Dissertation > Excellent graduate degree dissertation topics show

The Financing Study of Comprehensive Treatment Project in the W River

Author: XuYuKe
Tutor: ZhangYing
School: Central South University
Course: Business Administration
Keywords: hydraulic engineering financing strategy Projectfinancing
CLC: F406.72
Type: Master's thesis
Year: 2013
Downloads: 12
Quote: 0
Read: Download Dissertation

Abstract


In China, hydraulic engineering always plays an important role in economic construction, and it is also the strategic focus of bringing peace and stability to the country. Dongting Lake is of importance in its flood control and storage in the middle and lower reaches of Yangtze River, and the task of disaster prevention&reduction in W River area within Dongting Lake is burdensome at the same time. And what’s more, they have initiated a specialized program work in order to improve the surrounding ecological environment. And the construction of hydraulic engineering is the most crucial in eco-economic zone. However, financing is the key lies in hydraulic engineering construction. The financing of W River comprehensive treatment project still has some problems which need to be solved in the aspect of financing system. Facing with new situation in water project construction-sluggish global growth and slowing growth in national economy as a result of financial crisis, learning how to explore and innovate the financing mechanism actively is a challenging task in current hydraulic development.This thesis starts with current situation in financing of hydraulic construction. It gives a brief introduction of the features of water conservancy projects&economic assessment as well as related theory and knowledge firstly. Through the analysis of some water project financings at home and abroad, then it summarizes the current financing situation and existing problems within W River comprehensive treatment such as burdensome projects, huge investment scale, long construction cycle&irreversible investment. On the basis of W River comprehensive treatment plan’s approximate budget within its initial designing report which is authorized by related department, it protocols the project financing plan and makes a detailed analysis about its financial feasibility, economic assessment and risk factors which provides scientific evidences and sustainable measurements&advices for financing of W River comprehensive treatment in a point of view of long-term and developmental. In the end, it comes up with some expectations toward the future development in water project financing in order to promote the establishment of new mechanism in water project financing within region around Dongting Lake, and motivate the financing pattern getting into a good operation gradually, and structure an ecologically civilized eco-economic zone around Dongting Lake.

Related Dissertations

  1. The New Type of Steel Gate Design and Its Application in Hydraulic Engineering,TV66
  2. The Research on the Debt Financing Mechanism of Chinese Local Government in New Times,F812.5
  3. Study on the Management of Hydraulic Engineering Investment,F426.91
  4. Optimal Dynamic Protfolio Selection under Stock Price Process Subject to Fractional Brown Motion and Different Risk Measure,F830.91
  5. Research on Financial Strategy of HX Company,F275
  6. Modern Survey Technology in South-to-North Water Diversion East Line Jiping Main Channel Project’s Applied Research,P2
  7. Study on the Application of Skew Bridge in Hydraulic Engineering,U448
  8. Study on the Financing Strategies of Guizhou Private Scientific and Technological Enterprise,F275
  9. Corporate Financial Strategy Research,F275
  10. The R&D of the Medium and Small New High-Tech Enterprise’s Financing Strategies Studying,F275
  11. Study on the Financial Strategy Selection of Mature Enterprises,F275
  12. Study on Investment and Financing Strategic Development Planning of HB Corporation,F275
  13. Research on Financing Strategic of China’s Large-Scale Hydropower Projects,F426.91
  14. The Diversification Strategy of Tianjin Thermal Power Company,F279.26
  15. Development and Research of the Cost Software of Hydraulic Engineering,TP311.52
  16. Study on Financing Question and Countermeasure of Small and Medium-Sized Enterprises in Our Country,F275
  17. The Medium and Small Scientific and Technological Enterprise’s Financing Tactics Studying,F276.44
  18. Corporate Finance Strategies for Small and Medium Sized Enterprises in Hongkong,F275
  19. Reliability Analysis of Hydraulic Engineering Based on Finite Element Method,TV31
  20. Study on Cost Estimate System of Water Resources Projects Management,F426.91
  21. Enterprise Plan Research on Small-Medium Enterprise,F276.3

CLC: > Economic > Industrial economy > Industrial economic theory > Organization and management of industrial enterprises > Financial management and accounting > Financial management, cost management
© 2012 www.DissertationTopic.Net  Mobile