Dissertation > Excellent graduate degree dissertation topics show

Research on the Key Technology in Construction Control of Long Multi-span PC Continuous Beam Bride

Author: QuGuangZhen
Tutor: HuangPingMing;XuHanZuo
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: multi-span continuous beam bridge construction control shrinkage and creep temperature effect closure order
CLC: U445.4
Type: Master's thesis
Year: 2010
Downloads: 61
Quote: 2
Read: Download Dissertation

Abstract


During the segmental construction of the multi-span continuous beam bridges, the system transforms and removing the temporary consolidation will lead to the change of the internal force and deformation of the structure as the main beam extends.In order to ensure not only the joining accuracy of the structural and the alignment of the finished bridge, but also the final elevation meeting the design requirement after a period of operation,it is very important to execute process control in long-span prestressed concrete continuous girder bridge.Based on the project of the Hanjiang Bridge, the paper analyses and studies some factors which make affect linear and stess of the bridge, Through establishing beam-element models using the program Midas/Civil, combining with the practice of construction control, the thesis makes the simulation analysis about the whole construction processes. The paper mainly has the content and conclusion as follows:1. The paper calculates stress of multi-span continuous beam under cantilever stage which is in accord with the measured value, verifying the validity of the model,and calculates accumulate displacement in three years of bridge completed,and provide the theoretical basis for formwork layout.2. System conversion has little impact on the structure, and shrinkage and creep of concrete has greater impact, especially on vertical displacement by studying inflence of the structure system conversion and shrinkage and creep of concrete on the deflection and stress of the continuous box girders.3. The thesis analyze the factors that affect the stress test, and the testing data modified is in accord with the theoretical value.4. Sunshine temperature difference exerts great influence on the displacement and stess of the cantilever beam, and experimental and theoretical calculations show that, the longer the length of main girder, the greater the deformation caused by sunshine temperature difference, and the roof on the surface generate the large horizontal tensile stress and longitudinal compressive stress with the rising of temperature. So, the influence of temperature must be taken into consideration in construction control.And the paper introduces a method fot the rectification of elevation of framework erection. 5. The temperature difference hardly affect the linear after the bridge is built, but the long association of Long Multi-span Bridge which is caused by the change of the bulk temperature, is quite remarkable, the biggest reaches 16.8cm,so more attention should be paid to extendable device.6. The paper analyze that three different types of closure order affect internal force of multi-span continuous beam bridge,and we can get the optimum closure plan only from internal force.

Related Dissertations

  1. The Large Concrete Hydration Heat Temperature Effects Research of the Cable Stayed Bridge,U441.5
  2. A project supervision model of multi-project management company,F284
  3. Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
  4. Study on Deformation Control of Long-span Continuous Rigid Frame Bridge in Construction Stage,U448.23
  5. Large Span Prestressed Concrete Continuous Rigid Frame Bridge Analysis and Construction Control of Long-term Practice of Deflection,U448.23
  6. The Construction Control for PC Continuous Beam Bridge,U445.4
  7. The Analysis of Multi-span Prestressed Concrete Continuous Girder Bridge’s Reasonable Closure Sequence,U445.4
  8. Single Tower Cable-stayed Single Cable Plane Design, Construction and Construction Control Technology,U448.27
  9. Study on the Road Performance of Asphalt Rubber Gravel Seal Coat,U414
  10. Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
  11. The Construction Control Research on the Long-span Continuous Rigid Frame Bridge,U445.4
  12. Research on Shrinkage and Creep Effect for High-Pier & Long-Span Continuous Rigid-Frame Bridges,U441.5
  13. Research on Temperature Effects and Shrinkage-Creep Analysis for Long-span Continuous Rigid Frame Bridges,U441.5
  14. Construction and Control Technology on High Pier and Long Span Continuous Rigid Frame Bridges,U445.4
  15. Simulation Analysis of Prestressed Concrete Continuous Rigid Frame Bridge,U445.4
  16. The Study of Closure Technics and Construction Control Technology for Long Span Continuous Rigid-frame Bridge,U445.4
  17. The Application of the High Pier and Large Bay Series Rigid Frame Bridge in Kalman Filtering,U445.4
  18. V-shaped Piers of Continuous Rigid-Frame Bridge Static Analysis and Construction Control,U448.23
  19. Study on the Parameter of Construction Control of Long-Span Prestressed Concrete Continuous Rigid Frame Bridge,U448.23
  20. Parameter-Accuracy Analysis of Prestressed Concrete Continuous Rigid Frame Bridge,U445.4
  21. Construction Process Monitoring Methods and Practice on Cangxi Jialingjiang Super Major Prestressed Concrete Continuous Rigid Frame Bridge,U445.4

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology
© 2012 www.DissertationTopic.Net  Mobile