Dissertation > Excellent graduate degree dissertation topics show

Study on the Application of Prestressed Anchorge Sheet Pile Retaining Wall

Author: WanJunLi
Tutor: ZhangYuFang;LiGuoLiang
School: Academy of Railway Sciences
Course: Geotechnical Engineering
Keywords: Prestressed anchor rope pile and wall Beam on elastic foundation Finite Difference Method Prototype testing
CLC: U213.15
Type: Master's thesis
Year: 2007
Downloads: 183
Quote: 6
Read: Download Dissertation

Abstract


Prestressed anchor pile and wall is a new type of light retaining structures. In recent years, has been widely used in slope reinforcement works in the construction of roads, railways, water conservancy, with the rapid development of highway, railway, the structure used for embankment the hard shoulders retaining structural engineering application is quite extensive. Not yet a mature design calculation method, there is no clear even in the relevant manuals. From applied research using theoretical analysis and numerical calculation, prototype testing, and a variety of methods to study the anchor rope pile and wall design calculation methods, this study has important practical significance and theoretical value. Pile and wall applications combined with the study of the subject of the Mountain retaining structures and Prestressed Anchor practice, the following conclusions can be drawn: ① considering the construction conditions of dynamic design calculation method is reasonable calculation method, their condition can divided into filling conditions (denoted by A condition), anchor rope condition (denoted by B conditions). ② proposed model based on Winkler elastic foundation beam theory assumes that the finite difference method, can be calculated in layered soils, variable cross-section pile, pile set multidetector Anchor pile of internal force of circumstances. The preparation of the corresponding computer program, compared with the initial parameter method and trigonometric series, the prestressed anchor cable pile and wall design calculations are more reasonable, convenient, flexible, easy to promote the application. ③ According to the results of field testing, pile set anchor rope, anchor rope to play limit pile displacement and adjust the effect of bending moment distribution, it set the location and timing of cable tensioning Tension size of the pile and anchor related. (4) based on the field test results, pile set anchor cable to change the original earth pressure distribution and size, based on the measured bending moment and displacement by inversion analysis method to analyze the different conditions of soil pressure distribution pattern and size with the measured soil pressure The comparative analysis of the physical and mechanical model under different working conditions Prestressed Anchor Pile Wall. ⑤ summarizes the steps of pile and wall design and construction process, filling part of Anchor Construction by filling Anchor Construction sequence can be divided into three types: filling anchor, first combined fill and fill in anchor anchor . ⑥ analyzed and summarized Prestressed Anchor Pile Wall failure mode can be divided into four failure modes: the anchor and pile joints destruction, destruction of the anchor cable body pile damage and overall damage. Reference conclusions, further guidance on engineering practice through the pile internal forces and earth pressure distribution law of the the prestressed anchor pile and wall design calculation methods and the conditions for the design and construction.

Related Dissertations

  1. Study on Process Method and Parameter Optimization of the Remained-heat Treatment of Marine Heavy Forgings,TG316
  2. Varying analysis considering shear lag effects of variable cross-section PC cantilever box girder,U448.213
  3. Analysis and Solving of Modes in Bragg Fiber,TN253
  4. Asymptotic and Numerical Analysis for Two Types of Singularly Perturbed Differential Equations Initial-Boundary Value Problems,O175.8
  5. Numerical Study of HOPF Bifurcation and Dissipativity of Delay Differential Equations,O241.81
  6. The Hole Repairing in Surface Based on Partial Differential Equations,O186.11
  7. Numerical Simulation of Electro-Mechanical Coupling Field for Water-Inrush in Working Face,TD745
  8. Study on the Calculation of Shotcrete and Rock Bolt Support Lattice Beam and Analysis on Three-Dimensional Finite Element,TU476
  9. Low-speed gas film face seal dynamics,TB42
  10. Numerical Identifications of Parameters in Heat Conduction Inverse Problem,O551.3
  11. Theoretical Studies on the Electronic Properties in Semiconductor Quantum Dots,O471.1
  12. Deflection and Force Analsis of Rails of Electromagnetic Railgun When Launch,O343.3
  13. Multigrid Methods for Elliptic Partial Differential Equations with Discontinuous Coefficients,O241.82
  14. Empirical Research on Pricing of Convertible Bonds in China Based on LYON Model,F832.51
  15. The Internal Force Calculations Research of the Joist for Frame-Supported Multi-Ribbed Composite Wall Structure under Vertical Load,TU399
  16. Analysis of Working Mechanisms of the Double Direction Reinforced Composite Foundation,TU473.1
  17. Study the Subsection Excavation Character of the Underground Caverns in GUAN-DI Hydropower Station,TV554
  18. Study on the Application of Overall Cast-in-situ Prestressed Anchorge Sheet Pile Retaining Wall,U417.1
  19. Design of a Novel Doubly Salient Permanent Magnet Machine for Wind Power Generation,TM315
  20. Research on Water Pressure Distribution Law Behind the Drainaged Segment Lining in High Water Pressure Railway Tunnel,U451.4
  21. Analysis of Long-Term Test of High-Speed Railway Ballastless Embankment and Transition,U213.1

CLC: > Transportation > Rail transport > Railway Line Project > Line constructed > Subgrade > Subgrade reinforcement and protection
© 2012 www.DissertationTopic.Net  Mobile