Dissertation > Excellent graduate degree dissertation topics show

A Study on the Characteristics of Excavation in Upper Part Shield Tunnel and Security Protection Technology Research

Author: WeiJunJie
Tutor: HuangXingChun
School: Shanghai Jiaotong University
Course: Geotechnical Engineering
Keywords: shield tunnel unloading excavating mode reinforcement measures measurement analysis deformation control
CLC: U455.43
Type: Master's thesis
Year: 2010
Downloads: 103
Quote: 0
Read: Download Dissertation

Abstract


With the modernization of Chinese urbanization process, the gradual expansion of urban space focus on the underground space, and thus gave birth to a large number of underground engineering. Structures of underground space have been built to meet the increasing demand for people’s life and work, at the same time, the follow-up projects have to face inevitable technical difficulties. Problems came out that how to ensure the stability and security of built underground structures, one of which was the unload of the underground structures at the top.In this paper, base on Shanghai Subway Line No.10, Tongji station to GuoQuan road section, underground interchange project. We research on the upper unloading of the shield tunnel, meanwhile, analysis and compare methods of excavation unloading the construction process, reinforcements of the interchange project and other factors, Then we find out how these factors affect on the shield tunnel under-lying, analysis on sensitivity and response, and conduct portfolio analysis. Based on the comparison of different factors, we find some propose appropriate countermeasures to solve engineering challenges, and environmental protection measures to ensure the safety of rapid construction. The main research contents are as follows:(1) Describe the relevant theory and finite element numerical simulation of tunnel construction methods, using non-linear Drucker-Prager soil model, the approximate assumptions used in analog processing, the selection of soil parameters and conversion, and the implement of construction steps.(2) Through the three-dimensional finite element model, analysis the floating volume of built tunnel under different ways excavation. By assess the excavation process in space-time effect on the basement uplift control, choose the best method of qualitative excavation.(3) Establish a two-dimensional finite element model, then simulate the six selected strengthening program, study the tunnel floating control effect, through out the comparison of displacement by different reinforcement methods, consider the actual construction and engineering economic factors, then select the best integrated reinforcement.(4) Analysis the measured data, under the excavation with appropriate protection program, the surface subsidence of construction process, foundation pit vertical displacement, and building vertical displacement, pipeline displacement are all controlled within reasonable limits.

Related Dissertations

  1. 1200 tons automatic autoclaved fly ash brick molding equipment research and design of hydraulic systems,X705
  2. The Construction Monitoring and Deformation Control and Analysis of the Box Culvert Jacking of the YouQuan Road Through the Hukun Railway,U449.5
  3. Analysis on Unloading of Large Span Steel Structures and Research on Its Mechanical Analysis,TU391
  4. The Surrounding Rock Monitoring and Finite Element Simulation of Subway Tunnel,U455.43
  5. The Study on the Openness Dust Control in the Unloading Process of the Freight Train,X701.2
  6. Research on Mechanical Properties and Seepage Characteristics of Outburst Coal under Cyclic Loading and Unloading Confining Pressure,TD713
  7. High-speed unloading bottles stack machine design,TS262.5
  8. 16 inches LNG Cryogenic loading arm development schedule and control,TE978
  9. The Method of the S109FA Unit’s Operation about Deeply Unloading in the Abnormal Working Conditions-Studying the Actual Production Application in the Deeply Unloading Technology,TM621
  10. The Deformation Character Test and Numerical Simulation Research for the Soft Clay in the Unloading Condition,TU447
  11. Experimental Study and Engineering Application of Coupled Seepage and Stress Fields in the Fracture Sandstone,TU452
  12. Reliability Research of Moment Axis on Coal Seam Shear,TD421.6
  13. Dynamic Response Simulation of Induced Caving Roof with Continuous Mining under Mining Unloading,TD311
  14. Research on Full-scale Grid-connected Power Conversion Technology for Direct-driven Wind Generation System Based on Back-to-Back PWM Converter,TM614
  15. 3-D Finite Element Numerical Analysis of Sheet-pile Retaining Structures with Rigid Load-relieving Component,U655.54
  16. Analysis on Heavy Haul Transportation Unloading Organization for DA-Qin Line,U296
  17. Study on Scheme for Storage Yard Layout of Container Node Station,U291.5
  18. The Feasibility Research on Precise Centrifuge of Large Radius,TH824.4
  19. Strength Property Assay of Reconstituted Loess,TU411
  20. Stability of underground engineering based on the energy release rate,TU452
  21. Study on Loading-Unloading in Underpinning and Space Recovery Monitoring of Single-Wall Style Ancient and Modern Architecture,TU746.3

CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Construction methods > Shield Law ( full- face excavation )