Dissertation > Excellent graduate degree dissertation topics show

The Choice of Quota Field Determination and the Research of Data Difference for Highway Engineering

Author: QiaoPeng
Tutor: WangShouXu
School: Changsha University of Science and Technology
Course: Management Science and Engineering
Keywords: Enterprise quota
CLC: F426.92;F224
Type: Master's thesis
Year: 2010
Downloads: 64
Quote: 8
Read: Download Dissertation

Abstract


Related Dissertations

  1. Study on Fast Quoted Price Method under Mode of Bill Quantity Valuation,F284
  2. Pingxiang Hongyuan Coal Chemical Co., Ltd. performance appraisal and compensation management,F426.72
  3. Study on the Whole Process Cost Management System of International Project Based on BQ,F284
  4. The Comparison and Analysis between Domestic and Overseas Engineering Cost Model,TU723.3
  5. The Research on Biding m Under the Mode of Bill Quantity Valuation,F284
  6. The Study of Countermeasures to the Mode Reform of Valuation with Bill of Quantities in Subcontractor’s View Point in Our Country,F426.9
  7. Research on Construction Project Investment Control Methodology Based on the Mode of BQ,F224
  8. Several Problems on Mode of List of Quantities Pricing as Studying Topic,F284
  9. The Construction Cost Research on Bill of Quantities-based Valuation Norms,F284
  10. The Study on Organizing of Enterprise Norm of Building Construction,F284
  11. Base on Grey Fuzzy System Theory Study on the Organization of Enterprise Quota Database of Construction Enterprises,F224
  12. Shortcut Method Research on Establish Machine Expending Quota of Construction Corporation,F284
  13. Monte Carlo simulation technology in the enterprise fixed making,F284
  14. Grey System Theory Based on Companies Bidding to Determine the Unit Price of Production Factors,F284
  15. Study on Construction Supply Chain Management System and Performance Evaluation Method,F426.92;F224
  16. Wuhan Construction Engineering Group Development Strategy,F426.92;F224
  17. Construction Quality Insurance Operational Mechanism,F426.92;F224
  18. Construction contracts management performance evaluation study,F426.92;F224
  19. Empirical Research on the Key-employee Satisfaction in Construction Enterprises,F426.92;F224
  20. Study of the Design for Salary System of Contruction Enterprise Managers,F426.92;F224

CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net  Mobile