Study on Production Testing for Gas Wells in Xujiaweizi Deep Reservoirs

Author: XuGui
Tutor: WangXiaoDong;GaoPing
School: Chinese Geology University (Beijing)
Course: Petroleum and Natural Gas
Keywords: liquid discharge gas well testing work system optimization production analysis
CLC: TE373
Type: Master's thesis
Year: 2009
Downloads: 145
Quote: 0
Read: Download Dissertation

Abstract


At present , Xushen Volcanic Gas Reservoir is on the exploration and development stage. Xujiaweizi deep special lithology gas reservoir(most is volcanic gas reservoir) is typical of tight reservoir. It has character of serious nonhomogeneity, big difference of permeability, complexity distribution of gas and water, lithologic complexity severity, high temperature and high pressure, great difference of single well productivity. So we can conclude that special characteristic and difficulty in production is quite different from normal gas reservoir. Nowadays, the number of volcanic gas reservoir which has been found in the world is numbered, there is no gas well testing method and experience for reference.There are four parts in this paper. First, gas well testing work system optimization, through the theory study and calculating, analysis continuous liquid discharge terminal flowing quantity, solving the optimizing problem in well testing of gas &water well and low production well. Through using three graphs in single flowing well curve ,and nodding analysis method, confirm the reasonable well testing working system, solving the oil mouth optimizing problem and production formula building problem in well testing. In the study of liquid discharge by shut off- open well, building mutative skin coefficient seepage math model and application method by gas seepage theory, base on the well bore pressure data, stratum physics character and forepart production data, explaining mutative skin coefficient and estimating effect in time, offering foundation for fieldwork decision-making. Second, for the low porosity and permeability, research the affect of absolute open flows production in imitated state in well testing process . Pointing out the applicability of conventional gas well productivity analysis, deducing transient production rate binomial deliverability equation by pressure draw down stack method, improving calculate precision of absolute open flow production. Third, build the primary well testing method of production testing in Xujiaweizi deep gas reservoir, choosing method of parameter forecast in production test of gas production testing.Through the research, solving the illogicality of geologic purpose and filed working, buildup liquid discharge and well testing method after fracturing, improving testing efficiency, analyzing and evaluating gas well production exactly.

Related Dissertations

  1. High voltage discharge in water to generate hydrogen peroxide Law of,X703
  2. The Cleaner Production Process in the Smelting of Bismuth,X38
  3. Test the application of gas chromatography gas composition at the scene,D918.2
  4. The Research of Yanbian Modern Agricultural Development Question,F327
  5. Liquid discharge catalytic technology for wastewater treatment research,X703
  6. Clean Production Audition Applied on the Environmental Impact Assessment of Specific Construction Projects Study,X820.3
  7. Analysis and Application Numerical Welltest Analysis in Gas Wells,TE353
  8. On-line Determination Method of High Concentration Chlorine Dioxide Gas,O613.42
  9. Gas drilling LWD reservoir evaluation studies,TE21
  10. Research on the Application of Oil Fingerprints Technique in Oil Wells Management,TE319
  11. The Chemical Productions Recycle in Coking Industry and Cleaner Production Analysis,X322
  12. Study on Physics Problem Representation of High-school Students,G633.7
  13. The Elgar \,J622.3
  14. Criminal’s Labor Certain Question Research,D926.7
  15. Study for Sand Body Analysis in Complex Fault Block Reservoir Using Reservior Monitor Data,P618.13
  16. Study on Experiment and Setting of Electro-hydraulic Discharge Degrading TNT Wastewater,X703
  17. Theory and Application on Flow in Multi-layer Reservoir,O357.3
  18. The Measurement and Analysis of Variable Cam Timing Mechanism,TK403
  19. Psychological analysis of borderline personality disorder,B848
  20. The Study on Test Project Design Technology for Deep Gas Well,TE373

CLC: > Industrial Technology > Oil and gas industry > Oil and gas development and mining > Gas field development and exploitation of > Gas field well test
© 2012 www.DissertationTopic.Net  Mobile