Dissertation > Excellent graduate degree dissertation topics show

The Study on Project Quality Control of Steel Structure Manufacture and Installation in YT-WS

Author: YuQingDong
Tutor: TianBo
School: Jilin University
Course: Business Administration
Keywords: Steel Structure Manufacture and Installation Project Quality Quality Control
CLC: TU712.3
Type: Master's thesis
Year: 2011
Downloads: 76
Quote: 0
Read: Download Dissertation

Abstract


Steel structure has been used in construction widely. The development level of steel structure also became one of the important indexes which measure the economic development level of a country. Compared with developed countries, the development level of China’s steel structure building is quite limited. Facing the fierce competition at home and abroad, the quality is the key to success in the competition. Only by constantly improving the level of quality control, the enterprise can maintain the superiority in the competition. Therefore, the enterprise must design the quality control scheme which adapt to the competition, to continuously shorten the gap between quality control with domestic and international enterprises. This article uses theories into practical project by studying the Project Quality Control of Steel Structure Manufacture Installation in YT-WS. A comprehensive analysis of the Project Quality Control of Steel Structure Manufacture Installation through HYstemic, in-depth research and to put forward improvement of the Project Quality Control of Steel Structure Manufacture Installation in YT-WS have important practical significance to guarantee the steel structure engineering quality, and improve project management level.This paper took the YT-WS steel structure fabrication engineering for example, analyzed the problems and the present situation of quality management of the YT-WS steel structure fabrication engineering. Via describing the job details, introducing the present situation of quality management, this paper proposed some problems about the organization structure of steel structure project, the process of quality management, the method of quality management. About the organization structure of steel structure project, the company always uses the functional organization structure. The members of the project only take charge the jobs belong to the mselves, consider the effectiveness of themselves. Project manager haven’t absolute right. The organization structure will make team member lax and conflicting, and lead to project termination, or progress extending, costs increasing and effectiveness reduction. Besides, the operating personnel have low awareness about quality, or work with bad health or mentality generally, and this would lead to safety quality potential. About the process of quality management, there always exist some problems, such as not being prepared and not strict acceptance. They always not prepare for the material and equipment facility well, and this lead to the accident. And they also can’t collect the history documents about product inspection, can’t judge the quality of project, then began the next job. About the method of quality management, because of relaxed quality audit and the supervising officer lacking of qualifications, they can’t judge if the material, technology and process rational, and leave the safety potential.To design the improvement Quality Control plan of Steel Structure Manufacture Installation in YT-WS on the basis of analyzing problems. From project organization improvement scheme, project quality control process improvement and project quality control method 3 aspects to improve the Project Quality Control of Steel Structure Manufacture Installation in YT-WS. The design of project organization improvement scheme mainly takes the organizational structure of the matrix type, and clearly department’s responsibility and authority. Project quality control process improvement scheme designs from project make stage and the installation phase to project quality control process improvement scheme. The quality control process improvement scheme of project make stage designs from technical disclosure organization, steel structure production process procedure, coating component quality inspection three aspects design. The quality control process improvement scheme of project installation phase designs from construction preparation, construction process quality control and completion acceptance. Improvement scheme of project quality control method designs from preparation and review related technical documents and reports, process inspection and final inspection.To ensure the YT-WS steel construction quality control HYstem security improvement program can be effectively implemented, the paper also presents the implementation of safeguard measures to improve the program from four aspects, the leader takes seriously with full participation, building steel structure engineering quality controls security HYstem, improving the quality control of steel structure construction evaluation standards and continuous improvement. Leadership attention is the prerequisite of quality control, personnel is the executor of YT-WS steel structure engineering quality control improvement scheme, only the participation of all staff to ensure the smooth implementation of the improvement plan; quality control assurance HYstem is the guarantee of quality control scheme to improve the effective operation of quality control HYstem, quality assurance HYstem can control the activities of project implementation monitoring, though real-time monitoring and supervision departments can implement quality control improvement program, finding the quality control problems in the implementation process and developing solutions; project quality control assessment criteria for quality control capability evaluation and improvement, using a combination of qualitative and quantitative methods for the quality control of project implementation to make a comprehensive, objective, reasonable evaluation.This article from the steel structure engineering characteristic and the theory of project management on the YT-WS HYstem of the steel structure project quality control scheme design, improving the company quality control for steel structure engineering, for future of steel structure projects for reference, improving the company’s competitive advantage in the industry.

Related Dissertations

  1. Analysis on Unloading of Large Span Steel Structures and Research on Its Mechanical Analysis,TU391
  2. Research of Photovoltaic Steel Structure Integrated System and Embedded ModularPV Module’s Research & Design and Application,TU18
  3. Research and Development of Reusable Formwork System of Concrete Floor of High-Rise Steel Structures,TU398.9
  4. Theoretical and Experimental Investigations of Energy-saving Sandwich Composite Panels Used in Steel Residential House,TU391
  5. STEEL FRAMES extended end plate connections and the overall performance of second-order elastic-plastic analysis,TU391
  6. Research on Mechanics Performance of Staggered Truss Structure under Low Reversed Cyclic Loading,TU391
  7. Staggered truss steel and wood structure and properties of hybrid structures of multi-storey residential,TU398.9
  8. Test Research and Finite Element Analysis of Integral Stability for Steel Specially Shaped Beam,TU391
  9. The Static Property Research of Non-overlapping Spatial KK-joints with Vertical Bars,TU392.3
  10. Seismic Response Analysis on Spatial Steel Structure System of 4000m~3 Blast Furnace,TU352.11
  11. Coated Steel Corrosion Characteristics and Deterioration of Mechanical Properties of Materials,TG174.1
  12. Research on Properties for Steel Frame under Impact Loading,TU392
  13. Project Business Proposal of 100,000 Ton/Per Year Output Construction Steel Structure Industrialization,F426.92
  14. Seismic Optimized Design of No-supporting Steel Frame Structure’s Discrete Variables Based on 《Code for Seismic Design of Buildings 》,TU391
  15. Structure Design and Calculation of the Overall for First High-rise Steel Structure Apartment in Shanxi Province,TU391
  16. Static Performance on the Design Method of Cellular Steel Frame Beam-Column Joints,TU391
  17. Studies on the P-Δ Effect of the Vertical Loads on High-rise Steel Structures,TU391
  18. Research on Oxidation Behavior of Carbon Steel at Simulated Reheating and Hot-rolled Process,TG335.11
  19. Small high-rise steel residential dual lateral force resisting system of seismic performance of,TU391
  20. Steel Structure Analysis of Three-dimentional Warehouse Shelf by Using the FEA Method,TU391
  21. Multi- dimensional high-rise steel garage performance analysis and component standardization,TU391

CLC: > Industrial Technology > Building Science > Construction > Construction Management > Technology Management > Quality check
© 2012 www.DissertationTopic.Net  Mobile