Dissertation > Excellent graduate degree dissertation topics show
Hai Jing 20,000 tons of caustic soda project schedule management applied research
Author: SunFuXian
Tutor: JiaoShuangJian
School: Ocean University of China
Course: Project Management
Keywords: Schedule management Construction progress Dynamic management
CLC: F426.71
Type: Master's thesis
Year: 2010
Downloads: 13
Quote: 0
Read: Download Dissertation
Abstract
Related Dissertations
- XA city administrative center of e-government network construction project schedule management,D630
- Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2
- Whole Process Dynamic Management Research about Strategic Asset of Enterprise,F224
- Applied Research of Critical Chain Management in D Company’s Nuclear Power Equipments Manufacture Project Scheduling Management,F426.61;F224
- Design and Implementation of a unit of military vehicle dynamic management and monitoring system,TP311.52
- A Research on the Schedule Management of X Nuclear Power Project,F426.23;F426.61
- Project Management in Asian communication support of applied research,F626
- Dongfeng Fengshen H30 Cross models project scope and schedule management research,F426.471
- Power line reconstruction project cost and schedule management,F426.61
- Real Estate Development Project Communications Management System Construction,F293.3
- Research and Design of the Gateway Configuration Management Based on TR-069,TP393.05
- Domestic IDC analysis of the construction project schedule management,F49
- Heavy ship disposal of assets in the auction method of assessment,F724.59
- Hanggang equipment overhaul years Project Management,TF758
- Research on the Project Schedule Management Based on the Critical Chain,TH186
- A Study on the Legal Problems about Managing the Aliens in China,D922.1
- Research on Project Schedule Management System Based on Critical Chain for Software Cooperative Development,TP311.52
- Project management in the telecommunications network construction engineering and research,F626
- The Research on Progress Management of SAIC Roewe 350 Alternator R&D Project,F426.471
- Development Process Management of Virtual Reality Project Based on VRGIS Platform,P208
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|