Dissertation > Excellent graduate degree dissertation topics show
Aerospace Power R \u0026 D multi-project schedule management research
Author: ZhuZhengYong
Tutor: FengJunWen;WeiJunHua
School: Nanjing University of Technology and Engineering
Course: Project Management
Keywords: space power sources multi-projects management critical chain buffer management
CLC: F426.5
Type: Master's thesis
Year: 2011
Downloads: 95
Quote: 0
Read: Download Dissertation
Abstract
|
The rapid development of China aerospace industry had provided important guarantee for enhancing the overall national strength and safeguarding the national security. The space power sources had been listed as one of the three core components, as a style of new technology development, its development style played an important role in aerospace industry. With the continuous increasing of the developing tasks of the space power sources, the problem of resource conflicts and too long developing cycle was highlighted day by day, the traditional schedule planning methods has not been adapted to the multi-projects management in the factory.In this paper, the deficiency of the traditional project schedule technology was analyzed based on descriptions of the traditional project schedule planning methods, the critical chain method was used in the plan scheduling and control of the multi-projects, and the validity and stability of the multi-projects schedule management was improved. The multi-projects schedule management scheme for the space power sources based on critical chain technology was put forward and the critical factors for implementing the scheme was analyzed. The management system for multi-projects resource coordination was analyzed, and the effective resources constraint plan was set up based on the establishment of evaluation system of priority level index for multi-projects and the evaluation of the priority level with factor score method. During the risk management of multi-projects, based on the three point estimation method of PERT, the buffer capacity was estimated by taking account of the position weight (α) and the coefficient of elasticity (β), the contribution value to the project buffer and feeding buffer by every task was calculated according to the level of uncertainty of the activity, and the reasonable buffer value was obtained. In the subsequent schedule controlling process, the schedule tracing and controlling mechanism based on task sequence penetration and buffer penetration was established. Then the development of thermal battery multi-projects was taken as example to expatiate the concrete application of the method. The Microsoft Project 2003 software was used to make the schedule plan respectively based on the traditional network planning methods and critical chain technology, and the two kind of plan were compared. The tracing and controlling mechanism based on PB and FB was described, thereby the final goals were achieved smoothly.
|
Related Dissertations
- Based on Critical Chain Schedule Management Research of Technology of a Highway Maintenance Engineering,U415.1
- Applied Research of Critical Chain Management in D Company’s Nuclear Power Equipments Manufacture Project Scheduling Management,F426.61;F224
- Based on the Critical Chain Method of Jidong Oil Process Control System Engineering Project Schedule Management,TE35
- Research of Multi-project Robust Scheduling Based on Critical Chain,TH186
- Research on Resource-constrained Project Scheduling with Critical Chain for Multi-project,F272
- Research on Multi Project Schedule Management Based on Critical Chain,F426.471
- Study on the Application of the Critical Chain Project Management in Non-Standard Equipment Manufacture Projects,F224
- Research on Multi-Project Critical Chain Bundle Identification and Resource Leveling,F272
- Schedule Management of Multiple Software Projects Based on Critical Chain Method,TP311.52
- Zero Inventory Management Base on Schedule Plan of S Enterprise,F253.4
- Research and Practice on Time Optimization of PC Board Design Project,TP331
- Research on the Buffer Sizing Method in Critical Chain Project Management,F224
- EPC Project Cost Management Research Based on Lean Construction,F285
- Research on Reliable Multicast Protocol and It’s Buffer Management,TP393.04
- Aquaculture whole management system development project management research and practice,TP311.52
- The Design and Implementation of Gigabit Network Packet Capture Platform,TP393.08
- Research of Low Voltage Power Network Automation Project Schedule Management,F407.61
- Project Management in PDM implementation of applied research,F270.7
- Research on Buffer Management for Video Coding Rate Control,TN919.81
- China's shipbuilding industry Production Planning and Control,F426.474
- An Investigation of Critical Chain’s Scheduling and Buffer Monitoring Based on PERT,F284
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|