Dissertation > Excellent graduate degree dissertation topics show
Protection Scheme and Setting Caculation of Traction Power Supply Systems for Passenger Dedicated Line
Author: ZhouXiaoDong
Tutor: ChenXiaoChuan;ChenXueGuang
School: Southwest Jiaotong University
Course: Electrical Engineering
Keywords: Passenger Line All Parallel AT Power Supply Protection configuration Setting Calculation
CLC: U223.6
Type: Master's thesis
Year: 2009
Downloads: 81
Quote: 2
Read: Download Dissertation
Abstract
|
Tuning calculated based on the actual construction of the Wuhan-Guangzhou Passenger Line ( Wuhan - Guangzhou) , the focus of its traction power supply system relay protection program analysis , in order to protect one substation example . The railway line for passenger EMU , the load current conventional locomotive very different , combined with the most traction network AT power supply fully parallel protection configuration with the conventional way of protection of the power supply system is also very different , you must seek a new protection scheme to meet the reliability and safety of passenger dedicated line relay protection . Main transformer protection using traditional protection solutions , that is the main protection configuration of the differential protection , the second harmonic blocking ratio differential protection and gas protection ; configuration backup protection for high and low pressure side of the low- voltage startup overcurrent protection , overload protection line voltage protection and temperature protection . This paper analyzes the features of parallel AT Traction Power Supply normal and short-circuit . Combination of short-circuit analysis , the following reasonable protection program : traction the network feeder protection configuration section of impedance protection , low voltage startup current, once reclosing ; AT configured incoming line voltage protection , seized pressure reclosing ; AT transformer configuration difference dynamic protection, overcurrent protection , gas protection and temperature protection . Traction network AT the partition on the downlink parallel and network protection settings for the traction network failure , Feeder Protection immediate action breaker breaking traction in this article , then AT partition the circuit breaker has breaking the parallel the network becomes not parallel , and impedance protection with high sensitivity , so you only need to set the period of impedance protection and to protect the full length of the traction network . To survive the AT the partition breaker reclosing AT produced by magnetizing inrush current to prevent the malfunction of the feeder protection , the AT the partition seized pressure RECLOSURE time stagger , set the second time differential .
|
Related Dissertations
- Economic Evaluation of Chengdu to Chongqing PDL Base on Railway Network System,U212.1
- Analysis on Relay of Large Pumped-storage Unit and Study on Setting Calculation,TM774
- Small and medium span bridges the live load design standards of the high-speed rail,U442
- The Changes of Transportation Channels after the PDL Introduce and Development Strategy Research,U293.1
- Issues related to research and application of substation automation system,TM63
- The Study of Relay Setting Calculation with A Foreign City Power Network,TM771
- Study on Retrofit Scheme of Improving Relaying Protection Reliability of Hulunbuir,TM774
- Research of Multiple Units Crew Plan Established System for Passenger Dedicated Line,U293.1
- Design and Implementation of Motor Train Sets Scheduling System for Passenger Dedicated Lines,U268
- Stability Analysis Based on Surface Subsidence of Shendan PDL Benxi Section,TD325
- Research on Fixed Value Setting and Design on Management System of Relay Protection for Power Plan,TM774
- The Study on the Computing System of Relay Coordination for Extra-High Voltage Power Grid Based on .NET Platform,TM774
- Research of Setting Calculation Software of Relay Protection for Power Network,TM771
- Research on Power Grid Relay Protection Coordination Software,TM774
- Researching on Stable Performance of Ballastless Track Embankment Structure in Beijing-Tianjin Passenger Transport Line,U213.1
- Research on Risk Analysis and Risk Assessment of Passenger Dedicated Line’s Construction Project,F532
- Protection Device Integrative Coordination and Setting Docume System for Distribution Power Grids,TM73
- Study on Typical Load Curve of Traction Transformer and Capacity Optimization for High-Speed Rail Way,TM922.73
- Reliability Analysis and Evaluation of Traction Power Supply System for Passenger Dedicated Line,TM732
- Research on A General-purpose System of Relay Protection Setting Calculation,TP311.52
- Study on the Method of Fault Calculation and Setting Calculation about Electrified Railway Traction with V/V Transformer,TM922.3
CLC: > Transportation > Rail transport > Electrified railway > Power supply > Power supply system
© 2012 www.DissertationTopic.Net Mobile
|