BOQ bidding strategy under cost analysis and research

Author: ChenZuo
Tutor: LiYing
School: West China University
Course: Structural Engineering
Keywords: Bill of Quantities Bidding Strategy Corporate profits BP neural network Basic profit forecast model
CLC: F284
Type: Master's thesis
Year: 2011
Downloads: 291
Quote: 3
Read: Download Dissertation

Abstract


With the increasing globalization of the construction industry and information technology, China's construction enterprises increasingly fierce competition, this competition is mainly manifested in bidding activities. Bill of Quantities mode is intended bidding fair and open competition, and reflect the corporate cost and the average cost of individual differences. If construction enterprises in the tender offer by ignoring their level of productivity, not thorough analysis and a good grasp of corporate profits, can not make appropriate and reasonable bidding strategy, competitive bidding will face many risks, and even cause bid failed. Construction enterprises to participate in the competition, to adapt to competition and eventually become the winner, this article from the perspective of the construction business, consider bidding market situation and the current bid construction enterprises are facing the problem, a profound analysis of the competitive environment and construction companies profit margins, proposed bidding strategy is the solution \Under the current bill of quantities mode with the construction enterprise status, elaborate conventional and emerging various bidding strategies, in-depth analysis and research decisions and bidding tender offer these two factors impact on bidding strategies, especially in the tender Quote regard, noting that corporate profits are bidding strategy's core, further proposed construction companies on corporate profits high, medium and low levels of expectations, by reflecting the level of productivity of construction enterprises to grasp the basic analysis of profit margins, thereby optimizing bidding strategy . Based on BP neural network using MATLAB neural network toolbox to establish tender offer basic margin prediction model by BP neural network training samples can effectively solve the tender offer in a number of factors. More accurately predict results not only reflect the profit margins of the tender offer, also more truly reflect the level of personal productivity. Using the basic profit forecast model provides objective and accurate analysis of the data, combined with expected profits, optimize and adjust bidding strategy, not only to make up the traditional bidding strategies of some defects, and optimized bidding strategy has a better rationality, scientific relevance. This paper established a tender offer basic margin forecast model and proposed construction companies bidding strategy optimization method, in the current construction project bidding situation of intense competition, not only for construction companies bidding has practical significance, and will to some extent improving competitiveness and productivity of the tender management level.

Related Dissertations

  1. Research on Feature Extraction and Classification of Tongue Shape and Tooth-Marked Tongue in TCM Tongue Diagnosis,TP391.41
  2. Municipal tourism land use planning environmental impact assessment,X820.3
  3. Study on Taste Characteristic of Taste Peptide Enzymatic Production from Oyster Base on A Neural Network Method,TS254.4
  4. Optimization Study on Gating System and Molding Process Parameters of Injection Mold Based on Simulation,TQ320.662
  5. Analysis on Water Ecological Carrying Capacity of Jiangxi Province,TV213.4
  6. In-furnace Temperature Information Included Combustion Optimization of a Utility Boiler,TK227.1
  7. Study on Safety Comprehensive Assessment of Hydro-Power Construction Sites,TV513
  8. BOQ pricing model in financial investment assessment application,TU723.3
  9. Investigation of the Stress-Strain Behavior of Hot-compression Mg-Li Alloy,TG146.22
  10. Research of De-noise and Pattern-recognition in Partial Discharge Detection System,TP391.41
  11. Bq in Qingyun # 6 Building Project Application Research,F284
  12. The Comparative Study on the Mode of Cost Management of Construction Project,F284
  13. Study of the Bill-of-quantity Model,F284
  14. Research on Prediction Model of Construction Cost Based on FPR-ANN,F224
  15. Research on Supplier Selection and Evaluation Based on BP Neural Network and Cooperative Game,F274
  16. Research on Visual Servo System of Mechanical ARM,TP242.6
  17. Study on Application of Xinxue River Construction Wetland for Pollutant and Water Quality Prediction,X703
  18. Research on Demand Forecasting Model of ARIMA-BP Neural Network Based on CPFR,F274
  19. Study on the Rural Financial Operating Risk Early Warning Model Based on BP Neural Network,F224
  20. Model Construction and Empirical Study on Credit Risk Evaluation in Chinese Companies,F279.2
  21. Application of Wavelet Network in Economic Prediction,F201

CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net  Mobile