Dissertation > Excellent graduate degree dissertation topics show

Protection Scheme and Setting Caculation of Traction Power Supply Systems for Passenger Dedicated Line

Author: ZhouXiaoDong
Tutor: ChenXiaoChuan;ChenXueGuang
School: Southwest Jiaotong University
Course: Electrical Engineering
Keywords: Passenger Line All Parallel AT Power Supply Protection configuration Setting Calculation
CLC: U223.6
Type: Master's thesis
Year: 2009
Downloads: 81
Quote: 2
Read: Download Dissertation

Abstract


Tuning calculated based on the actual construction of the Wuhan-Guangzhou Passenger Line ( Wuhan - Guangzhou) , the focus of its traction power supply system relay protection program analysis , in order to protect one substation example . The railway line for passenger EMU , the load current conventional locomotive very different , combined with the most traction network AT power supply fully parallel protection configuration with the conventional way of protection of the power supply system is also very different , you must seek a new protection scheme to meet the reliability and safety of passenger dedicated line relay protection . Main transformer protection using traditional protection solutions , that is the main protection configuration of the differential protection , the second harmonic blocking ratio differential protection and gas protection ; configuration backup protection for high and low pressure side of the low- voltage startup overcurrent protection , overload protection line voltage protection and temperature protection . This paper analyzes the features of parallel AT Traction Power Supply normal and short-circuit . Combination of short-circuit analysis , the following reasonable protection program : traction the network feeder protection configuration section of impedance protection , low voltage startup current, once reclosing ; AT configured incoming line voltage protection , seized pressure reclosing ; AT transformer configuration difference dynamic protection, overcurrent protection , gas protection and temperature protection . Traction network AT the partition on the downlink parallel and network protection settings for the traction network failure , Feeder Protection immediate action breaker breaking traction in this article , then AT partition the circuit breaker has breaking the parallel the network becomes not parallel , and impedance protection with high sensitivity , so you only need to set the period of impedance protection and to protect the full length of the traction network . To survive the AT the partition breaker reclosing AT produced by magnetizing inrush current to prevent the malfunction of the feeder protection , the AT the partition seized pressure RECLOSURE time stagger , set the second time differential .

Related Dissertations

  1. Economic Evaluation of Chengdu to Chongqing PDL Base on Railway Network System,U212.1
  2. Analysis on Relay of Large Pumped-storage Unit and Study on Setting Calculation,TM774
  3. Small and medium span bridges the live load design standards of the high-speed rail,U442
  4. The Changes of Transportation Channels after the PDL Introduce and Development Strategy Research,U293.1
  5. Issues related to research and application of substation automation system,TM63
  6. The Study of Relay Setting Calculation with A Foreign City Power Network,TM771
  7. Study on Retrofit Scheme of Improving Relaying Protection Reliability of Hulunbuir,TM774
  8. Research of Multiple Units Crew Plan Established System for Passenger Dedicated Line,U293.1
  9. Design and Implementation of Motor Train Sets Scheduling System for Passenger Dedicated Lines,U268
  10. Stability Analysis Based on Surface Subsidence of Shendan PDL Benxi Section,TD325
  11. Research on Fixed Value Setting and Design on Management System of Relay Protection for Power Plan,TM774
  12. The Study on the Computing System of Relay Coordination for Extra-High Voltage Power Grid Based on .NET Platform,TM774
  13. Research of Setting Calculation Software of Relay Protection for Power Network,TM771
  14. Research on Power Grid Relay Protection Coordination Software,TM774
  15. Researching on Stable Performance of Ballastless Track Embankment Structure in Beijing-Tianjin Passenger Transport Line,U213.1
  16. Research on Risk Analysis and Risk Assessment of Passenger Dedicated Line’s Construction Project,F532
  17. Protection Device Integrative Coordination and Setting Docume System for Distribution Power Grids,TM73
  18. Study on Typical Load Curve of Traction Transformer and Capacity Optimization for High-Speed Rail Way,TM922.73
  19. Reliability Analysis and Evaluation of Traction Power Supply System for Passenger Dedicated Line,TM732
  20. Research on A General-purpose System of Relay Protection Setting Calculation,TP311.52
  21. Study on the Method of Fault Calculation and Setting Calculation about Electrified Railway Traction with V/V Transformer,TM922.3

CLC: > Transportation > Rail transport > Electrified railway > Power supply > Power supply system
© 2012 www.DissertationTopic.Net  Mobile