Dissertation > Excellent graduate degree dissertation topics show

Research on the Supervising Tendering Mode of Framework for Wind Power Generation Project of China Huadian Corporation

Author: ZhangXun
Tutor: ZhaoZhenYu
School: North China Electric Power University
Course: Business Administration
Keywords: Wind power generation Construction project Supervising Purchasingmode on framework
CLC: F426
Type: Master's thesis
Year: 2012
Downloads: 114
Quote: 1
Read: Download Dissertation

Abstract


To carry out the national policy about energy-saving and emission-reduction, China Huadian Corporation has been developing the wind power generation projects in a great extent year after year and the new installed capacity increased by1104MW in2011. To make wind power project approved smoothly, China Huadian Corporation generally controls the scale of the50MW in each phase, and implements for multi-phase expansion in the same wind farm. Tendering, which can form adequate competition and reduce the cost of supervision, has been used in all wind power projects. But the traditional supervising tendering mode has many defects and does not fit in with the needs of wind power construction projects of China Huadian Corporation. So a new kind of mode for supervising tendering needs to be worked out urgently to realize the innovation of theory and use it in actual projects to solve the practical problems.This paper firstly use documentary method, system analysis method and the means of quantitative and qualitative methods to analysis the bidding datum of50MW wind power supervision projects of China Huadian corporation from2007to2011. The study revealed the defects of traditional bidding model, for example, the costs of both parts are too high in this mode and repeatedly bidding activities take up so much time. This mode doesn’t make provisions to human components of the supervision organization on campus, the number of people of all positions, unit price per month and the service period, which lead to large deviation in all respects, that brings about difficulties to the tender evaluation, bidding, project implementation and contract settlement. This mode can not change the minimum price limit of1.2million yuan for50MW wind power project supervision fees settled by Supervision Committee of China Electric Power Construction Association and can not break the monopoly. Secondly, by using research methods, such as system analysis method, expert investigation (Delphi) and subjective weighting method, and with the help of management devices of WBS work breakdown structure, Responsibility Assignment Matrix and Gantt chart, this paper studies and configures the kinds, number, service period and unit price per month for all positions of supervision organization on campus based on new50WM wind power supervision projects of China Huadian Corporation, and build benchmark price model for wind power supervision projects. On the basis, for the different scales of new projects and expansion projects, the different levels of complexity of projects in the hills, mountains, deserts, the Gobi region and the different pros and cons of the supervision implementation, I work out scale adjustment factor for new projects, expansion projects adjustment factor, project complexity adjustment factor, reward and punishment adjustment factor. A general contract model for wind power supervision project is established, which has universal applicability. These two models constitute the Supervision Tendering Mode of Framework for wind power generation projects of China Huadian Corporation, which can effectively make up the deficiencies of the traditional supervision tender mode.At last, according to the study, this paper designs the2012annual tender scheme of wind power projects supervision framework for Huadian New Energy Development Co., Ltd and organizes its implementation. The tender scheme of framework achieves good results, realizes the goal of supervision tender framework that one tender is annual effective to all wind power generation projects of this company, and breakes the market monopoly of Supervision Committee of China Electric Power Construction Association, effectively reducing the tender cost of both sides and saving the time of tender.

Related Dissertations

  1. Heilongjiang Unicom WCDMA network project schedule management research,F626
  2. Our Country Meat Product Quality Safety Control System Research,F426.82
  3. Ji’nan Unicom Telecommunication Engineering Project Management of Human Resources,F626
  4. Study on the Control of Wind Turbine with Grid-Connected,TM614
  5. Guangdong Communications Enterprises Infrastructure Project Management,F626
  6. Influences of Wind Power Integration on Power System and Low Voltage Ride-Through Control of Wind Power Generation System with DFIG,TM712
  7. Tracking audit of Henan Vocational and Technical College new campus construction project,F239.63
  8. Study on Control Scheme for Micro-Grid Bi-mode Operation,TM711
  9. Whole Hull’s Structural Strength Analysis of Offshore Wind Turbine Installation Vessel,U661.43
  10. The Research of Bidding for Construction Project Supervision System in Our Country,F284
  11. PTZ Research Based on Intelligent Surveillance Technology,TP391.41
  12. Organizational commitment , organizational citizenship behavior and team performance relationship,F224
  13. A Study on Multi-objective Optimization of Construction Project Based on Genetic Immune PSO,TP301.6
  14. Research on Several Control Problems for Doubly-Fed Variable-Speed Constant-Frequency Wind Power Systems,TM614
  15. Effect-Assessment for Occupational Hazard Control in Construction Project of a Coal Mine,R13
  16. Research on the Procedure for Hastening Debt Recovery,D925.1
  17. The Research on Project Team Construction of Drama Productions in Beijing Vocational College of Electronic Science and Technology,J824
  18. The Research on the Construction of Lean Project Culture,F270
  19. Research on Information Disclosure Legal System for China State-owned Enterprises,D922.29
  20. Research on Legal Regulation of Folk Credit in China,D922.28;F832.4
  21. Feasibility Analysis of Jinan Public Rental Housing Construction Project Financing,F293.3

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy