricultural products processing enterprises in Hunan Core Competence,F326.5
- Hebei Entrepreneurship Environmental Assessment,F279.27
- Based on CBR, TOC and TRIZ green design model,TB472
- Rough set based on fuzzy logic washing machine Application of Fuzzy Control System,TP273.4
- Heilongjiang Oriental Faculty Management System Design and Implementation,TP311.52
- Research and development of Sichuan Vocational and Technical College Employment Assessment Information System,TP311.52
- Zoning Study of Highway Slop Stability in Hunan Province Based on Fuzzy Theory,U416.14
- Research on Transfer Efficiency of Urban Comprehensive Passenger Transport Hub,U115
- Study on the Evaluation Index System and Evaluation Method of Kun-Chu Highway Landscape,U418.9
- Research on Benefit Plan of Tianjin Integrated Transport Hub Project,F512.7
- AHP and Fuzzy Comprehensive Methods in Railway Landscape Evaluation,U212
- Students Online Shopping Customer Satisfaction Measurement,F724.6;F224
- Research on Indicator System of Risk Early-warning in ITO,F270.7
- Level Analysis and Comprehensive Evaluation of the Enterprises Reconfigurable Competitiveness,F224
- Integrated Evaluation of Urban Air Pollution and Module Building,X823
- Study of the Selecting of Indicators in Regional Water Environmental Planning,X321
CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net Mobile
|