Dissertation > Excellent graduate degree dissertation topics show
Construction Control During the Hauling Construction of Large Tonnage Curved Concrete Box Girder
Author: WangJiLi
Tutor: PanShengShan;HuangCaiLiang
School: Dalian University of Technology
Course: Bridge and Tunnel Engineering
Keywords: Construction control
CLC: U445.4
Type: Master's thesis
Year: 2011
Downloads: 40
Quote: 0
Read: Download Dissertation
Abstract
Related Dissertations
- Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
- The Key Techniques for the Construction of Jinan Yellow River Bridge on Qingdao-Yinchuan Highway,U445.4
- Co Jiang Changjiang a bridge construction control calculation and control measures of,U445.4
- The Application of BP Neural Network in Cable Replacement of Cable-Stayed Bridge,U448.27
- Tribute River Bridge Precamber uncertainty analysis and control,U445.4
- Research on Construction Control Technology of High-speed Railway Skew Continuous Beam Bridge,U445.466
- - Span continuous rigid frame bridge construction monitoring and Stability,U445.4
- Grey System Theory and Its Application in Construction Control of the Single Tower Cable-stayed Bridge,U448.27
- The Simulation Analyisis and Control Research of the Hu Lu Shan Wan Crossing Sea Bridge Construction,U445.4
- Cable-strut tensile structures geometric error effect analysis and control,TU399
- Hybrid girder span cable-stayed bridge construction control accuracy of,U448.27
- Hybrid girder cable-stayed span unstressed conformation Applied Research,U448.27
- Span continuous rigid frame bridge static simulation and design parameters impact analysis,U448.23
- V-shaped prestressed concrete continuous rigid frame bridge pier construction sub- state estimates and engineering controls,U445.4
- Large span prestressed concrete continuous beam bridge construction monitoring and structural simulation analysis,U445.4
- Large Span Continuous Rigid Frame Bridge construction monitoring and simulation analysis,U445.4
- Construction Control Study on Cables Replacement Project of Concrete Cable-stayed Bridge,U445.4
- Research of Daye Lingxiang Spirit Township Iron Ore Melting Agent Project’s Field Area Side Slope Reinforcement Earth Retaining Wall Stability Analyses and Construction Controls,TU476.4
- Multi-objective Construction Control System for Long-span Prestressed Concrete Box Girder Bridge,U445.4
- Study on the Construction Control of Foshan Jiujiang Composite Cable-stayed Bridge,U448.27
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology
© 2012 www.DissertationTopic.Net Mobile
|