Dissertation > Excellent graduate degree dissertation topics show
Analysis on Construction Process and Mechanical Performance of Submarine Pipeline in Surface Tow Method
Author: ZhangBaoLin
Tutor: ZhouTianHua;YangZhenPing
School: Chang'an University
Course: Architecture and Civil Engineering
Keywords: Submarine pipeline Floating dragging method Construction technology Force performance
CLC: TE973
Type: Master's thesis
Year: 2010
Downloads: 128
Quote: 0
Read: Download Dissertation
Abstract
|
With the development of offshore oil , submarine pipeline as an important part of the offshore oil storage and transportation system , has been widely used. Laying of submarine pipeline construction technology complex , high- risk . And an important part of the pipelay construction pipeline transport to target sea area , the pipeline will be in the process of wind , waves and currents . It is extremely important to ensure the safety of the pipeline in the transportation and laying process and reduce costs , to determine the pipeline by environmental loads , calculation and analysis of the strength and stability of the pipeline . This article relying Luanda, Angola subsea pipeline projects were introduced , with a focus on the port of Luanda for some 600 meters of the bottom line of the refined oil terminals floating dragging method construction process , including construction methods in the construction process , the selection of the program , by undersea pipeline deformation and mechanics checking , as well as the place of the pipeline sinking stability analysis of the performance of the force . Mechanical calculations and analysis show that : The selected facilities Ⅱ arts to ensure the security of the submarine pipeline facilities Ⅱ away ; submarine pipeline strength , stability force performance to meet the requirements .
|
Related Dissertations
- Ancient Bridges and Quanzhou’s Society,K295.5
- Study on the Frame Structure Asphalt Mixture,U414
- Research on the Construction Technique of Flyash Subgrade,U416.1
- Research on Constructing Technique of Synchronous Chip Seal,U418.6
- Study of Construction Technology for Old Cement Concrete Pavement with Thin Asphalt Coating,U416.2
- The Use of the Asphalt Pavement In-place Cold Recycling in the G108 Heavy Maintenance,U418.6
- Vacuum - heaped load combined precompression processing embankment on soft Experimental Study,U416.1
- Highway hollow Itabashi widening transformation technology research and application,U445.6
- Study on Key Technology of Arch Surround Method for Reinforcing Stone Arch Bridge,U445.72
- The Application Research of Asphalt Treated Base in Changzhang Expressway,U416.217
- The Research on Vacuum and Embankment Preloading Method Applied to the Treatment of Soft Soil Foundation,U416.1
- Study on Construction Technology of Cement Stabilized Detritus,U416.214
- Cement Recycling Base Application Technology,U414
- Structure Research of Typical Rural Road Pavement in Taian,U416.2
- The Reliability Analysis of the Pile Foundation Underpinning Engineering in the Shallow-Buried Tunnel,U455.4
- Study and Mechanics Analysis About Honey Comb Core Reinforced Concrete Hollow Slab,TU375
- Complex environment section group hole cross- site hole pile construction mechanics behavior and key technology research,TU473.1
- Finite Element Analysis on the RC Column-H Section Beam Structure’ Mechanics Property,TU398.9
- Local Building Construction in Jilin Province and Construction Technology Research,TU241.4
- Research of Key Construction Techniques and Model Experiment of Suspen-Dome,TU399
- Theory and Application of CFG Pile Composite Foundation Design,TU473.1
CLC: > Industrial Technology > Oil and gas industry > Oil machinery and equipment and automation > Oil and gas storage and transportation machinery and equipment > Oil and gas pipelines