Dissertation > Excellent graduate degree dissertation topics show
The Impact to Bridge Pile Foundation from Drilling and Blasting in Metro
Author: YaoHu
Tutor: ChenWenHua
School: Beijing Jiaotong University
Course: Bridge and Tunnel Engineering
Keywords: Loose circle Drilling and blasting method Bridge Pile Foundation Chongqing subway VI line
CLC: U443.15
Type: Master's thesis
Year: 2011
Downloads: 45
Quote: 0
Read: Download Dissertation
Abstract
|
Railway and subway career in the rapid development of our country, and through the hard rock geology is often encountered in the process of the construction of the railway and subway compared to the tunnel boring machine, drilling and blasting method due to geological conditions adaptability open digging low cost. Therefore particularly suitable for hard rock tunnel, crushing rock tunnel boring and short tunnel. Increasingly dense urban roads, bridges, buildings, increasing the probability of the subway beneath the bridge, Chongqing subway on the 6th line wear Wong Nai Pang Interchange for example, focuses on the drilling and blasting method subway beneath the bridge piles based technical analysis. Drilling and blasting method in the construction process, how to reduce the disturbance to the surrounding rock is a key technology, in this article from the point of view of the loose circle to study the construction of the drilling and blasting method of surrounding rock disturbing effect. The loose circle from the causes can be divided into two parts: the the cavern size effect loose circle and blasting dynamic pressure loose circle. Firstly summarized summarizes the existing loose circle theory of the generation age of the various theories and theoretical points, the advantages and disadvantages of the various theories, and then focus on the formation mechanism of the loose circle with a clearer understanding also provides a better mechanical model elastoplastic mechanical method, use this method to derive the range of the loose circle of size effects in ideal natural rock mass in a circular cavern, and discuss the main factors influencing the loose circle. Experimental study on combination of of blasting dynamic pressure loose circle, as well as some of the construction site of the measured data on the basis of this article blasting explosives in the study rocks mechanism summarizes the construction of the drilling and blasting method to cause the law of the expansion of loose circle, given the pressure loose Blasting the approximate ratio of the loose circle of the ring and the size effect. Combined with a risk point of the Chongqing Metro Line 6, the dynamic pressure corrected by theoretical formula and blasting, a loose circle the size of calculated there, at the the tunnel top of the bridge pile foundation exists when rock stress and analytical methods for solving . Using the finite element method to simulate the construction process, focusing on the development of law and the scope of analysis of a tunnel beneath the bridge pile foundation loose circle, including single-hole excavation, both left hole the right tunnel excavation as well as dual-hole at the same time open dug plastic circle developments in these three cases. While the top of the rock mass stress redistribution and settlement of the internal forces of change as well as the bridge pile.
|
Related Dissertations
- The Blast Working of Xiamen Subsea Tunnel and the Research about the Influence Effect on Surrounding Rock,U455.6
- Study on Vibration Response of High-rise Buildings Cased by the Drilling and Blasting in Chongqing Metro,TU311.3
- Study on the Scheme Comparison of Ningbo Xiangshan Harbour Tunnel,U459.5
- Techno-economic Comparative Analysis of TBM Method and Drilling and Blasting Method,U455.6
- The Research on Dust Prevention and Control in the Tunnel Construction with Drilling and Blasting Method,X513
- Application of TBM Technology in Water Conveyance Tunnel Project,TV554
- Study on Disturbance Range in Soft Rock with Drill Blasting Technology Tunnel,U455.6
- Ji Shi Hongyan Tunnel Construction Technology Research and Application,TV554
- Engineering Safety Risk Analysis and Control of Subsea Tunnel Constructed by Drill and Blast Method,U459.5
- Study on Enclosing Rock of Deep Tunnel Well Destruction Character under Blasting Shock Effect,TD235
- Deep Shaft Connecting Chamber Rock Dynamic Response and Its Supporting Technology Research,TD354
- The Key Technologies in the Huge Underground Powerhouse of BLH Pumped-storage Hydroelectric,TV554
- Research and Application on Surrounding Rock Control Technology in Many Uphill Roadway of Thick Coal in Deep Mines,TD353
- Highway tunnel lining structure design method of single-,U451.4
- The Study on the Treatment of the Karst Caves under the Zhanghe Continuous Girder Bridge of Lingyun Road,U445.551
- The Technology Research on Bolt-spray Support in Two-roadway of Fully Mechanized Coal Face in PuHe Coal Mine,TD353
- Research of Bridge Pile Foundation Loading Characteristic Analogue Test Method,U443.15
- The Deformation Mechanism Analysis and Harnessing Method of Soft Laneway in Gaojialiang Coal Mine,TD353
- Computer Aided Design and Analysis System on Pile Foundation of Bridge,U443.1
- Study on Simplified Models of Bridge Pile-foundation Subjected to Earthquake,U443.15
CLC: > Transportation > Road transport > Bridges and Culverts > Bridges constructed > Bridge Foundation > Pile
© 2012 www.DissertationTopic.Net Mobile
|