Based on the Analytic Hierarchy Process BOT+EPC Project Risk Management Research

Author: TangChun
Tutor: LiuLang
School: Chongqing Jiaotong University
Course: Project Management
Keywords: BOT+EPC mode risk identification risk assessment risk index system AHP
CLC: F281
Type: Master's thesis
Year: 2013
Downloads: 63
Quote: 0
Read: Download Dissertation

Abstract


As China’s overall economic strength of the rapid increase, the government pay more attention to basic industries, public infrastructure investment and construction, the construction of such projects need to invest a lot of money, is bound to bring enormous financial pressure. In addition, China’s infrastructure construction projects and demand is greater than the existing capacity-building, facing oversupply situation, how within the stipulated time of completion of quality and quantity, protection of huge capital investment return guarantees, is worth studying. Given the above project financing and how to effectively promote the construction projects these two issues, discuss the current construction of the more commonly used mode of BOT model and EPC to seek the integration of these two models to solve the current infrastructure problems.This paper describes the construction of BOT Financing Mode and EPC contracting model of the basic theory. On the BOT model, the concept of analysis from the BOT model of participants and their responsibilities, and from the BOT model describes four stages of the model form, the last of analyzing the characteristics of the BOT model. On EPC mode, the first analyzes the evolution of project management, the introduction of the concept of EPC model were elaborated design, procurement, construction three aspects of meaning; Second, from the various stages of EPC project specific work content, summed up in EPC Mode. Finally, from the integration of efforts, time integration, participation of people converged three angles constructed BOT+EPC project investment and construction of the new model.Secondly, the introduction of project risk and risk management of the main characteristics of the content, focusing on the BOT project risk and project risk EPC, BOT projects were constructed Risk Index System and EPC project risk index system; then combine these two risk index system, Summary build BOT+EPC mode risk index system. Secondly, the introduction of risk management related content:risk identification, risk assessment, risk response, obtained BOT+EPC mode, the overall project risk checklist highlights the Analytic Hierarchy Process (AHP). Finally, the combination of the above studies, Chongqing South Road BOT+EPC project done some research, the project risk response comments.

Related Dissertations

  1. Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
  2. Highland lakes Lakes sustainable development assessment system and model,X22
  3. The Reaserch and Application of Fuzzy AHP,O225
  4. Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
  5. Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
  6. The Selection of Leading Industry and Industry Distribution in Environmentally Vulnerable Area,X321
  7. Research on the Soil Environmental Function Zoning,X321
  8. Drought Risk Analysis of Dazhen Irrigated Area,S423
  9. Biotypes of Bemisia Tabaci and Resistance Risk Assessment on B Biotype to Pyriproxyfen in XinJiang,S433
  10. A Comprehensive Evaluation of Heritage Trees,S788
  11. The Workout of Atmospheric Environmental Risk Prediction Software,TP311.52
  12. Study of Evaluation System on Security Management of HS Company,F426.21
  13. The Research and Construction of Ecological Risk Assessment and Warning Manage System in Typical Oilfield,X826
  14. Research of Contaminated Site Investigation and Assessment Information System for Soil,X825
  15. Risk Assessment & Spatial Distribution of Soil Nutrients and Heavy Metal in Fenhe Reservoir Surrounding,S158
  16. Offshore oil platform construction phase Operational Risk Management Research,F426.22
  17. Dairy Enterprise Competitiveness Evaluation System,F224
  18. Road Traffic Safety Comprehensive Evaluation Method,U492.8
  19. Chemical Industrial Park Environmental Risk Management Technology Source,X327
  20. Method Optimization on Pretreatment of Soil Sample for the UMU Test and Risk Assessment,X820.4
  21. Research on Risk Evalution of Coal Enterprises’ Diversified Management,F426.21

CLC: > Economic > Economic planning and management > Infrastructure the economy > Infrastructure planning and management
© 2012 www.DissertationTopic.Net  Mobile