The Large-scale Reformation of 220KV Substation in Jinan Shandong Grid
Author: YuGuangYuan
Tutor: ZuoNengLing;JiaKai
School: Shanghai Jiaotong University
Course: Electrical Engineering
Keywords: High voltage substation Main electrical connection Reform in the original space Temporary power supply Transformer lines directly connect with the transformer Large-scale technology reform
CLC: TM732
Type: Master's thesis
Year: 2011
Downloads: 47
Quote: 1
Read: Download Dissertation
Abstract
|
The high voltage power grid change rapidly,but with the development of transmission and transformer lines and the grid capacity expanding,most of the substations which were builded in the second half of the twentieth Century could not meet the demand of the grid.These substations are very important in the high voltage power grid,on the other hand,these substation is located in downtown lots,land resources increasingly scarced.So it is impossible to rebuild the substation in the new place and refom all the transformer lines. From the statistical data,small-scale equipment renovation project significant increase in these substaitons,but it can not solve the problems we have met in the substations,such as insufficient of the grid capacity ,the spare transformer lines and the aging equipment.So large numbers of large-scale reformation of the substations emerge.If we want to improve the reliability and security of the power grid,we must ensure Safety and successful of large-scale renovation project when the substations are in use. Because there exist differences between each substations,so each reformation of substations have their own characteristics.Through the study of the reformation project of Jinan power grid and date summary,put forward ues the land which is in the original space or to buy small-scale land,use the indoor GIS devices,combine the general design of the power grid,change the main electrical connection(Temporary power supply or transformer lines directly connect with the transformer ),complete the reformation of the substations gradually.Thus provided Systematic technical guidance for improving the capacity and the reliability of the device , increasing the spare transformer lines,removing the high-type aging device.
|
Related Dissertations
- Researching on Some Problems of Underground Substation Designing in Great City,TM63
- Study on the EMC Problems and Application in the Secondary System of High Voltage Substation,TN03
- Dandong Border Economic Development Zone, the second 66KV substation design,TM63
- Research on Power System Static Security Risk Assessment Method,TM732
- The Research of FACTS’ Devices Impact on the Long-term Reliability of Power System,TM732
- Research on Distribution Service Restoration Considering DGs,TM732
- Power System Reliability original parameter selection and prediction,TM732
- When isolated turbine dynamics and control strategy,TM732
- Investigation of Network Reconfiguration Sequence for Power System Black-Start Restoration,TM732
- The Fault Restoration of Distribution Network Based on Improved Niche Genetic Algorithm,TM732
- Reliability Evaluation of Distribution Network Based on Equivalent Network,TM732
- Foshan power plants and protection with automatic splitting of the problem,TM732
- Substation equipment condition-based maintenance strategy and applied research,TM732
- Grid system islanding detection method,TM732
- Analysis of Reliability and Improvement of the DC Operation Power Supply System in JinWan Power Plant,TM732
- Research on Economic and Reliability of the Operation of High-voltage Power Grid of Coal Mine,TM732
- Research on Undervoltage Load Shedding for Regional Isolated Grid,TM732
- The northern region of Ningxia power grid analysis,TM732
- Distribution System Reliability Evaluation and Optimization Research of Switch,TM732
- Zhangjiagang City with optimal allocation of network switch,TM732
- Distribution System Reliability Assessment and Optimization,TM732
- Study for the Effect of Distributed Generators on Distribution Systems,TM732
CLC: > Industrial Technology > Electrotechnical > Transmission and distribution engineering, power network and power system > Power system scheduling, management, communication > The operation of the power system
© 2012 www.DissertationTopic.Net Mobile
|