Study on Project Scheduling Problem Based on Modular Outsourcing

Author: BaoYinLi
Tutor: ChaiGuoRong
School: Lanzhou University
Course: Business management
Keywords: Project Scheduling Modular Project Modular Outsourcing Design Structure Matrix
CLC: F224
Type: Master's thesis
Year: 2011
Downloads: 40
Quote: 0
Read: Download Dissertation

Abstract


Diversification of customer needs, the traditional centralized, high-volume production model has been difficult to adapt to the modern market. As the market conform to the personalized needs of organizational structure and production tends to be more project-way operation. In the 21st century, the rapid development of high-tech fields makes the product easy to imitate, the product tends to homogenization. In order to improve competitive advantage, companies began to pay more attention to products to market faster, greatly shorten the product life cycle. The face of changing market conditions, \Companies to reduce investment risk by way of integrated enterprise outsourcing external resources, thereby reducing the investment in fixed assets. Flexibility and efficiency to become enterprises face two problems. Flexible production systems and time purchasing technology, offers the possibility of manufacturing enterprises. Companies can improve product diversity premise, while reducing product delivery time. Project-oriented enterprises, since the project is more personalized, and can not pursue economies of scale. Lean production in the global context, the project also need to peel the project according to the theory of value of some non-core activities to enhance project benefits to shorten the project duration. Firstly, the resource-constrained project scheduling problem and consider outsourcing the general scheduling problem situations were summarized. Consider outsourcing scenario with the general scheduling problem compared to the situation described considering outsourcing project scheduling problem characteristics. Since there exists a complex project activity dependencies, activity units may be fragmented outsourced some logical connections between activities, thereby increasing the contractor and coordination of information between the outsourcer and management costs. To solve this problem and to coincide with the project management practices, the need for modular operating project activities will focus on activities related to unified scheduling module, thus forming a \Using design structure matrix theories constructed a modular project network, and through outsourcing factors analysis module primaries. In the current resource-constrained project scheduling problem based on the introduction describes the outsourcing decision variables, objective function and constraints from the two aspects of the problem to build basic optimization model and its algorithm, and gives a concrete numerical example. Solving The results showed that the elimination of the modular outsourcing contractor resource bottlenecks, reducing the rate of idle resources, and thus resulting in a good synergy, so the project can effectively improve the income and reduce the size of the project duration.

Related Dissertations

  1. Analyzing for Couping Feature and Optimization for the Complex Product Configuration Model and Its Application in High-End CNC Industry,TG659
  2. Planning and Schedling of Production Transferring Projects of International Company,F276.7;F273
  3. Research on Key Technologies on Intelligent CAD Platform of Feedwater Heaters for Power Plant,TP391.72
  4. Methodology of Process Planning of Collaborative Product Development,TB497
  5. Research of Software Project Resource Scheduling Based on CGA,TP311.5
  6. Collaborative Product Development Process Management of Optoelectronic Enterprises Supporting Process Optimization,F273.2
  7. Study on Multi-Mode Resource-Constrained Duration-Cost Trade-off Problem,F284
  8. Research on Optimization Algorithm of Multiobjective Fuzzy Project Scheduling,O221.6
  9. Process Management Technology Research with Unforced Decoupling and Adaptive Granularity Control on Product Concurrent Development,TB497
  10. Study on Multi-Mode Resource-Constrained Duration-Cost Trade-off Problem,TP301.6
  11. Design and implementation of pretreatment system based on the long-haul design structure matrix,TP311.52
  12. Research on Schedule Plan and Schedule Control of Construction Project of Zuo an Lv Zhou,F284
  13. Research on Project Scheduling with Uncertain Environment,TP18
  14. Research and Application on Method of Feedback Requirement Navigation and Virtual Configuration Cost Estimation,TP391.72
  15. Constraint Propagation Based Algorithms for Solving Resource-Constrained Project Scheduling Problems,F270
  16. Research on Schedule Plan and Schedule Control of Real Estate Project of Zhengda Company,F293.3
  17. Execution Sequence Planning of Aircraft Computational Models in Conceptual Design Phase,V42
  18. Product Design Based on the Co-evolution of Axiomatic Design Matrix and Design Structure Matrix,TB472
  19. Process-based planning Aircraft Assembly Design Navigation Technology Research and Implementation,TP391.72
  20. Practice of Multi-project Management in A Multi-national Company Global Sourcing Center,F253.2;F276.7
  21. Research on Project Scheduling Problem with Equipment Renting,F284

CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net  Mobile