Abstract
|
With China's economy growing take-off , the national product is growing demand for electric energy , brought rapid development of a series of large - scale power engineering construction . Power engineering construction projects obviously huge capital-intensive investment , development and construction of a long cycle , and the construction of many participants , the impact of the construction of the complex uncertainties , which determines the power during construction of a huge potential risk . How to deal with the uncertainties in the construction process , to minimize the risk of the project , to enable enterprises to get the most profit , which has become the main problem faced by the Electric Power Construction Enterprises . In this context , we pull officer 750KV transmission line project , for example , to study the issues of risk management in the analysis of power transmission construction projects . This article in accordance with the risk management process , risk identification - Risk Assessment - Risk Strategies \On the basis of the analysis summarized the research literature , this paper first elaborated the theory of the project and project risk management , and integrated project worked out the characteristics of the project risk management process to identify the risk factors of the project . On this basis , the risk indicators using analytic hierarchy process empowerment, and then use the fuzzy comprehensive evaluation method to carry out a comprehensive assessment of the overall risk profile of the project , not only the risk factors are sorted according to the strength of the degree , and in accordance with the results of the evaluation of the project the risks stealth proposed preventive measures in order to ensure the smooth progress of the project . The dissertation rich transmission project risk management theory , positive guidance and reference for the smooth construction of other similar construction projects .
|
Related Dissertations
- Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
- The Study on Risk Evaluation of BOT Projects in China University,G647
- The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
- Comprehensive Quality Assessment of College Students,G645.5
- Open pit production accidents studied because of the risk management measures,TD771
- Research on the Evaluation of Straw Resource and the Development of Scale-Up Straw Energy Utilization in Jiangsu Province,S38
- A Comprehensive Evaluation of Heritage Trees,S788
- A Study of Investment Opportunity of Boron Mud Comprehensive Utilization Project of LNGF Co., Ltd.,F426.72
- Studies on Urban Characteristic Culture and Construction of Urban Landscape,S731.2
- An Exploration of the Performance Assessment of the College Counselor,G641
- Comprehensive Evaluation of Safety Production and Optimization of Safety for Yangcheng Coal Mine,X936
- The Competition Management System of Harbin 24th Winter Universiade 2009’s Risk Management,G812.2
- On the Program for Evaluating and Cultivating the Core Competitiveness of GY University Press,G239.22
- Study on the Evaluation Method of Flue-cured Tobacco Sensory Characters,S572
- The Innovative Study Based on the Equity Financing of Forest Management from the View of Sustainable Development,F326.2
- Social insurance agencies risk prevention research,F842.6
- Offshore oil platform construction phase Operational Risk Management Research,F426.22
- Chemical Industrial Park Environmental Risk Management Technology Source,X327
- A Construction Project Owner Risk Management Research,F284
- Research on Construction Project Schedule Planning Based on Uncertain Factors,TU722
- Evaluation and Optimization of Comprehensive Disaster-Prevention System in Lianshan, Huludao,TU984.116
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|