Dissertation > Excellent graduate degree dissertation topics show

The Study of Reducing a Company Line Shutdown Time

Author: GeJinMing
Tutor: LuCongDa
School: Zhejiang University of Technology
Course: Mechanical Engineering
Keywords: shutdown time compress shutdown reason assembly line
CLC: TB497
Type: Master's thesis
Year: 2013
Downloads: 2
Quote: 0
Read: Download Dissertation

Abstract


Nowadays, in all kinds of different manufacturing business, from mechanical processing to electronic manufacturing to product packaging, the applications of assembly lines has become more and more common and important. Due to the complexity of the production and logistics system, lines are often affected by various factors and stop. The stop of lines will not only cause productivity losses, but also can cause the backlog of WIP and impediment of logistics operations. Therefore, the research of how to compress the time of line stop has vital significance.The main research and achievements were as follows:1.This article determined five main reasons that caused the stop of assembly lines of a company by classifying and neatening the line stop data of the first three quarters in2010. The five main reasons are machine down, material shortage, quality problem, process problem and warehouse problem. Then the author used the methods like Reliability Centered Maintenance, Optimize Supply Logistics, Total Quality Management, Operations Standardization and Improve Materials Sending System Of Warehouse to compress the time of line stop. As a result, the time of line stop has decreased by30%.2.Based on the analysis, combined with the actual situation, for a specific reason, to develop appropriate line stop time compression schemes. Then, according to the different priorities for improvement, to develop comprehensive programs to stop time compression line, and line stop after implementation to compare the data to determine the effectiveness of the program.3. Respectively, using the "reliability-centered" service, optimize supply logistics, total quality management, standardization and improvement of operating systems and other warehouse sends the material line stop time compression method to compress the line stop time, so stopping line to reduce the average time30%.

Related Dissertations

  1. Database of massive data following,TP311.13
  2. Influence of Braiding Parameters on the Radial Compressive Property of Biodegradable Tubular Scaffold,R318.08
  3. Research of Methods to Upload Large Quantities of Ship Documents in WINDCHILL PDM System,TP391.1
  4. The Multi-Objective Problems in Mixed-model Assembly Lines Sequencing Based on Scatter Search Approach,TH186
  5. Research of Contrast between Plastic Compress Forming and Metal Mould Forging Forming,TQ320.669
  6. Design and Realization of Security Defense System Based on ARM9 and GPRS,TP277
  7. Study on the Foamed Aluminum Produced by Rare-earth Hydride Foaming Agent,TB383.4
  8. The Research and Optimization of Intra-prediction Algorithm in H.264,TN919.81
  9. Design and Implementation of Circuit Multiplication Equipment Based on Communication Network,TN152
  10. The Research on Harbin DA Company’s Assembly Line Balancing,TH186
  11. JPEG images based on adaptive information hiding algorithm,TP309
  12. Research on Improvement in Air Filter Assembly Line Based on Industrial Engineering,TH182
  13. Research and Optimization on Complex Assembly Line Balancing Problem,TH186
  14. Design of Auto-assembly Line on Cleanout for Electromotor Bearings,TH133.3
  15. Research on the Development of the Kernel of the Realtime-Data Platform for SCADA Software,TP311.52
  16. The Research and Development of Branch Processing Technology for Microprocessors,TP368.11
  17. Simulation Research of Radar Signal Processing System and Its Implementation in FPGA,TN957.51
  18. Design and Implementation of Voice Communication Subsystem of Railway Emergency Command System,TN919.8
  19. The Research of Array Acoustic Logging Signal Process Based on the Time-Frequency Signal Analysis,TN911.7
  20. Research and Implementation of Traffic Events Video Monitoring System on Highway Tunnel,TP277
  21. Based on Flexsim of the BSP model assembly line balance,TH163

CLC: > Industrial Technology > General industrial technology > Industrial common technology and equipment > Factory, workshop > Technology Management
© 2012 www.DissertationTopic.Net  Mobile