Dissertation > Excellent graduate degree dissertation topics show

The Non-financial Performance Measurement Research for China Government Construction Management Organization Based on the Critical Success Factors

Author: LiuHong
Tutor: LiangJianChun
School: Chongqing University
Course: Applied Psychology
Keywords: China Government Construction Management Organization PerformanceMeasurement Critical Success Factors Non-financial Indicators
CLC: F284
Type: Master's thesis
Year: 2012
Downloads: 21
Quote: 0
Read: Download Dissertation

Abstract


The China government construction management organization refers to variouslevels of China government construction management organization and agencies fromthe central to local, which ministry of housing and urban-rural development of the PRC;department of housing and urban-rural development in provinces, municipalitiesdirectly under the central government and autonomous regions; bureau or committee ofhousing and urban-rural development of local government from the angle ofadministrative levels. With the transition and perfection of the function of thegovernment organizations, the measurement of the performance is playing a more andmore important role in improving the management level of the organization. However,through the study and analysis of the measurement of the performance for the presentsituation in China, it is found that although the China government constructionManagement Organization has introduced the measurement of the performance, therestill exist many problems. The main manifestations are: indicators setting mainly basedon ethics, ability, industry, effect and honest, lacking of indicators of critical successfactors based on organization. Financial indicators take larger share of performancemeasurement; non-financial indicators take relatively smaller proportion of performancemeasurement. Performance measurement mainly focuses on qualitative evaluation,lacking of uniform evaluation standards. The subjects of evaluation lack of diversity,lacking of citizen participation. The assessment results lack of feedback andcommunication.Based on the public organization core competency research of CHONGQINGUniversity, and combined with the consulting of the experts and analyzing of the papers,which complied critical success factors questionnaire of china government constructionmanagement organization. According to practical study and by using AHP, whichcomposed China government construction management organization performancemeasurement index, and based on the china critical success factors of China governmentconstruction management organization, the paper gives the suggestions on how toimprove the china government construction management organization performancemeasurement level.According to practical studies, this paper gives the following conclusions:①Thenon-financial performance measurement index of the china government construction management organization critical success factors including six critical success factorsand twenty four key performance indicators.②The paper has high reliability as it byusing the Cronbach’s a reliable coefficient tested the internal consistency of the paper,the result if which reaches to0.986.③. This paper is suit to factors analysis, as it testedby the KMO and Bartlett’s test of sphericity, the results of KMO reaches0.97.④. Thispaper shows the critical success factors has relation with each other, as it has proved bythe Pearson’s test.

Related Dissertations

  1. SME Management Mechanism for Sustainable Development,F276.3;F224
  2. A Study of Key Success Factors (KSF) for Rural Tourism Development-the Case of Shanxi Area,F592
  3. Value-Based Management (VBM) design of the framework and its application,F272
  4. Business Process Reengineering Survey of Enterprise Logistics Management Information System Construction,F253.9
  5. Influencing factors of ERP End-User Performance and Mechanism of empirical research,F224
  6. Critical Success Factors for Electronic Commerce in Chinese Electronic Information Industry,F224
  7. Non- financial indicators of enterprise performance evaluation,F272
  8. The state-owned enterprise performance evaluation system research,F276.1
  9. DB contracting mode of construction project success factors,F224
  10. Enterprises through the financial crisis discussed the key success factors,F275
  11. X Dairy Company Information Strategic Research,F426.82
  12. Research on Competitive Strategy of Kelon Refrigerator,F279.26
  13. Research on Competitive Strategy of Yingshuo Company Cosmetic Plastic Products,F279.26
  14. A Research of Competition Strategy of Diesel Engine of Weichai Power Co.,Ltd.,F279.26
  15. Beijing PAN Company System R&D Development Strategy Research,F279.26
  16. The Evaluation at the ERP Application in Jinan NO.2 Machine-Tool Works,F279.26
  17. Study of Financial Crisis Prognosticating with Non-financial Index and Data Mining Methods,F275
  18. Study on the Implementation Process of Crm,F274
  19. The Study on Agricultural Enterprise’s Performance Evaluation System,F324
  20. The Chengdu Tianao Limited critical success factors to explore,F279.26
  21. Research and Application of CMM-based software project management,F407.67

CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net  Mobile