Research on Shenzhen Natural Gas Transmission and Distribution System
Author: LiZhen
Tutor: JieDongLai
School: South China University of Technology
Course: Chemical Engineering
Keywords: Transient simulation Peak shaving Natural gas forecasting LNG
CLC: TU996.6
Type: Master's thesis
Year: 2013
Downloads: 43
Quote: 0
Read: Download Dissertation
Abstract
|
With Shenzhen government offering strong support for clean energy, power plants,distributed energy sources and large industrial users will apply more natural gas, which willcontribute to the rapid growth of the requirements for natural gas. Then, not only will thenatural gas transmission and distribution system become huger, but also the user type and gasconsumption rule will become more complicated.Hence the study on the peak-shaving ofnatural gas will turn out to be increasingly important.In this paper, an investigation is made on current as well as short-and long-term planningof Shenzhen natural gas transmission and distribution system. Meanwhile, peak-shavingfacilities are designed for the daily peak-shaving and quarterly (monthly) peak-shavingexcluded in supplementary contract through combining with the relevant contractual clausesconcerning the gas source of West–East Gas Pipeline II and LNG source of GuangdongDapeng LNG Company Ltd. Additionally, based on the consideration about future demandand the gas supply capacity of the equipment in the distribution station of upper reaches,hourly peak-shaving is also taken into account.Based on supply data of urban gas and power plant gas, this paper analyzed thenon-uniform coefficient of users’ consumption,then proposed category simplification andstage-based methods for gas consumption forecasting. In this paper, short-term (2013-2015)and long-term (2020) gas load of power plant (including distributed energy source) and urbangas will be forecasted. The urban gas short-term load forecasting model is choiced fromseveral regression models, which prediction accuracy can meet requirements of practicalprojects. The urban gas long-term load and power plant loda should refer to and adjustrelevant planning data and according to actual condition. The category simplificationmethod has presented new forecasting approaches for gas company which hasenrich totalgas consumption data and lack classification data..According to the forecasting gas consumption, the estimated short-and long-term hourly,daily and seasonal peak-shaving gas amout, and Shenzhen’s actual condition, the appropriateshort-and long-term peak-shaving schemes are made. The pipeline gas storage and LNGstorage methods are adopted as present schemd;in the short term, the80,000cubic-meterHuaAn-Safety LNG storage is utilized to proceed the daily and monthly peak-shaving; in thelong term, the integration of gas source and peak-shaving will be achieved through the LNGreceive station. By simulating peak-shaving operating condition of current, short and longterm, and comparing the running parameters such as flow and pressure of each gas source andminimum pressure of user,GREGG piping dynamic simulation software is utilized to furtherverify different period peak-shaving scheme, as well as to provide constructive suggestionto optimize the peak-shaving operation scheduling.
|
Related Dissertations
- K Company’s Improving Planning and Forecasting for the Reasonable Allocation of Inventory,F224
- The Setting Bases of Working Pressure in LNG Systems and Orthogonal Experiment Design of Heat Exchangers,TQ051.5
- Research on Physical Properties and Data Processing in the Process of Removing Acid of LNG,TE644
- State cigarette sales forecast Influencing Factors,F224
- Research on the Development Strategy of Chaoyang Natural Gas Company,F426.22
- Grey System Theory and the Comparison of Related Models,N941.5
- Application of Risk Analysis Technique by Combination of Qualitative and Quantitative Methodology in LNG Terminal Projects,F426.22
- Qinshui Basin Carboniferous - Permian coal-bearing strata of free gas reservoir type more quantitative analysis of dependencies,P618.13
- The Introduction of Combination Forecast Method and Empirical Analysis,O212.1
- Application of the Modern Surveying Data Processing Technology in Estimation of Energy Demand,P25
- Research on Power System Short-Term Load Forecasting Method Based on Neural Network,TM715
- Research on Now-casting Technique for Severe Convective Weather in Ningbo,P456
- Research on Gas Accumulation in Northern Tianhuan Depression, Ordos Basin,P618.13
- Strategy Research of China Petroleum Pipeline Company SeningLan Gas Sales Branch of Company,F426.22
- Research on Supply and Demand Fore-cast of Chinese Heavy Truck Market,F274
- Forecasting System in Excavation Ditch Based on Neural Network and FLAC3D Analysis,TU433
- Research on Support Vector Regression in Prediction of the Short-term Load of Power System,TM715;F224
- Panzhihua City, the Western Modern Logistics Center Strategic Planning,F259.2
- Research on Listed Tourism Companies Financial Crisis Prewarning Model Based on the Theories of Grey Neural Network,F224
- Research on Precipitation Distribution Pattern and Flood Disaster Forecasting in Typical Areas of Changbai Mountain,P426.616
- The Expert Advisor of Exchange Rate Forecasting Based on BP Neural Network,F830.92
CLC: > Industrial Technology > Building Science > Municipal Engineering > City gas supply > Gas Transmission and Distribution
© 2012 www.DissertationTopic.Net Mobile
|