Internal Force and Linear Analysis in the Process of Tiedarch Bridge Construction

Author: XueLiJian
Tutor: WangRongHui
School: South China University of Technology
Course: Bridge and Tunnel Engineering
Keywords: tied arch bridge construction monitoring linear analysis stress analysis the bar force analysis
CLC: U448.225
Type: Master's thesis
Year: 2011
Downloads: 36
Quote: 0
Read: Download Dissertation

Abstract


Tied arch bridge is a kind of arch bridge with a special form, which combines the characteristics of both arch bridge and beam bridge. It has an advantage of high strength, reasonable bearing carrier, saving in materials, multiple construction methods, attractive appearance and so on when compared with the common arch bridge and beam bridge, as a result, the tied arch bridge is an extremely competitive bridge structure. In the aspect of the research on the supervisory construction methods of the bridge construction, the Japanese engineers firstly put forward the adoption of the optimal control idea from the“least square method”. In China, Lin Yuanpei also brought forward the adoption of the accidental optimal-control-method of Kalamn filtering, the gray theory, the fuzzy theory and other control methods. So far, the“least square method”and the Kalamn filtering method have been widely adopted in China.This paper is set on the background of a huge tied arch bridge, which is named BaiSha River Bridge, and it is a part of Subway Line No.6 in GuangZhou. This paper analyzes the key problems came up in the process of supervising the construction of this Bridge. The main points of this paper are as follows:(1)According to the content and basic theory of the construction control of the tied arch bridge, this paper describes the main content of the construction supervision of the BaiSha River Bridge in details, and conducts a profound research on the theory of construction supervision.(2)This paper starts from the classification of arch bridge booms, and then analyzes 5 methods of the cable tension detection of the booms, again it describes the basic theory of frequency measurement, then sums up the procedures of measurement of cable tension by the method of vibration frequency and the influencing factors of the identification of the boom’s internal force, finally this paper summarizes the boom’s cable tension detection of the bridge.(3)Bridge’s stress and strain monitoring plays a significant role in the construction and management of the bridge. Stress monitoring are mainly conducted through the method of strain measurement and then transforming into stress by mathematical approach. Among all the stress and strain observation sensors, vibration wire strain sensor is the most widely used. (4)Among all the construction supervision items of the concrete filled steel tube bridges, alignment monitoring is the most important, because compared with internal force control, alignment monitoring belongs to macro control, and its variation is the general performance of the bridge structure. Through arranging high-accuracy monitoring and control net, this paper carefully conducts arch axis observation and orientation, monitoring of bridge floor elevation, bridge middle-line control, abutment and bridge pier construction supervision, and pier shaft deformation and subside observation.

Related Dissertations

  1. The Construction Monitoring and Deformation Control and Analysis of the Box Culvert Jacking of the YouQuan Road Through the Hukun Railway,U449.5
  2. Large opening pressure vessel structural finite element analysis and strength design,TH49
  3. Painting robot design and control method of writing,TP242.3
  4. Tube heat exchanger thermal and stress analysis,TQ051.5
  5. Analysis and optimization of pipe roof rig drilling agency,U455.3
  6. Concrete Tied Arch nonlinear mixed- discrete variables optimization design,U448.225
  7. High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
  8. Dynamic characteristics of large - span steel box tied arch bridge and train running performance analysis,U441.3
  9. The Construction Control for PC Continuous Beam Bridge,U445.4
  10. Concrete-filled Steel Tubular Basket-handling Arch Bridge Vertical Swivel Construction Control Simulation Analysis,U445.465
  11. Mechanical Analysis of the Deck Paving on the Cement Concrete Bridge with Different Waterproof and Cohesive Layers,U443.33
  12. A Technique Research on Maintaining the Foundationpit of the Large Passenger Railway Station,U231.3
  13. Functionally graded plate with a hole stress analysis,O344.1
  14. Structural Static Force Analysis and Optimum Design of High Pressure Vessel for CNG Based on ANSYS,TE972
  15. Numerical Simulation and Deformation Control of Deep Foundation Pit Support of the Experimental Building in Northeastern University at Qinhuangdao,TU753
  16. Structural Analysis of Frame Considering Bending and Shearing Deformation Characteristics of Joint,TU391
  17. Research on Application of Two Different Lengths of PVDs in Vacuum Preloading Method,TU472.33
  18. 140m high-speed railway steel box tied arch bridge construction technology,U445.4
  19. The Influence Analysis of Stiff Skeleton on the Closure Section of the Bridge by Cantilever Construction Method,U445.4
  20. Construction Monitoring and Control of Tied-arch Bridge with Flying Swallow,U448.225
  21. The Basic Process Research of Directly Plasma Forming Functional Gradient Materials,TB34

CLC: > Transportation > Road transport > Bridges and Culverts > All kinds of bridges > Bridge: Structure > Arch bridge > Tied Arch Bridge
© 2012 www.DissertationTopic.Net  Mobile