Dissertation > Excellent graduate degree dissertation topics show

Study on the Mix Proportion of High Performance Concrete of Prestressed Concrete Simply Supported Box Beam in the Project of High Speed Railway

Author: MaoYuanPing
Tutor: YanWeiHeng;FanXuShun
School: Chang'an University
Course: Architecture and Civil Engineering
Keywords: High speed railway High performance concrete Mix proportion Prestressed concrete simply supported box beam Construction methods
CLC: U444
Type: Master's thesis
Year: 2010
Downloads: 121
Quote: 1
Read: Download Dissertation

Abstract


The construction of high speed railway is spreading out in China. From the east to west, north to south, so many job sites are found all over the land. The construction of High speed railway is different from the ordinary railway, because the proportion of the bridge in the high speed railway is much higher than in the ordinary railway. And then, based on the 100 years service time, high performance concrete is widely used during the construction.In this article, during the construction of Haerbin to Dalian high speed railway, by optimization of mix proportion, the right one was found through the mix proportion test of prestressed concrete simply supported box beam. The mix proportion were considered with the affect of mixing pulverized fly ash only and mixing pulverized fly ash+slag powder, also consider the influence of different climate. In the test,52 mix proportions were designed considering the different proportion of pulverized fly ash and slag powder contains.468 group test cubes,1404 test cubes were tested during this experiment. And the high performance concrete properties of mechanic, elastic modulus, electricity resistivity, freezing and thawing resistance, penetration-resistant, cracking resistance were tested.In this article, different mix proportion were juxtaposed in the projects of Haerbin to Dalian high speed railway and the Beijing to Shanghai high speed railway, The differences of mix proportion were summarized because of the different climate. And the construction methods of high performance concrete were concluded in this paper.In the construction period of Haerbin to Dalian high speed railway,1399 beams are finished, the quality was ensured and the produce efficiency was high. Good economy and society benefits were got. This conformed the effectiveness of the mix proportion.

Related Dissertations

  1. Research on the Inteligent System of High Performance Concrete Mix Design in Zhujiang Triangle Area,TU528
  2. Research on the Revenue Distribution of PPP Mode about High-speed Railway Project,F283
  3. Monitioring of Mechanics Properties of Geogrid-Reinforced and Pile-Supported Embankment in Chaoshan Station,TU470
  4. The Development and Application of Spray Polyurea Elastormer Waterproof Material on High-speed Railway,TQ639
  5. Study on Spatial Development Patterns and Planning Countermeasures of "high-speed Railway New Town" Along Beijing-Guangzhou High-speed Railway,TU984.113
  6. Research on Anti-Cracking Performances of the Cement Stable Macadam Adding Admixture,U414
  7. Research on the Development Strategies of High-Speed Railway Station Region,TU984
  8. The Research of the Influence by the Materials of High-speed Railway Station Waiting Room on Sound Environment,TU112
  9. Study on the Construction Methods of Exterior Greening Wall in the Summer Hot Area,TU985.125
  10. Research on Jing-Hu High-speed Railway Landscape Environment Impact Assessment Based on GIS,X820.3
  11. High - speed railway bridges mitigation and isolation,U442.55
  12. The high-speed railway bridge performance - based seismic design method,U442.55
  13. Elastoplastic seismic response analysis of high - speed railway bridges,U441.3
  14. EPS Load Reduction Technology Application Research for High Fill Culvert,U449
  15. Analysis on the Stability of Surrounding Rocks and Its Safety Guarantee Measures in Qingdao Close Overlapping Underground Engineering,TU457
  16. The Design of 220kV Tianjin South Traction Substation for Beijing-Shanghai High-speed Railway,TM922.4
  17. 140m high-speed railway steel box tied arch bridge construction technology,U445.4
  18. The Research on Vehicle-Bridge Coupling and Vibration Response of High-speed Railway Curved Bridge,U441.3
  19. Comparison and Analysis on the Types of the High-Speed Railway Transition Curves and Vehicle Dynamic Behavior,U270.11
  20. RHEDA 2000 track in the form of ride comfort control method,U213.2
  21. Different types of high-speed railway in non-ballasted track under different loads and deformation of the force,U213.244

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge materials
© 2012 www.DissertationTopic.Net  Mobile