Dissertation > Excellent graduate degree dissertation topics show

Thin sections of concrete arch bridge opening pan Construction Control Technology

Author: ZhongWei
Tutor: TianZhongChu
School: Changsha University of Science and Technology
Course: Bridge and Tunnel Engineering
Keywords: Rotating Construction Thin Open Concrete Arch Bridge Construction Monitoring Calculating the center of gravity Elastic support law
CLC: U445.4
Type: Master's thesis
Year: 2010
Downloads: 40
Quote: 3
Read: Download Dissertation

Abstract


Thin -section arch openings swivel construction is a new construction technology, swivel technical difficulty, construction risk and bridge span and semi- span rotating weight system has significant relationships , in addition to careful design, construction , the rational comprehensive monitoring and control system is an important guarantee for the smooth implementation of twist . Meanwhile analysis of such processes swivel construction technology research to better promote the development and improvement. In this paper, Huajiang bridge engineering background , based on construction monitoring critical stage of calculation and analysis and judgment , according to the calculation results of the analysis guide the construction site monitoring, through on-site monitoring, provides a number of effective and accurate data for the same type of bridge construction control provide a favorable reference. The main contents are as follows: ( 1 ) open thin-walled sections under construction characteristics described arch bridge construction process , combined with engineering examples of the bridge monitoring is important and difficult content analyzed. ( 2 ) According to swing bridges, design principles, the focus of this paper structure calculations of the \center of gravity and the center of rotation system basic adjustment in place. ( 3 ) the use of MIDAS and ANSYS were static analysis of the bridge and stability analysis . Twist off the shelf stage tensioned structure analyzes cable force calculation method , and get their cable force value ; well arch , the back wall of the force , deformation , the main factors and the local stress on the turntable were analyzed and studied the dynamic effects of stress on the characteristics of the arch and arch off the shelf stability of phases for the site construction provides a favorable theoretical guidance . ( 4 ) under the guidance of the theoretical calculations , cable tension and condition of each arch , a key section of the back wall, and other stress , linear focused monitoring , the measured data analysis showed that the swivel process smooth , measured , theoretical linear deviation is small, critical section stress distribution is reasonable , and thus show that the river bridge on the flower used in monitoring method is reasonable and scientific.

Related Dissertations

  1. The Construction Monitoring and Deformation Control and Analysis of the Box Culvert Jacking of the YouQuan Road Through the Hukun Railway,U449.5
  2. High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
  3. The Construction Control for PC Continuous Beam Bridge,U445.4
  4. Concrete-filled Steel Tubular Basket-handling Arch Bridge Vertical Swivel Construction Control Simulation Analysis,U445.465
  5. A Technique Research on Maintaining the Foundationpit of the Large Passenger Railway Station,U231.3
  6. Numerical Simulation and Deformation Control of Deep Foundation Pit Support of the Experimental Building in Northeastern University at Qinhuangdao,TU753
  7. Research on Application of Two Different Lengths of PVDs in Vacuum Preloading Method,TU472.33
  8. Construction Monitoring and Control of Tied-arch Bridge with Flying Swallow,U448.225
  9. Research on Monitor and Analysis of Inclined Settlement Integral Jack-Up Rectification for Xiang King’s Ancien Wall,TU746.3
  10. Analysis of Structure Simulation for Long-span Prestressed Concrete Continuous Rigid-frame Bridge,U448.23
  11. Study and Practice on Monitoring Technology of Cantilever Construction for the Songhuajiang Continuous Box Girder Bridge,U445.466
  12. Bin Shan concrete arch bridge detection and finite element analysis,U446
  13. Research of Construction Monitoring Technology of Basket-type Concrete Filled Steel Tube Arch Bridge,U445.4
  14. The Construction Monitoring and Controlling Cable-stayed Bridge with Inclined and Arched Tower,U448.27
  15. Study on Deep Metro Foundation Pit Construction Monitoring and Deformation of Nearby Road,U231.3
  16. The Alignment and Elevation Control of Long Span Continuous Rigid Frame Bridge,U445.4
  17. Construction Control Research of Steel Truss Stiffening Girder of Suspension Bridge,U448.25
  18. Support Theory and Application of Pressure-Dispersed Anchor Cantilever Retaining Wall,U417.11
  19. Construction Control of Span Continuous Rigid-Frame Bridge and Error Analysis,U445.4
  20. The Analysis of Calculation Theories and Principle of Construction Control for Concrete-Filled Steel Tube Arch Bridge,U448.22
  21. Analysis on Dynamic Characteristics and Sesimic Response of Special-Shape Concrete Filled Steel Tube Arch Bridge,U441.3

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology