Supplementary Quota Establishment and Applications of the Inner Mongolia Section of Bayan Naoer-Yinchuan Highway

Author: ZuoQin
Tutor: ZhangShengRui
School: Chang'an University
Course: Traffic and Transportation Engineering
Keywords: Construction quota Supplementary quota Highway Engineering Fixedamplitude Bayanhaote-Yinchuan Expressway
CLC: U415.12
Type: Master's thesis
Year: 2013
Downloads: 4
Quote: 0
Read: Download Dissertation

Abstract


The area of Inner Mongolia lies across the northeast, north, and northwest area, which ischaracterized by cold, drought, complex geological disasters, and short construction season.In highway construction, special technology and special construction environment putforward new requirements to the valuation basis.In order to meet the requirement of the fast development of valuation based ondemands of the autonomous’ region highway construction according to the characteristics ofAlashan area construction environment and the current highway construction technologyand equipment, as well as the science and technology level, the investigation is based on theapplication status of production and management from Inner Mongolia section ofBayanhaote-Yinchuan Expressway. The assay puts forward producers understanding andevaluation of the labor intensity and labor productivity, and is familiar with the price level,relevant technical and economic policies. It also determines the rating level, and materialconsumption quota which reflects the practical production management level of the InnerMongolia Autonomous Region highway engineering. The relevant database is establishedon the base of construction quota budget supplementary quota, which accumulates all kindsof information and data reflecting the actual production of the highway industry. Provideguidance to determine the bid price of highway construction project in the Inner MongoliaAutonomous Region economic and technical index of highway engineering bidding.Themain contents are as follows:(1) With the implementation of the thesis, the methods of highway engineeringsupplement and determination quota investigation is summarized, the implementation steps ofmeasurement and investigation is summed up, commonly used methods of quota form fillingare described in detail, and the work flow of the supplementary quota is improved.(2) During the preparation of this thesis, the principle of error in the Grab J criterion isusd for discarding the false and retaining the true when collecting a large number of originaldata. The bad data is well-identified, which provides the necessary conditions for the preparation of rigorous, reliable quota.(3) The basic principle of fixed amplitude difference coefficient formation has beenfamiliared with and analyzed. The construction time consumption caused by secondary timeconsumption expansion coefficient α, comprehensive process to expand the time consumptionexpansion coefficient β, the formation of two expansion coefficient γ are introduced, whichare compared with the current ministry quota amplitude.(4) With the current observation, investigation and data processing analysis form,additional quota achievement, sub-grade pavement, bridge, protection engineering and trafficengineering and facilities quota data for the Inner Mongolia section of Bayanhaote-YinchuanExpressway are formed.

Related Dissertations

  1. Research in the Control Strategy Evaluation of the Whole Process Cost Management of the Highway Construction Project,F284;F224
  2. Study on Enterprise Development Strategy of Guangdong Provincial Changda Highway Engineering Co., Ltd.,F542
  3. The Research on the Project Cost Model of the Rural Highway in Hunan Province,F284
  4. The Economy Pre-evaluation Study of Highway Project,F542
  5. BOT Financing Risk Management of Highway Construction Project,F542
  6. The Study on Logistic Management of Highway Engineering Project,F540
  7. Research of Legal Strategy for the Disputes of Engineering Changes in Highway Construction Contract,F542
  8. Highway engineering premium rate,F542;F224
  9. Study on the Cost Control in Earlier Stage of Highway Construction,F542
  10. Analytical Study on Investment Control of Qingdao-Khunjerab Line Elevated Sections of Highway Construction in Qingdao Project,F542
  11. The Small and Medium Road Engineering Construction Enterprises Project Risk Management,F542
  12. Research on Ecology of Highway Construction,F542;X322
  13. Research on Treatment Technology of High Fill Highway Landslide,U418.55
  14. Research on Controlling of Highway Engineering Change,F284
  15. Highway multi-parameter decision method,F542
  16. Research highway loess dam embankment,U416.12
  17. Highway engineering construction project bidding management research,F542
  18. The Research and Development of Highway Test and Check and Quality Inspection and Evaluation Integrate System,U415.1
  19. Highway Engineering Construction Supervision comprehensive evaluation method and decision support system development,U415.1
  20. Transient Rayleigh Wave Method in Highway Engineering Quality Detection Theory and Application,U415.1
  21. Research on the Model of Artificial Neural Network to Predict Investment of Highway,F540

CLC: > Transportation > Road transport > Road works > Road construction > Construction Management and Supervision > Technology Management
© 2012 www.DissertationTopic.Net  Mobile