|
The world economy globalization pattern prompted the manufacturing enterprise need to undertake rapid and efficient production and management. And this one goal the realization, reflected in manufacturing enterprise’s information management level, but also reflects the enterprise comprehensive strength and market competitive level.With the enterprise division of labor and cooperation deepening, a single product manufacturing process of fine ability gradually improve, customer demand gradually present personalized, order forms of production more and more get the favor of enterprise and customers. In this context, the production of the enterprise management personnel of enterprise workshop production plan in management optimization seriously more, of enterprise logistics, cash flow, information flow and more attention. This paper based on the combination of JiangXi province energy and environmental Co., LTD production management system of research and development of subject, by building for ETO (Engineer To Order) type enterprise production plan model and processing workshop production in model and the algorithm of solving, and discusses the model of multi-objective question treatment method and countermeasures, and developed based on the APS production scheduling optimization design of the software system, in Order To improve the production of the enterprise management control of information level. This subject mainly from the following several aspects on:First, consider the situation to achieve a single goal. To the shortest processing time goals established for the optimization of the mathematical model of JSP; through the basic process of genetic algorithm (to determine the parameters set, parameter encoding, population initialization, evaluation groups, etc.) gives the Delphi programming language, and gives the problem instance and the optimal JSP 10 Gantt chart.Next, consider the production process more objective situation. As the complexity of multi-objective achieved, the paper give its definition, the goal is a vector objective function; then gives three ways to address the various sub-goals (linear weighted sum method, the ideal point method, the weighted and squared method); the ultimate multi-objective fuzzy optimal design given the general steps and examples. Common situation is considering two factors:one is the shortest processing; the other is a cost to a minimum.Finally, according to the software engineering requirements, developed based on the theoretical models of production planning schedule information management system, in order to achieve production, management, monitoring the trinity, the enterprises to improve the manufacturing enterprise’s information management level, save manufacturing cost and enhance competitiveness.In addition, this paper improves efficiency, increase the response and the APS interim accident theory building to be improved.
|