A Discussion on Small and Medium-sized Towns Grid Planning Considering the Assessment of Environmental Impact
Author: JinZhengJun
Tutor: HuangMinXiang;XuGuoJun
School: Zhejiang University
Course: Electrical Engineering
Keywords: Power System Planning Environmental Impact Assessment Comprehensive Evaluation Actual Power network Typical Grid
CLC: TM715
Type: Master's thesis
Year: 2012
Downloads: 121
Quote: 1
Read: Download Dissertation
Abstract
|
Network planning is an important part of the electricity the previous work, is the decisive factor in the level of power grid operation and economic and social benefits. Environmental impact assessment indicator system on the network planning study, consider the environmental impact of the whole life-cycle management background, the planning grid comprehensive evaluation system andthe mathematical model, and model recommended connection mode of distribution network planning for the future distribution network planning offers a typical plan.Distribution network planning, for example network planning theory and practicalmethods to consider the environmental impact assessment study and the small towns.Firstly, network planning environmental impact assessment theory and indicators tostudy the environmental impact assessment index system for the network planningstage. Network planning, identification of environmental impact, environmental impact assessment indicators system, and discusses the meaning of the evaluation,explain the application process of the index system should be noted that theproposed index system right Method of Determining.In this paper, consideration of environmental impact indicators for network planningcomprehensive evaluation of the utility grid system, refine the mathematical model ofnetwork planning based on life cycle management. The system considers thereliability, safety, environmental impact and economy, and each index can be solvedby commercial software, and thus to evaluate the results of versatility and authority.Full life-cycle assessment in the plan recommended the program to select theapplication to conduct a study to make a comprehensive analysis of medium voltage distribution network of a typical grid, and the recommended program.Consideration of environmental effects substation distribution planning theory andpractical methods based on grid comprehensive evaluation system of commence,propose a network planning sub-level, multi-objective optimization mathematical model, asked the planning process, to reduce the computation to planning efficiency and planning effects of the balance.The fifth chapter in a small town distribution network planning as an example a case study, to obtain good results.
|
Related Dissertations
- Municipal tourism land use planning environmental impact assessment,X820.3
- The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
- Comprehensive Quality Assessment of College Students,G645.5
- Study on the Quantified Model of Public Participation in Highway Environmental Impact Assessment,U41
- Research on the Human Health Damage Assessment Model of Building during the Life Cycle,R131
- Research on the Evaluation of Straw Resource and the Development of Scale-Up Straw Energy Utilization in Jiangsu Province,S38
- Construction project environmental impact assessment of public participation in the \,X820.3
- \,X820.3
- Study on Xinyang Agricultural College Talent-training Model,G642.0
- Prediction and Simulation of Air Quality of Coal Mining Area Based on VGIS System,X831
- Study on Circular Economy Assessment in Plan Environmental Impact Assessment of Coal-mining Area,F426.21
- Research on the Comprehensive Evaluation of TB Project of Social Security House,F293.3
- Study on the Mechanism of Public Participation in Environmental Impact Assessment System,X-01
- The Research on Reliability Model of HVDC Control and Protection System Boards and Reserve Strategy of Standby,TM721.1
- Model and Design for Teaching Evaluation System at Higher Institutions,TP391.6
- Assessment of Shenyang 2nd Ring Road Over-line Continuous Beam Bridge Safety Based on the Test,U447
- The Establishment and Application of Distribution Automation System Technical and Economic Evaluation System,F270.7
- Study of Public Participation in China’s Environmental Impact Assessment Issues,X820.3
- Environmental Impact Assessment Study on Information Disclosure,X820.3
- Study for Performance Evaluation on Industrial Energy Saving and Emission Reduction of Jiang Su Province,F427;F206
- Empirical Research on Industrial Technology Development Route of IOT in Jiangsu Province,F273.1
CLC: > Industrial Technology > Electrotechnical > Transmission and distribution engineering, power network and power system > Theory and Analysis > Power system planning