Dissertation > Excellent graduate degree dissertation topics show
The Simulation Analyisis and Control Research of the Hu Lu Shan Wan Crossing Sea Bridge Construction
Author: YingMing
Tutor: ZhengYiFeng
School: Jilin University
Course: Bridge and Tunnel Engineering
Keywords: Arch bridge Construction Control Finite Element Analysis Construction force of Cable force measurement
CLC: U445.4
Type: Master's thesis
Year: 2011
Downloads: 40
Quote: 0
Read: Download Dissertation
Abstract
|
The birds - Deck Arch Bridge complex construction technology , construction simulation and construction control study days increasingly important . More about the birds of Concrete Filled Steel Tube Arch Bridge in single arch steel box as a load-bearing member , in-depth study on the issues of the arch rib stability , construction Suspenders Tension identify and parameter identification and prediction and promote the application of relatively small. In this paper, Dr. bridges plane finite element model of the bridge structure , analysis of the entire construction process . Structure in each construction stage under stress , deformation for review. MIDAS structure space finite element model of synchronous review . Determined by comparing a variety into the theories and methods of bridge suspender force , and ultimately rigid support continuous beam method to determine the boom into the bridge cable force ; combined with the actual construction of the bridge site , optimize the boom installation , tensioning program , election, the impact matrix method to determine the boom construction and installation of cable force ; review measurement frequency method for the determination of the the suspender force at the same time at a specified the installed boom the feedthrough pressure sensor , based on the principle of vibrating string , Hanger Force ; based on the principle of the method of least squares parameter identification, parameter sensitivity analysis and parameter deviation correction . Comprehensive plane finite element model and space finite element model calculation results and actual site construction conditions , to determine the boom installation , tensioning program ; strict accordance with the boom construction instructions , the entire boom installation, cable force tensioning process monitoring , and the main girder and arch rib strain and displacement of the control section to be monitored. Main girder and arch rib bridge alignment meet the design requirements , to achieve a comprehensive and effective construction monitoring , in order to ensure the safety of the Arch Bridge , and a large number of valuable theoretical data and measured data , provided favorable conditions for the depth of analysis and research , similar bridge construction control study has reference value.
|
Related Dissertations
- Research on the Mainframe System of Powder Mixed EDM and the Craft Experiment,TG661
- EDM Electrode Wear Mechanism and Control Research,TG661
- Finite Element Analysis and Structure Optimal Design for Combined Seal at Normal Temperature and Low Temperature,TH136
- Study on the Design and Biomechanical Behaviors of Individualized Artificial Knee Joint,R318.1
- Design of Testing Equipment for Electronic Products,TN06
- Multi-pin Internal Fixation of Calcaneal Fractures in Finite Element Analysis,R687.3
- Airborne radar antenna pedestal rapid design systems research and development,TN959.73
- Sham hose drum drive means and hydraulic system of the structure,TE973
- The magnetorheological damper mechanical properties and Gun Recoil,TB535.1
- Nonlinear Structural Dynamics Analysis and Optimization Design on Naval Gun Driver,TJ391
- Design and Analysis of Automatic Steel Pipes Butt Tool,U673.38
- Analysis on Unloading of Large Span Steel Structures and Research on Its Mechanical Analysis,TU391
- Simulation of the Clinching Process Using FEA Method with Steel and Aluminum Alloy Sheets for Automotive Sunroof Frame,U463.83
- M1 of CRH2-300 Train Finite Element Analysis and Travelling Comfort,U266
- The Design of Telescopic Asphalt Spraying System,U415.524
- Development of Post-process System in Sheet Metal Simulation Based on SolidWorks,TP391.72
- Failure Analysis and Structural Optimization of the Typical Fine Blanking Punch,TG385.2
- The Structure Design of 2000kN Servo Press for Hot Forming,TG385
- Al Wire Bonding Failure and Automatic Optical Inspection on Power Device Leadframe,TG441
- Optimal Design of Suspender Replacement in Concrete Filled Steel Tubulur Arch Bridge,U448.22
- Simulation Analysis and Experimental Study on Hysteretic Behavior of High-performance Shear Panel Damper,TU352.1
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology