Abstract


Post-project evaluation is an important part of the project life cycle, it is the project construction is completed and put into operation after a period of time for project preparation, project decision-making, the construction process, operations and other aspects of the process of comprehensive, analysis and evaluation projects in the established objectives, the process of implementation, social, economic and role of the impact and status of sustainable development. Thus achieving the desired objectives to determine the extent, from which lessons learned, follow-up projects to improve the investment efficiency of decision-making level and provide a reference. Through the post-evaluation can be achieved certain results, sum up experience, draw lessons and make recommendations to improve the work of the purpose, continuously improve the level of project management and investment decisions of great sign-ificance.For the completion of the State Council "Eleventh Five-Year" plan for urban sewage treatment goals, local governments faced with a huge urban sewage treatment funding conflicts with the limited government financial resources, BOT model of government at all levels to ease the financial pressure, the rapid construction of operating sewage treatment facilities, improving the urban environment of the top investment and financing, and in the "Tenth Five-Year" period of rapid development.BOT model has become China’s construction and operation of urban sewage treatment works most widely used mode of application.In this paper, it is describing the background of subject, Studying situation and discussed ideas by post-project evaluation of sewage treatment works based on the BOT mode at first.On the BOT model, sewage treatment works in the application and development and the mode of risk analysis are carried out to be explored, the theory, content and methods of post-project evaluation is introduced.And then to adopt the second sewage treatment plant of the Heshan City ,that is construction and operation based on BOT model as an example, after summing up the project’s preparatory work, Construction and implementation phase of the "Three control" (investment, quality, schedule control) ,operations over the past year work situation, using the Delphi method to establish the project evaluation system, to calculte all levels of index weight by hierarchical analysis method,expert rating is carryied out to treatment with membership degree matrix score,accordance with the multi-layer fuzzy comprehensive post-evaluation methods, using equations of evaluation to calculate and evaluate the project, arrive at a comprehensive evaluation of the project findings.Through the evaluation, the project’s design is reasonable.During the construction investment, the progress and quality management. The project has a higher level of control, achieving its social and economic benefits, it plays a key role in the sewage treatmen of Heshan City, the construction and operation of the project is successful. As BOT model is more and more widely used in the construction of sewage treatment works, post-evaluation of this project can provide useful lessons and examples of experience for the construction of similar projects in the future.

Related Dissertations

  1. Preparation and Performance of Molecular Imprinted Polymers for Rhodamine-B and Rhodamine-6G,O631.3
  2. An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
  3. The Clinical Observation of Curative Effect Made by Differential Treatment of Refractory Thrombocytopenic Purpura,R259
  4. The Clinical Observation of the Lupus Detoxification Pill on Treating the Remission of Systemic Lupus Erythematosus,R259
  5. Effects of acupuncture on stroke recovery associated with depression and physical disabilities,R246.6
  6. The Study on Risk Evaluation of BOT Projects in China University,G647
  7. A Study on the Curriculum Reform of Higher Vocational Education,G712.3
  8. Ecological Footprint Analysis of Building Project Based on Energy Comsumption,X826
  9. Our charging system research,X196
  10. Platelet parameters in patients before and after acute myocardial infarction,R542.22
  11. The Safety Management Research of R Construction Project Based on PDCA,TU714
  12. Study on Fusion Characteristic and Mineral Change of Blends of Sludge and Coal,X703
  13. Study on the Internal Control Issues of Highway Construction Investments,F540.34
  14. Research on Construction Accident Factors’ Interaction Relations,TU714
  15. The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
  16. Study on Schedule Plan and Control of Smart Card Appllying System for HNU,TP399-C1
  17. Study on Top-post Internship Program Management in Vocational Colleges,G712.4
  18. Research on Building Teachers’ Team with Double Skilled Quality in Secondary Vocational Education Based on Project Management,G715.1
  19. Research on Agent Construction System Management Model of Highway Project,F283
  20. Varieties of Strawberry Diseases’ Investigat in Jurong & the Experiment of Strawberry Diseases’ Chemical Treatment,S436.68
  21. The Experimental Research on Using Electroacupuncture to Treat the Dysfunction Memory of Rats Suffered from Alzheimer’s Disease,R245

CLC: > Industrial Technology > Building Science > Municipal Engineering > Drainage works ( ditches works,sewer works) > Sewage , sludge handling and use of
© 2012 www.DissertationTopic.Net  Mobile