Study on Simplified Calculation Methods for Multi-dependency Network

Author: ZhouMeng
Tutor: DuZhiDa
School: Dalian University of Technology
Course: Civil Engineering Management
Keywords: Multi-dependency Network Time Differences Dummy Time DifferenceActivity Scheduling Process
CLC: TU721.3
Type: Master's thesis
Year: 2012
Downloads: 27
Quote: 0
Read: Download Dissertation

Abstract


Network planning technique is always playing an important role in the field of construction engineering. With the projects people facing becoming more and more difficult, the network planning technique has also in unceasingly the evolvement and the improvement. Particularly, dealing with different types of network is convenient with the improvement of computer technology for people. In multi-dependency network, the types of relationship between the front closely activity and the back closely activity were not only finish-to-start relationship with0time difference, but developed finish-to-start relationship with0or more time difference, finish-to-finish, start-to-start, start-to-finish, and mixed logic relationships. The scheduling process for multi-dependency network was similar to that for traditional network. But it had specialness because of time difference.The time differences contain the minimum time difference and the maximum time difference. The minimum time difference means the scheduled time difference between the activity and the back closely activity can not be less than the planned time difference. The maximum time difference means the scheduled time difference between the activity and the front closely activity can not be more than the planned time difference. In real projects, there were many concurrent activities with maximum time differences.This paper introduced the scheduling process and the check rules for multi-dependency network with maximum time difference with examples illustrating. We changed the original network structure by increasing activity amount. We converted multi-dependency network into the traditional network with introducing a new concept—the dummy time difference activity. And then we calculated the time parameters by the equations of schedule calculations for the traditional network and the check rules for the maximum time differences. We found that the time parameters and the critical path was the same as the results by the equations of schedule calculations for the traditional network. In view of this, we can write computer programs to identify the critical path through the network for PERT analysis with this new approach, because it will cost less time for reducing the judgment process of logic relationships, and make a strategic decision for greater efficiency. This simplified method enriched the AON multi-dependency network.

Related Dissertations

  1. The Porting and Testing of the Embeded Operating System μCOS,TP316
  2. Differences in Informal Time in Intercultural Communication-A Comparative Study between China and United States,H0-05
  3. Research of Key Technologies of Project Planning and Scheduling for Aerospace Model Engineering Project,V468
  4. Cultural Differences in Time Perspective between China and the United States,G05
  5. The mixed enterprise production planning system research and development in the CIMS environment,F273
  6. Research on Load Balancing Technology in Cluster System,TP338
  7. Blower Factory Siping dynamic production planning management method,F426.4
  8. Research on Flexible Scheduling under Multi-process Routes Based on Genetic Algorithm,TP18
  9. Based on Cournot equilibrium pricing strategies of cloud resources,F426.6
  10. Research and Application of Key Technologies of Manufacturing Execution System for Tire Enterprises,TQ336.1
  11. Study and Application of Distributed Steelmaking-Casting Process Monitoring and Product Aided Scheduling System,TF345
  12. Mobile robot indoor ultrasonic positioning system,TP242
  13. Research of Enable Technologies and Applications in Agile Manufacturing,TH164
  14. Planning and Scheduling Optimization of Job-shop in Intelligent Manufacturing System,TH166
  15. Research on Modeling Methodology and Optimization Theory for Logistics Operation System of Container Terminal,F252;U695.22
  16. Research of Method of Fault Diagnosis of Power Network,TM711
  17. Research on the Key Technologies of Non-cooperative Location for CDMA2000 Mobile Station,TN929.533
  18. The process of industrial production management system,TP319
  19. Study on Modern Construction Project Organization Coordinated Management Mode,TU721
  20. Network planning technology projects in the DCS optimal allocation of resources in applied research,TU721.3
  21. The Research on Project Completion Probability Characteristic of PERT,TU721.3

CLC: > Industrial Technology > Building Science > Construction > Construction organizations and programs > Construction organization > Construction Organization Method
© 2012 www.DissertationTopic.Net  Mobile