Dissertation > Excellent graduate degree dissertation topics show

Numerical Analysis of Deformation and Stability of Hydropower House on Deep Overburden

Author: WangLong
Tutor: MaZhenYue
School: Dalian University of Technology
Course: Water Resources and Hydropower Engineering
Keywords: Deep Overburden Hydropower House Unloading and Reloading Modulus Mohr-Coulomb Equivalent Area Circle Yield Criterion Settlement Control Seismic ResponseAnslysis
CLC: TV731
Type: Master's thesis
Year: 2013
Downloads: 25
Quote: 0
Read: Download Dissertation

Abstract


In recent years, the main places of construction of hydropower engineering have been moved to Qinghai-Tibetan Plateau, where has abundant hydro energy but complicated geology condition. The effect of deep overburden must be considered if hydropower engineering want to be built. So, problems have been paid great attention. In previous research, there are earth-rock dams and sluices, but not hydropower house, on deep overburden. Combined with three kinds of constitutive models, the paper studied foundation treatment methods of a hydropower house on soft soil foundation and static and dynamic properties of the house under different foundation treatment methods by FEM. Examined, contrasted and analyzed the displacement response of hydropower house under different foundation treatment methods. The detailed work is as follows:(1) In static analysis, unloading and reloading modulus of Duncan-Chang constitutive model and Mohr-Coulomb equivalent area circle yield criterion are used as the constitutive model of foundation. The paper gives the method to calculate these foregoing parameters and suggests a new way to calculate structural deformation on deep overburden. Simulate friction contact problem between piles and soil with surface contact element. By comparing and analyzing the result under different foundation treatment methods, the paper suggests that installing friction piles under the whole bottom of the hydropower house and proceeding consolidation grouting in larger range could control part of settlement and springback by retaining water.(2) Calculate seismic response of hydropower house and foundation with/by modal analysis response spectral method, using the model of installing friction piles under the whole bottom of the hydropower house and proceeding consolidation grouting. Evaluate seismic resistance, bearing pressure on foundation and deformation behavior of structure.(3) Calculate and analyze seismic response of hydropower house under different foundation treatment methods to get dynamic displacement along river flow direction and vertical. Compare and analyze seismic resistance of hydropower house under different foundation treatment methods. The result indicates that installing more friction piles and proceeding consolidation grouting in larger range could decrease seismic response of hydropower house significantly. According to the advances, it helps to improve construction control quality and design accuracy of hydropower house on deep overburden, which is meaningful to guarantee safety and optimization design.

Related Dissertations

  1. Computation and Analysis of Stress and Strain on Ertanggou Asphalt Concrete Core-wall Rockfill Dam on Deep Overburden,TV641.41
  2. Deep Overburden Foundation CFRD dynamic finite element analysis of stress and deformation,TV315
  3. Numerical Analysis for Anti-Seepage and Drainage Facilities Influence Seepage Flow Field in Deep Overburden Foundation,TV223.4
  4. Rock Stabilization Analysis of Underground Hydropower House Based on Rheology Effects,TV223.1
  5. Using Post-grouting Reinforcement Technique to Control the Settlement at the Back of Bridge in Dian-lin Expressway,U416.1
  6. Penetrate deep overburden characteristics of three-dimensional analysis of dam,TV223.4
  7. Research on Static and Dynamic Behaviors of Concrete Face Rockfill Dam on Deep Overburden Layer and Earthquake Liquefaction of Dam Foundation,TV223
  8. Research on Composite Structural Analysis and Dynamic Identification of Hydropower House,TV731
  9. Nonlinear Coupling Research of Seepage-Stress Field in the Thick Overburden Layer of Dam Base,TV223.4
  10. EPB shield control of ground settlement construction,U455
  11. Research on Construction Technology of Controlling Ground Settlement in Single-Arch and Large-Span Subway Tunnel,U455.4
  12. Simulation and Visual Study on the Process of Hydropower House Concrete Construction,TV512
  13. Engineering Geology Study of the Batang Hydropower Station for Selection of Dam Site,TV221.2
  14. The Dynamic Aanalysis of Underground Hydropower Station and Modal Identification,TV312
  15. Application of the Technology of Combined with Cut-off Wall and Curtain in Deep Overburden Layer,TV543
  16. Study of Surface Subsidence Control by Wuhan Urban Subway Shallow Tunneling Method Tunnel Construction,U455.4
  17. Research on the Office Development Project with the Whole Life Cycle of Cost Management,F293.3
  18. Study on Adjacent Building Settlement Control to Overall Process of Foundation Excavation Construction,TU753
  19. Regulations and Control Measures of Pile Foundation Near Subway Station by Excavation for Shallow Tunnels,U231.3
  20. Study on Settlement Control of Embankment and Soft Foundation of High-Speed Railway in Red Rock Area,U213.11
  21. Differential Settlement Control Criterion of Bridge-Approach and People-Vehicle-Road Interaction,U445.71

CLC: > Industrial Technology > Hydraulic Engineering > Hydropower utilization of hydropower project > Hydropower station construction and equipment > Hydropower plant
© 2012 www.DissertationTopic.Net  Mobile