Dissertation > Excellent graduate degree dissertation topics show

Research on Project Management of Nierji Transformer Substation

Author: MaJiaPeng
Tutor: GuoJunPeng;WangZhongXin
School: Tianjin University
Course: Project Management
Keywords: Organizational design Quality Management Schedule management Construction
CLC: F426.61
Type: Master's thesis
Year: 2009
Downloads: 34
Quote: 0
Read: Download Dissertation

Abstract


With the development of international and domestic forms , the state has increased infrastructure investment , the construction of power facilities are widely expand . Substation projects completed scientific or not , is not only related to the suitability of the project , and other energy-intensive industries and the production and living of the masses of the people have an important impact , so in the engineering construction , architecture and good organizational forms , strengthen the project construction quality management , to secure the project is on schedule in accordance with the progress of science , and of great significance to improve the construction efficiency , save construction costs . The 220kV substation construction project to Nierji for example, that the organization of the implementation phase of the project to build , quality management and schedule management are discussed . Describes the basic principles of design of the project organization , as common project organization structure , combined with the actual situation of the project , organization design the Nierji 220kV substation project . The history of the development of the common terms of quality management and quality management . The basis of the quality control of the basic theory, the implementation phase of the project including construction quality control . Combined Zhalantun the - Nierji 220kV transmission project specific research and elaboration of corresponding measures of the engineering principle of quality management , quality management institutions and their functions , the quality of management . Summarize the common methods of progress management based on Zhalantun the - Nierji 220kV transmission project schedule management . Finally, a summary of the full text .

Related Dissertations

  1. Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
  2. The Research on Artisitify Technology of Santiago·Calatrava’s Architectural Works,TU-86
  3. The Research on the Architecture Design of Science and Technology Museum,TU242.5
  4. The Research on Space Organization and Combination of the Multiplex Cinema Builders,TU242.2
  5. Newly Campus Culture Construction,G641
  6. The Study of Text Index Construction for Large-Scale Dynamic Collection,TP391.3
  7. Context-Dependent Lexical Paraphrasing,TP391.1
  8. Improvement of Ant Colony Algorithmand Its Application in Robot Path Planning,TP242
  9. Research on the Brand Establishment of Amateur Swimming Clubs in Fuzhou and Xiamen,G861.1
  10. Geographical Theory and Practice of Effective Teaching,G633.55
  11. Construction of new suburban rural grassroots party organizations,D267.2
  12. On Practical Exploration of Construction of Students’ Self-management System,G637
  13. Xinjiang Oilfield Ground Construction Cost Indicators and Management Information System Study and Application,F284
  14. Lightweight Aggregate Made from Waste Residue of Construction、Reclamation of Waste Foundry Sand Dust and Sludge,TU528.042
  15. The Safety Management Research of R Construction Project Based on PDCA,TU714
  16. Play the main role of farmers in the new rural civic morality,D648
  17. Research on Selection and Construction of the China’s Social Security Budget Pattern,D632.1
  18. Application of Improved Principal Component Analysis Algorithm in Course Construction,G642.4
  19. Discussion on the development of the western region of low-carbon economy and the construction of ecological civilization,X24
  20. The Evaluation of Indicator System of Ecological Civilization Construction,X2
  21. The Evaluation and Research Rural about Ecological System Service Function,X171

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile