The Operation Scheduling System for Blooming Mill in Continuous-casting and Finishing-rolling Stages
Author: FangZuo
Tutor: TangLiXin
School: Northeastern University
Course: Systems Engineering
Keywords: reheat furnace first rolling production planning and scheduling scatter search decision supported system
CLC: F273
Type: Master's thesis
Year: 2009
Downloads: 24
Quote: 0
Read: Download Dissertation
Abstract
|
The bloom production line is a typical production line in iron and steel enterprises, which is characterized as multi-process, multi-object and crossing of material flow. With the development of information, it is essential of applying intelligent management method to the bloom production operation scheduling such that the efficiency of the overall production line is improved. Efficient operation scheduling is an important approach to balance the material flow of the bloom production line, to improve production efficiency and product quality. Moreover, it also significant in improving resource unitization, reducing production cost and energy consumption. This dissertation takes the bloom production as research backgrounds, and studies cold bloom configuration problem, reheat furnace sequencing problem and continuous-casting and finishing integrated scheduling problem. The decision supported system of the bloom production line is developed. The main research contents of this dissertation are as follows:(1) The cold-bloom configuration problem is to determine how insert the cold blooms into the idle time once the sequence of hot blooms on rolling machine is given, so that production capacity of rolling machine is sufficiently unitized. In this paper, a mathematical programming model, which takes the changeover of blooms specification and the tardiness of orders as the objective, is proposed for the cold bloom configuration problem. For the characteristics of large scale and complicated constraints, an intelligent optimization algorithm based on neighborhood search and scatter search is proposed to solve the model. The experimental results verify the effectiveness of the proposed algorithm.(2) Reheat furnace sequencing problem is to determine the processing sequence of blooms which arrive on the reheat furnace through different routes. The reheat furnace sequencing problem is NP-hard problem. In this paper, a mixed-integer nonlinear programming model is developed. The objective of the model is to minimize the waiting time before reheat furnace, the tardiness of orders, the changeover of blooms specification and the makespan as objects. Due to the complication of the problem and the requirement of quick response in practical application, a heuristic is constructed so that this problem can be quickly solved in a reasonable computation time.(3) The continuous-casting and finishing integrated scheduling problem is to determine the timetable of blooms on each machine. In this paper, a linear programming model is developed to solve the problem. Its objective is to minimize the waiting time before machines and the tardiness of orders. Based on the combination of time-forward and time-backward idea, an effective heuristic algorithm is designed to solve this model. The result of running verifies the efficient of this algorithm.(4) After analysis the requirements of bloom production scheduling system, the different modules of the system is designed and developed. The simulation simulates the production process of each machine, so that an intuitive understanding of each machine of bloom production line can verify the reasonability and affectivity of the plan and schedule. The system is trial running in an iron and steel enterprise of China, and the reply of planner shows that the system is stabilized and favorable.
|
Related Dissertations
- Optimization System of Material Access and Spatial Schedule in the Steel Industry,F426.31
- Research on Computer Process Control of Reheat Furnace for Medium Heavy Plate,TG307
- The Research and Application of MES in Aviation Manufacturing NC Workshop,TP311.52
- Study on Production Planning and Schedule Based on Production Process Decoupling Point of MC,TH186
- The Application of Scatter Search in Integrated Model for Hot Rolling Scheduling in Shanghai Baoshan Iron & Steel Complex,TG335.11
- Applying Scatter Search Algorithm to Capacitated p-Median Problem in Facility Location Allocation,TU984
- Blower Factory Siping dynamic production planning management method,F426.4
- Research on Lean Advanced Planning and Scheduling in Discrete Manufacturing Industry,F273
- The Research and Implement to Method of Constraints Applying in Production and Sales Unification System,TP311.52
- Virtual Enterprise Production Planning and Scheduling Optimization Model,F273
- Aerospace Bearing Manufacture Subsidiary Company’s Productive Plan Row of Regulation Optimization Research,F426.4;F224
- Multi-plant Collaborative Production Planning and Scheduling,F273
- Research and Implementation of Mixed Manufacturing Production Management System Based on ERP and MES,TP399
- Research on Mas-Based Production Planning and Scheduling System for Corporations Manufacturing Moulds,TH164
- Research of Production Planning and Scheduling for Refinery,TP319
- Research on Intelligent Job Shop Scheduling and Its Applications Based on Multi-objective,U664.3
- Research about the Production Planning and Scheduling in Newspaper Printing,F426.84
- Research on Some of the Scheduling Techniques in the Workshops of the Vestee Enterprises,F426.8
- Container terminal operating line scheduling decision support system,U695.22
- Under. NET device management and planning of the development of optimized components of the system,TP311.52
- Study on Agent-Based Production Planning and Scheduling System,TP399
CLC: > Economic > Economic planning and management > Enterprise economy > Production management
© 2012 www.DissertationTopic.Net Mobile
|