Dissertation > Excellent graduate degree dissertation topics show

The national e-government extranet (a phase of the project post evaluation study)

Author: ZhouMingXia
Tutor: WangChangFeng
School: Beijing University of Posts and Telecommunications
Course: Project Management
Keywords: National Electronic Government Network The First phase Post-project evaluation
CLC: D630.1
Type: Master's thesis
Year: 2012
Downloads: 48
Quote: 0
Read: Download Dissertation

Abstract


The First phase of National Electronic Government Network (hereinafter referred to as the Chief extranet) as a critical infrastructure for e-government construction in China, is a typical project of e-government construction in China. The actual effectiveness of its construction projects, experiences and lessons learned, an important reference for other similar projects. The project started construction in August2005, the country of final acceptance by the end of2009, dating back more than two years. At present, the government extranet has been initially achieved economic efficiency and produce a certain amount of social impact. It is necessary to select the appropriate point for project management experience to determine the project objectives, the degree of realization of the purpose, effect, effective, thereby enhancing the level of project management in the future, the protection of the overall project goals.In this study, combined with the project, evaluation of learning and accumulation of knowledge and use project evaluation methods and tools, set up after the evaluation of indicators and indicator system. Government extranet construction of the entire process of analysis and evaluation, comparison and research, identify gaps and reasons for, and lessons learned, and put forward corresponding countermeasures and suggestions.This article in five chapters. The first chapter is an introduction, the basic situation of this study; The second chapter describes the post evaluation theory; the third chapter of the project actually built after the evaluation index system; Chapter IV of the project in accordance with the index system after evaluationresearch; Chapter formed according to the post-evaluation findings, conclusions, and gives the research proposals.

Related Dissertations

  1. Banana Yoshimoto healing work changes,I313
  2. The Change and Influencing Factors of α-cells and β-cell First-phase Secretion Function in Newly Diagnosed Diabetic Patients,R587.1
  3. Type 2 diabetes adiponectin levels and islet β -cell function and mechanism of the relationship,R587.1
  4. The Relationship Between Visceral Fat、the First Phase Glucose Stimulated Insulin Secretion and Expression of G-protein Coupled Receptor 40 in Beta Cells in Rats,R587.1
  5. The Effect of Oxidative Stress on the Pancreatic β-Cell Function and It’s Mechanism in Type 2 Diabetes Mellitus Patiens,R587.1
  6. The Investigation on the Relationship between AngiotensinⅡ and Adiponectin, Pancreatic Islet Beta-Cell Secretion Function in Type 2 Diabetes Mellitus Patients,R587.1
  7. The Effect of Insulin Receptor Interfering with siRNA in βTC-3 Cells on Glucose Induced First Phase Insulin Secretion,R587.1
  8. Analysis the Employment Impact of Defence Expenditure,E0-054
  9. Research for Urban Design and Design Control of Central Business District in the First District of Suzhou Industrial Park,TU984.13
  10. The Clinical Observation of Variable Length Continuous Subcutaneous Insulin Infusion Treatment for Newly Diagnosed Type 2 Diabetic Patients,R587.1
  11. Study on the Relation of Various Indexes for Evaluating Insulin Secretion and Hyperglycemic Clamp Technique,R587.1
  12. Investigate the Change of the First-phase Insulin Secretion in the First-degree Relatives with Normal Glucose Tolerance of Chinese Type 2 Diabetes Mellitus,R587.2
  13. The Study on the Wenli on the First-Period of Inscriptions on Bones or Tortoise Shells in Yinxu,K877.1
  14. Change of Islets Function in the Rat Model of Catch-up Growth after Food Restriction and the Histone Modification of Pdx-1 Promoter,R587.1
  15. Ecological Environment Risk Assessment and Aversion of Operation of Western Route of South to North Water Transfer Project,TV68
  16. The Post Evaluation of Land Consolidation Project in Rural,F224
  17. Evaluation of the Overhaul Effect of Unit 4 in Ninghai Power Plant Based on AHP-Fuzzy Method,F426.61
  18. Study on Whole Processes Cost Control of Construction Project,F224
  19. Transportation construction project evaluation,F512
  20. Honghe Prefecture Jinping Hydropower Station project assessment study,F426.61
  21. The Study on Post-Evaluation of Water Conservancy Construction Project,F426.91

CLC: > Political, legal > China's political > State administration > State organs and personnel management > State organs
© 2012 www.DissertationTopic.Net  Mobile