Dissertation > Excellent graduate degree dissertation topics show
Research on the Blasting Shock Absorption Technology in Shallow-Buried Tunnel under-traversing the Dense Residences
Author: MengXiaoWei
Tutor: HuangMingLi
School: Beijing Jiaotong University
Course: Bridge and Tunnel Engineering
Keywords: Shallowly-buried tunnel Shock absorption Digital detonator Dense residences Wavelet analysis
CLC: U455.6
Type: Master's thesis
Year: 2011
Downloads: 217
Quote: 1
Read: Download Dissertation
Abstract
|
With the development of China’s railway transportation system, an increasing number of shallow tunnels traversing the city areas will be built. As a major city tunnel construction method, drilling-and-blasting method will inevitably generate seismic effect, which affects the project efficiency and threatens the safety of surrounding buildings. How to reduce the blasting damage and blasting vibration as well as how to properly handle the conflict between the engineering efficiency and the blasting-vibration control has become one of the key issues in the city tunnel blasting. This paper puts Chang-Hongling tunnel under-traversing JiangChi town as the project background.According to the dense residences, the complex structure, the low blasting seismic level, and the strict blasting control standard, we successively got the blasting shock absorption technology of the digital detonator by the comparative tests between ordinary detonator and digital detonator. We also guarantee the tunnel to pass through Jiangchi Town safely and fast by adopting the blasting excavation with a large number of the digital detonator. Based on a lot of blasting vibration monitoring and test data, it researches spectrum characteristics and wave attenuation of blasting seismic by numerical simulation, and wavelet transformation technique. The main results obtained from the paper are as follows:1) Ordinary detonator blasting shock tests and analysis①Based on the ordinary detonators blasting shock tests, we found that:the efficiency of full-face blasting is the highest, but the shock is the biggest; the shock in "non-explosive excavation in abdominal pilot hole+controlled blasting excavation in subsequent expansion section" is the lowest, and the efficiency is higher; the efficiency of "on-blasting excavation in the up-steps+down-steps controlled blasting" is the lowest, and the shock is bigger;②In engineering practice, adopting four degree compound wedging cut in slotted section can reduce the amount of each explosives and vibration of blasting can be reduced obviously by 20%~30%.2) Digital Detonators blasting shock tests and numerical simulation①Compared with the ordinary millisecond detonator blasting, blasting vibration caused by the digital detonators can be reduced by 50%-60%,and the perforation efficiency can reach 98%; ②By numerical simulation we found the variation of the surface vibration velocity and displacement. In the velocity field, the vibration velocity of the hollow area is the maximum,the free face is the second, the minimum is the unexcavated area; In displacement field, the vertical displacement of the area over the free face is the maximum, and the unexcavated area ahead of the tunnel face is the maximum in horizontal displacement;②By the number of Digital Detonators comparison tests and numerical simulation, it can be found that:When the total delay time is set at 700ms, short-delay blasting time is set at 3~4ms, the damping effect is the best. 3) Blasting shock wave analysis and propagation of wave①Through the blast vibration filed test and regression analysis on the field data, we get the vertical velocity attenuation law:V=116.8(Q1/3/R)1.59;the level velocity attenuation law:V=100.8(Q1/3/R)1.75; the radial velocity attenuation law:V=94.23(g1/3/R)1.67;②Frequency spectrum and energy of blasting seismic are analyzed to gain the conclusions:In the blasting test, with the increase of the explosives in maximum segment, blasting vibration bandwidth energy increases, and vibration bandwidth will move to the low-frequency vibration band; With the increase in the total amount of explosives, the energy’s peak value in blasting vibration signal increases obviously; In the dissemination process, the vibration intensity attenuates is decrease, while the Frequency band is widen, the proportion of total low-frequency signal increases.
|
Related Dissertations
- Acoustic Emission Detection Technology in Applications of Synthetic Diamond Research,TQ164
- Development of high-resolution gamma-ray logging tool,TE927
- Research on Testing and Analyzing Technology for Time Parameter of Aerospace Relay,TM58
- Realization of Rolling Bearing Diagnosis System,TH165.3
- Design of Transient Signal Wavelet Analysis System and Study on Fault Line Selection of Resonant Grounded System,TM862
- Research on Tool Condition Recognition Based on Acoustic Emission in Milling,TG54
- Design and Development on Virtual Experiment Platform Based on Labwindows/CVI,TP274
- Research on Fault Diagnosis of Rolling Bearing Based on Multi-Sensor Information Fusion,TH165.3
- Application of Wavelet Analysis on Fault Diagnosis of Hermetic Refrigerating Compressor,TH165.3
- The Research and Development of RAIL Digital Ultrasonic Flaw Detector,TH878.2
- Bao-steel Electrical Furnace Factory Bloom Continuous Caster Ladle Slag Detection System,TF341.6
- Research on the Inspection and the Application of GPS Kenimatic Surveying Technology in the Project of FAST,P228.4
- Wavelet analysis and catastrophe theory in deformation analysis,P258
- The Application of Multivariate Analysis and Excitation-Emission Matrix Fluorescence Spectroscopy of Dissolved Organic Matter in the Identification of Red Tide Algae,X55
- DSP FPGA -based near-infrared detector key technology research,TN791
- Analog Circuit Fault Diagnosis Method and Its Application,TN710
- Leakage and arc fault protection circuit breaker research,TM561
- Design and Research on Attitude and Heading Reference System Based on MEMS Inertial Sensor,V241.5
- Short-Term Traffic Flow Forecasting Methods Based on Combination Model,U491.14
- Software Simulation Platform and Fault Diagnosis Method for an Underwater Equipment System,U676.42
- The Design and Development of System Based on Mid-and-long Term Runoff Forecasting at the Three Gorges,P338
CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Drilling, blasting