Construction Control of Long-span Continuous Bridge

Author: YangTao
Tutor: HuoKaiCheng
School: Wuhan University of Technology
Course: Structural Engineering
Keywords: continuous beam bridge construction control alignment error stress control grey control system
CLC: U445.4
Type: Master's thesis
Year: 2009
Downloads: 142
Quote: 1
Read: Download Dissertation

Abstract


The constuction of continuous girder bridges which adopt cantilever laying method, usually needs a complex process.It will be affected by many certain and uncertain factores. The actual construction state of the bridges might deviate from the state of the theoretical design. In order to guarantee the bridge construction quality and the bridge construction security,make sure the main girder alignment and structure internal force is consistent with the design requirements, The bridge construction control is essential.This article,firstly, Bahe river bridge in Hubei Province Macheng to Xishui section of Daqing to Guangzhou highway as the project background,elaborates the basic principle,the actual content and the basic principle of construction control technologies of the long span prestressed concrete continuous beam bridge.It proposes the correct construction control plan which fit for this bridge.It also uses large-scale computation software MIDAS/Civil to carry on the simulation analysis to the Bahe river bridge main span construction process, and introduces the modelling step in detail.It Effectively grasps the stress and the displacement condition of each essential construction stage during the construction process, and provides the reliable data for the construction control work.Secondly, this article discusses the alignment error analysis during the constuction control process emphatically. It takes calculation and comparison in seven ways which influence the alignment of the main bridge. During the construction control process, it uses the GM (1,1) model to make the science forecast for each segment camber’s adjustment value, and obtains the precisely elevation of each setting up template.Before the entire bridge closure, it contrastive analysis and summarizes the spot data and calculated value.From the analysis conclusion, this bridge’s construction control plan is practical and feasible, and has made the good progress.Finally,it introduces the stress sensor’s choice and the arrangement of the Bahe river bridge main span construction process. This article discusses process stress error sources during the pontic construction process, which include steel string strain gauge’s installment, zero alignment own factor influence, as well as concretes elasticity coefficient, concretes strain lag, temperature and other external factors’ influence,and proposes the plan of stress amends.It makes contrastive analysis between the measured stress on the spot and the theoretical value. The analysis conclusion shows that this bridge’s construction control plan is practical and feasible, and has made the good progress.

Related Dissertations

  1. A project supervision model of multi-project management company,F284
  2. Experimental and theoretical analysis of the reinforcement and restoration widens box girder,U441
  3. Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
  4. Large Span Prestressed Concrete Continuous Rigid Frame Bridge Analysis and Construction Control of Long-term Practice of Deflection,U448.23
  5. The Construction Control for PC Continuous Beam Bridge,U445.4
  6. The Analysis of Multi-span Prestressed Concrete Continuous Girder Bridge’s Reasonable Closure Sequence,U445.4
  7. Single Tower Cable-stayed Single Cable Plane Design, Construction and Construction Control Technology,U448.27
  8. Study on the Road Performance of Asphalt Rubber Gravel Seal Coat,U414
  9. Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
  10. Study on Concrete Creep Theory Applied in Construction of Continuous Rigid Frame Bridge,U445.57
  11. Model Test on Vehicle-Bridge Couped Vibration for the Long-span Bridge with High-pier,U441.3
  12. Research on Prestressed Concrete Continuous Rigid-frame Bridge Construction Control and Fold Technology,U445.4
  13. The Construction Control Research on the Long-span Continuous Rigid Frame Bridge,U445.4
  14. Cantilever Casting Construction Technology of Yanghe Bridge,U445.466
  15. Construction Stress Analysis and Control of Long-span Arch Bridge,U448.22
  16. New concrete block wall cracks survey and research quality defects,TU746.3
  17. Study and Practice on Monitoring Technology of Cantilever Construction for the Songhuajiang Continuous Box Girder Bridge,U445.466
  18. The Key Techniques for the Construction of Jinan Yellow River Bridge on Qingdao-Yinchuan Highway,U445.4
  19. Cable-stayed Bridge Construction Control Analysis and Research,U448.27
  20. Continuous Rigid-frame Bridge Construction Monitoring Analysis,U445.4
  21. Construction Control Research of Steel Truss Stiffening Girder of Suspension Bridge,U448.25

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology