Dissertation > Excellent graduate degree dissertation topics show

Research on Construction Design of Precast Splice of Simple Supported Box Girder in High-speed Railway

Author: XiaoNengLi
Tutor: XiangZhongFu;ZhouJianBo
School: Chongqing Jiaotong University
Course: Architecture and Civil Engineering
Keywords: high-speed railway bridge continuous box girder construction organization design equipment configuration
CLC: U445.1
Type: Master's thesis
Year: 2011
Downloads: 64
Quote: 0
Read: Download Dissertation

Abstract


Wth the characteristics of a large bridge proportion,the high-speed railroad bridge construction organization directly related to the construction period,project quality and project cost of the high-speed railroad of the high-speed railroad, which is the difficult problem abou technology and management required solution urgently.The high-speed railroad bridge is different with the bridge of ordinary railroad and highway by the rigidity,the integrity,smoothness,advantageous for service and so on.The special request makes the high-speed railroad bridge use the small or medium span freely supported box girder,the majority using the frame girder generally.Because the constructon of the high speed railway in China has just started,the bridge construction methods and construction design still in the exploratory stage,therefore,the construction organization research of the high-speed railroad freely supported box girder has a great theoretical and practical significance.Construction organization of the high-speed railroad freely supported box girder include the bridge construction technology,the choice and design of engineering equipment,the analysis and design of construction period,how to do frame girder and so on.This article analyzed and researched construction scheme of construction technique and equipment,time limit for a project,scheme of how to make,transport and erect girders,setting and site selection of girders factory,plane layout,detailed design and cost analysis of high-speed railroad freely supported box girder in China,which based on reaching and summing up the theory and experience of China`s existing construction organizations of dedicated-passenger railway lines and theory and practical research achievement at home and abroad.The following is the main conclusion and innovation spot:The bridge of high-speed railway must have sufficiently large vertical and lateral stiffness and good integrity,therefore,the high-speed railway bridge generally use the box beam,and a freely supported for the main structural types.The construction of the high-speed railway freely supported box girder should make girders all in the factory which is set on the spot,and transport the girders by wheel-type trucks.It should use 900t bridge erecting machince as the main construction scheme in order to save investment and project construction period,guaranteeing the construction quality of box girder better.The supply scope of the high-speed railroad freely supported box girder factory should less than 35km.Radius of transporting and erecting girders should less than 18km.The erection of box girder should start 11-12 months after the startinf of the lower part engineering construction period is shorter than others,to shorter the construction period of engineerin.The location of girder factory should be near railway line which has a better geological conditions.At the same time,implement the principle of the economical use of land and making full use of formal land for the engineering,saving engineering investment.The scale of the girder factory should be determined after the technical and economic comparison,and be based on construction period and tooling equipment situation.

Related Dissertations

  1. Research on the Revenue Distribution of PPP Mode about High-speed Railway Project,F283
  2. Research on Power Supply of Contactless Power Transfer System,TM46
  3. Chemical Synthsis, Activity Evaluation and Expression of the Novel Conotoxins from South China Sea,TQ464
  4. Nano LaFeO 3 Controllable Synthesis and TiO 2 bridged construct composite photocatalyst,O643.36
  5. Bearing Capacity of Cast-in-place Piles in the Karst Region of Yichun, Jiangxi,U213.1
  6. The Large Concrete Hydration Heat Temperature Effects Research of the Cable Stayed Bridge,U441.5
  7. From Virtual Community to the Real Life: How the Star Stautus Influence People’s Social Capital,G206
  8. Monitioring of Mechanics Properties of Geogrid-Reinforced and Pile-Supported Embankment in Chaoshan Station,TU470
  9. Research on the Virtual Prototype and Dynamics Simulation of Bridge Crane,TP391.9
  10. Silicon pressure sensor design of analog-digital conversion circuit,TP212.1
  11. Study on Construction Monitoring of Prestressed Concrete Low-pylon Cable-stayed Bridge,U445.466
  12. The Development and Application of Spray Polyurea Elastormer Waterproof Material on High-speed Railway,TQ639
  13. The Research on Track Irregularity Caused by Settlements of the Light-rail Bridge Pier,U213.2
  14. Study on Spatial Development Patterns and Planning Countermeasures of "high-speed Railway New Town" Along Beijing-Guangzhou High-speed Railway,TU984.113
  15. Research on the Development Strategies of High-Speed Railway Station Region,TU984
  16. Simulation of Rail Moving Boundary Based on Lattice Boltzmann Method,U213.2
  17. The Research of the Influence by the Materials of High-speed Railway Station Waiting Room on Sound Environment,TU112
  18. Study on Construction Disturbance of Partition Piles for Surrounding Soil,TU473.1
  19. Based close to the feel of underwater micro robot servo control study,TP241
  20. With wireless transmission function digital torque measurement systems research and development,TH823
  21. Domestic and international rail engineering design method comparison,U21

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction organization and management
© 2012 www.DissertationTopic.Net  Mobile